23. Unless otherwise stipulated by telecommunications legislation at the time of construction,
the development must be provided with all necessary conduits, pits and pipes to
accommodate the future connection of optic fibre technology telecommunications.
24. Certification must be submitted to Council from all relevant service providers which
certifies that the development has met the requirements of this Decision Notice and all
applicable legislation at the time of construction.
Earthworks and Retaining Walls
25. All fill and associated batters must be undertaken in accordance with an Operational
Works approval, and contained entirely within the subject site unless written permission
from the respective landowner(s) is provided to Council.
Damage to Services and Assets
26. Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
(a) where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
(b) where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and
assets must first be referred to the relevant service authority for approval.
ENVIRONMENT
Waste Storage
27. The developer must provide waste storage and disposal facilities in accordance with
Planning Scheme Policy 9, Waste Management, including an external imperviously paved
area correctly sized for all refuse and recycling containers and suitably screened from
public places and neighboring properties.
28. A bin wash area is required with a cold-water tap, hose and drain outlet connected to
sewer, via a bucket trap. The drain outlet must be designed to prevent storm water entry
to the sewerage system which can be achieved by a bunded area, with a nib wall height of
100mm maximum, enclosing a wash area of 700mm x 700mm minimum (max
0.7m2). Alternatively the waste area can be roofed, or any other appropriate design
approved by council that would prevent storm water entry to the sewer.
Noise
29. Written certification is required from a suitably qualified person confirming that sound
pressure levels from all mechanical plant and equipment comply with the following :
(a) Air-conditioning and Refrigeration
• 7am to 10pm: Maximum level allowable = background + 5dB(A)
• 10pm to 7am: Maximum level allowable = background + 3dB(A)
(b) Pumps
• 7am to 7pm: Maximum level allowable = background + 5dB(A)
• 7pm to 10pm: Maximum level allowable = background + 3dB(A)
Page 7 of 36
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.