Original source · versioned page text
8. Appendix D - Traffic Engineering Report
Traffic Impact Assessment Report
Wedding Venue, Ringtail Creek
For Louis Bazzo Pty Ltd
June 2024
assessment takes into account the shortest/quickest routes, and the number of
intersections along the route.
The assignment of trips will be 100% arrivals during the critical peak period for the
commencement of an event and 100% departure for the completion of an event.
Based on existing traffic data and the location of the site with reference to
surrounding town centres and residential and accommodation catchments, it is
expected that 85% of development generated vehicles will travel to and from the
east via McKinnon Drive (Tewantin and Noosa) and 15% will travel to and from the
west via Pomona Kin Kin Road (Pomona). A diagrammatic distribution of
development generated arrival trips is shown in Figure 4. Departing trips are
expected to be the opposite with 25 trips turning right out and 4 trips turning left
out of the development access.
Figure 4 - Proposed Development Traffic Distribution (Arrivals)
Page 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.