Infrastructure Charges
44. This Development Permit will trigger an "Adopted Infrastructure Charge Notice" (if
applicable) to be issued in accordance with Council's "Adopted Infrastructure Charges
Resolution" under the State Planning Regulatory Provision (Adopted Charges) and the
Sustainable Planning Act 2009.
Qualified persons - Landscaping
45. For the purpose of preparing a Landscape Plan, a qualified person is considered to be a
landscape architect, landscape designer and/or horticulturist with a minimum of 3 years
current experience in the field of landscape design.
Building and Construction Industry (Portable Long Service Leave) Levy
46. The QLeave levy must be paid prior to the issue of a development permit where it is
required. Council will not be able to issue a Decision Notice without receipt of details that
the Levy has been paid. QLeave contact: 1800 803 481 (free call) or (07) 3212 6855.
Co-ordination of Operational Works Assessment
47. Additional application fees apply to Operational Work applications where the different
aspects of the works are lodged separately. Significant savings in application fees will
result if all works are lodged in a single application.
Preparation of a Preliminary Construction Management Plan
48. A preliminary Construction Management Plan must be submitted with the Operational
Works application and must address the following;
(a) traffic management during all aspects of the construction phase including:
(i) a Traffic Management Control Plan in accordance with the Manual of Uniform
Traffic Control Devices (MUTCD) detailing all temporary signage and traffic
control measures prior to construction
(ii) maintenance of safe pedestrian access for the areas affected by the works
during and after daily construction has ceased
(iii) proposed fencing to the site during the construction phase of the development
(iv) provision for worker car parking
(b) maintenance and protection of water quality and existing drainage lines through the
construction site, through the implementation of appropriate erosion and sediment
control measures
(c) works programme identifying key components of the works and their respective
durations
(d) establishment of a communication protocol with the general public, adjoining
owners, emergency services and local businesses to advise of agreed construction
times, impacts on traffic, services and other relevant issues
(e) identification of complaint management procedures including:
(i) contact details for the on-site manager
(i) dispute resolution procedures
(ii) it is acknowledged that the preliminary Construction Management Plan will be
a draft document requiring finaiisation upon appointment of the Principal
Page 10 of 36
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.