7.2 OVERALL DEVELOPMENT SITE CATCHMENT INFILTRATION –
    QUANTITY MUSIC MODEL

The above Quantity MUSIC model is utilised to predict quantity of rainfall
infiltrated over the site for a 10-year horizon and using the Cooroy Rainfall
Station as a meteorological base.

For simplicity the model conservatively ignores bioretention, swales,
rainwater harvesting and reuse.

A separate Quality MUSIC model discussed in Section 6 is utilised to predict
quality of stormwater achieved prior to infiltration.


7.2.1 DETERMINATION OF INFILTRATION RATES FOR QUANTITY
MUSIC MODELLING


MUSIC model infiltration parameters do not consider varying infiltration
rates with increasing driving head whilst observations during prototype tests
in both 2003 and 2024 indicated a generally linear relationship.

For MUSIC Modelling purposes a decision was made to adopt infiltration
rates of 3,600mm/hour (1mm/second) as recommended for coarse sands in the
MUSICX1.0 modelling guidelines.

 This rate is considered to be extremely conservative being 18 to 46 times
lower than those observed on site for 1m of driving head.

7.2.2 DETERMINATION OF EXTENDED DETENTION DEPTHS FOR
QUANTITY MUSIC MODELLING


Extended detention depth parameters were generally set to design RIP/RIC
depths.

For RIPs incorporated into the external catchment drainage line extended
detention depth parameters were set to the depth of RIP over-run below the
stormwater pipe.




__________________________________________________________________________

A6769/25/SWMP/Rev OpW(A) – Feb 2025
                                                                             Page 12 of 9
SH/PL
                         Brah101 Pty Ltd t/as ALTA PROJECTS

Used in these records

About this file

File size
9.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Stormwater Management Plan -OPW (A).pdf · 9.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.