Skip to the record
The only place to find full transcripts.

Council archive · source document

Stormwater Management Plan -OPW (A) · OPW25/0042

of 61

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn

Original PDF page 21, section 1. The text section number identifies this passage in the reader.

8.2 QUALITY MUSIC MODEL RESULTS


The results of the Quality MUSIC model are shown in Table 8.2 below.


                               Flow          TSS         TP           TN              Gross
                               ML/y          Kg/y        Kg/y         Kg/y            Pollutant
                                                                                      Kg/y
        Source Load            19.32         1035        3.825        40.27           414.6
        Residual Load          14.86         181.2       1.239        19.48           0
        % Reduction            23.06         82.48       67.6         51.62           100
        %Target Reduction -                  85          60           45              90



        Table 8.2 Treatment Train Effectiveness



Inspection of Table 8.2 shows that the target pollutant load reductions will be
achieved for the developed site.




9.0 SYSTEM MAINTENANCE

RIPs/RICs, bioretention basins and the rainwater harvesting tank will be
subject to routine inspection and maintenance by the hotel’s maintenance
team and such maintenance is critical to their ongoing function.

Failure to carry out such maintenance could result in system failures,
environmental harm and surcharge of infiltration pits and culverts.

A recommended maintenance schedule for elements of the water quality
treatment and train and infiltration devices appears at Appendix F.
__________________________________________________________________________

A6769/25/SWMP/Rev OpW(A) – Feb 2025
                                                                                  Page 18 of 9
SH/PL
                          Brah101 Pty Ltd t/as ALTA PROJECTS

Used in these records

About this file

File size
9.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Stormwater Management Plan -OPW (A).pdf · 9.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.