17. David Low Way must be upgraded for the length of its frontage to the subject site. The
works must be undertaken in accordance with an Operational Works approval and must
include in particular:
(a) construction of a pedestrian footpath in accordance with the conditions of this
Decision Notice
(b) reinstatement of the footpath and verge area to match the balance of the site
frontage, including the provision of topsoil and turf where the existing verge is
disturbed.
Site Access and Driveways
18. A sealed access driveway must be provided from David Low Way to all parking and
maneuvering areas of the development. The works must be undertaken in accordance
with an Operational Works approval and must include in particular:
(a) a driveway crossover in accordance with IPWEAQ standard drawing SEQ R-051
(b) suitable safety measures, including warning signage, to improve driver awareness of
pedestrians and enhance pedestrian safety
19. The internal driveway must be designed and constructed with widths, crossfalls and
gradients in accordance with Australian Standard AS/NZS 2890.1:2004 - Parking
Facilities.
Car Parking
20. A minimum of 12 car parking spaces must be provided and marked on the site. The works
must be undertaken in accordance with an Operational Works approval and must include
in particular:
(a) 3 visitor parking spaces within the total, which are clearly marked for that purpose
and accessible at all times for visitor use
(b) crossfalls and gradients in accordance with Australian Standard AS/NZS
2890.1:2004 - Parking Facilities
(c) garages, including door openings, in accordance with section 5.4 of Australian
Standard AS/NZS 2890.1:2004 - Parking Facilities
Pedestrian
21. Pedestrian facilities must be provided for the development. The works must be
undertaken in accordance with an Operational Works approval and must include in
particular a 2 metre wide concrete footpath within the road verge for the entire length of
the site's frontage to David Low Way.
Stormwater Drainage
22. The site must be provided with a stormwater drainage system connecting to a lawful point
of discharge. The works must be:
(a) generally in accordance with drawing number 17011-SW1 B prepared by SCG
Consulting Engineers
(b) undertaken in accordance with an Operational Works approval.
Electricity and Telecommunication Services
Page 6 of 36
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.