Council archive · source document
Stormwater Management Plan -OPW (A) · OPW25/0042
Plans and drawings: the text below has words only, no drawings.
Original PDF page 49, section 1. The text section number identifies this passage in the reader.
STORMWATER MANGAGEMENT DEVICES - MAINTENANCE PLAN
ELEMENT: MAINTENANCE OF STORMWATER PIT LITTER BASKETS
1. Objective To ensure ongoing function of litter baskets in
removing debris from stormwater.
To ensure ongoing function of litter baskets in
protecting bioretention basins and RIPs/RIC from
debris, litter and silt.
2. Management Strategy Litter baskets to remain free of debris, silt and
sediment build-ups.
3. Actions Maintenance contractor to inspect and service
litter baskets at 3-monthly intervals.
Any accumulated debris and silt to be removed as
required.
If heavy silting and/or discolouration of geofabric
filter is evident geofabric filter basket to be
replaced with equivalent.
All removed sediment/silt to be placed in skips or
bins for disposal.
4. Performance Indicators No accumulated silt and debris in litter baskets.
5. Frequency/Deadline 3-Monthly inspections.
6. Responsible Person Hotel Management to ensure maintenance
/Organisation schedule adhered to.
7. Reporting and Review Maintenance Contractor to make entries in
environmental diary noting date of service of litter
baskets, basket condition, material removed and
means of disposal.
Random inspection by Council/EPA officers.
8. Corrective Action Review maintenance schedule as appropriate.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Stormwater Management Plan -OPW (A).pdfRelated documentApplication case desk ↗
About this file
- File size
- 9.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.