TEST SCHEDULE
TEST 1
TEST 2
TEST 3
Inf = 13 + 33H (mm/sec)
30
2.5
20
HEAD (M)
1.5
10
0.5
0
0 10 20 30 40 50 60 70 80 90 100 110
INFILTRATION RATE (mm/SEC)
NOTE: ONLY DRAWINGS MARKED "FOR CONSTRUCTION" AND BEARING AN ORIGINAL SIGNATURE SHALL BE USED FOR CONSTRUCTION PURPOSES. Design: PBL PROJECT: DRAWING TITLE:
Brah 101 pty ltd t/a Alta Projects
Drawn: PBL PROTOTYPE RIC TEST RESULTS - 04 DECEMBER 2024
Date: AUG 2022
A.B.N. 91 611 354 511
26 Memorial Avenue, Cotton Tree PROPOSED HOTEL
PO Box 559, Cotton Tree, QLD, 4558 Revision Sheet
Checked: . . . . . . . . . . .
Tel (07) 5475 4125 Fax (07) 5479 1607 at 3-7 SERENITY CLOSE, NOOSA HEADS DRAWING No:
A6769-24-G01 1 of
Email: [email protected]
.......................
DIRECTOR APPROVAL Datum AHD
Web: http://www.alta.net.au for CALILE MALOUF INVESTMENTS
REV DATE DESCRIPTION BY CHKD RPEQ - 4784 A1 SHEET SIZE FILENAME : A6769-24-GRAPH.dwg - DATE : 27/2/25 - 2:21pm - XREF's: Council Ref:
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Stormwater Management Plan -OPW (A).pdfRelated documentApplication case desk ↗
About this file
- File size
- 9.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.