Skip to the record
Noosa’s premier civic archive.

Council archive · source document

Stormwater Management Plan -OPW (A) · OPW25/0042

of 61

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn

Original PDF page 20, section 1. The text section number identifies this passage in the reader.

Quality Modelling has been undertaken using the ‘split catchment’ method.
The Rainfall Runoff Parameters for the source catchments have been taken
from table 3.7 of Water By Design’s – MUSIC Modelling Guidelines, Version 1.0
2010 and are shown in Table 8.1 below.



          Pervious Area Properties

           Soil Storage Capacity (mm)                             18

           Initial Storage (% of Capacity)                        10

           Field Capacity (mm)                                    80

           Infiltration Capacity Coefficient ‘a’                  243

           Infiltration Capacity Exponent ‘b’                     0.6

          Groundwater Properties

           Initial Depth (mm)                                     50

           Daily Recharge Rate (%)                                0

           Daily Baseflow Rate (%)                                31

           Daily Deep Seepage Rate (%)                            0

           Rainfall Threshold (mm)                                1


Table 8.1: Rainfall Runoff Parameters & Pervious Area Properties

The pollutant load concentrations for each source catchment have been taken
from Table 3.8 of the Water by Design MUSIC Modelling Guidelines Version 1.0,
2010 using the concentrations recommended for Urban Residential areas.

The model was run for an average rainfall recorded at Cooroy Rainfall Station
using a 6 minute time step.

Please refer to the electronic MUSIC model attached at Appendix J.




__________________________________________________________________________

A6769/25/SWMP/Rev OpW(A) – Feb 2025
                                                                             Page 17 of 9
SH/PL
                         Brah101 Pty Ltd t/as ALTA PROJECTS

Used in these records

About this file

File size
9.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Stormwater Management Plan -OPW (A).pdf · 9.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.