Council archive · source document
Stormwater Management Plan -OPW (A) · OPW25/0042
Plans and drawings: the text below has words only, no drawings.
Original PDF page 43, section 1. The text section number identifies this passage in the reader.
TABLE 1.0 RESULTS OF PROTOTYPE INFILTRATION PIT (IP) TESTING 23 JULY 2001 HEAD (M) 0 10 20 30 40 50 INFILTRATION RATE (mm/SEC) —_— eRe ee eee PROJECT: DRAWING TITLE: ‘WHE PROTSSOHA paees Py LD 7 TAL EE: tine ee oeosre, SETTLERS COVE — HIGH DENSITY RESIDENTIAL INGIETRATION [ETTATEST RSG RESUCTS) BL? eo 20 fo (07) 2443 724 at SERENITY CLOSE, NOOSA HEADS DRAWING No: CIGSG/0B/MCU/IP2 Revision: ORAWNG STATUS Design: CDF, Drown: CDF. Date: May 2008 Checked: SH, Datum: AKD, Emok engineers@otenct ov for SETERS COVE DEVELOPMENT Pry un Cauncil Ref; Sheet | of J PROFESSIONAL ENGINEERS Wet: Mte://wew.totenetou TACADTSOVUGIAALE NOAFRST GUDRUN ODCO OLED
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Stormwater Management Plan -OPW (A).pdfRelated documentApplication case desk ↗
About this file
- File size
- 9.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.