Council archive · source document
Stormwater Management Plan -OPW (A) · OPW25/0042
Plans and drawings: the text below has words only, no drawings.
Original PDF page 48, section 1. The text section number identifies this passage in the reader.
ELEMENT: MAINTENANCE OF RAPID INFILTRATION PITS (RIPs)/RAPID INFILTRATION
CULVERT (RIC) & SUROUNDING BIORETENTION
4. Performance Indicators No accumulated silt and debris in bioretention
basins or base of RIPs/RIC.
Bioretention basin vegetation healthy and
vigorous.
No ponding of water within bioretention basin or
RIPs/RIC.
5. Frequency/Deadline 3-Monthly inspections.
6. Responsible Person Hotel Management to ensure maintenance
/Organisation schedule adhered to.
7. Reporting and Review Maintenance Contractor to make entries in
environmental diary noting date of service for
each Bioretention and RIP, condition of
Bioretention and RIP/RIC, material removed and
means of disposal.
Random inspection by Council/EPA officers.
8. Corrective Action Review maintenance schedule as appropriate.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Stormwater Management Plan -OPW (A).pdfRelated documentApplication case desk ↗
About this file
- File size
- 9.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.