Skip to the record
Accept no imitations.

Council archive · source document

Stormwater Management Plan -OPW (A) · OPW25/0042

of 61

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn

Original PDF page 16, section 1. The text section number identifies this passage in the reader.

7.2.3 DETERMINATION OF OTHER PARAMETERS FOR QUANTITY
MUSIC MODELLING

7.2.3(A) DEPTH OF INFILTRATION MEDIA
Set at 0.3m for all RIPs/RIC reflecting depth of rock spalls below.

7.2.3(B)UNLINED FILTER MEDIA PERIMETER
Set at sum of perimeter of RIPs/RIC (conservative-ignores rock spall
overspread)

7.2.3(C)FILTER AREA

Set at area of base of RIPs/RIC (conservative-ignores rock spall overspread).


A conceptual layout of the treatment train as input to the Quantity MUSIC
Model is shown in Figure 7.2 below.




Figure 7.2 : Quantity MUSIC Model Layout
__________________________________________________________________________

A6769/25/SWMP/Rev OpW(A) – Feb 2025
                                                                             Page 13 of 9
SH/PL
                         Brah101 Pty Ltd t/as ALTA PROJECTS

Used in these records

About this file

File size
9.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Stormwater Management Plan -OPW (A).pdf · 9.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.