Council archive · source document
Decision Notice - Advice Agency (Energex) 010.2008.00000203.001 [As Published] · 132008.203
-4-
Rainwater storage tanks shall not be located within any sewer easements
25. All stormwater drainage (including roof water overflow from the rainwater storage system)
shall be collected and discharged so there is no net increase in stormwater runoff from the
site. Stormwater drainage permitted to drain from the site shall be discharged to Council’s:
25.1. kerb & channel street drainage system in Robert Street.
The maximum discharge of stormwater drainage allowable to Council’s kerb & channel street
drainage system at any one location is 25 litres/second.
26. All site stormwater drainage shall be by means of a gravity system.
Sewer Mains
27. The proposed units shall be connected to Council’s existing sewerage reticulation systems
located in Bluefin Court and be constructed in accordance with Council’s standards and
requirements at no cost to Council.
Town Water Supply
28. The site shall be connected to Council’s existing town water supply and be constructed in
accordance with Council’s standards and requirements at no cost to Council.
29. Each individual water connection to the water reticulation system shall extend to the property
boundary and be metered. All fees for the supply of water meters shall be paid to the Council.
30. All water meters must be located outside the property boundary and in an easily assessable
location to facilitate unhindered reading by Council and/or Council’s contracted water meter
readers, and not behind fences or locked gates. In this regard approval of the water meter
configuration and location must be obtained from Council’s Water & Sewerage Capital Works
Manager prior to lodgement and approval of hydraulic drawings.
Individual water meters capable of being separately rated shall be installed for each unit.
31. For Multiple Uses (including Building Format Plans, Group Title Plans, Duplexes etc) the
development shall be served by:
31.1. A single Body Corporate water meter to measure the total water consumption, and
31.2. Individual water meters to each tenement capable of being separately rated, and
Earthworks
32. Any civil works and/or earthworks carried out on site shall not affect the structural integrity of
any of the existing fences, retaining walls or structures that border the development site.
Fences that are affected shall be replaced prior to the Building Certifier issuing the Certificate
of Classification. In this regard any fences to be replaced shall be clearly shown on the plans
submitted for Operational Works approval.
Erosion and Sediment Control
33. Any person acting on this permit shall prevent erosion and sediment export from leaving the
site. Site control measures such as silt fencing, controlled gravel access to the site and
controlled disposal of waste, will be necessary.
In this regard plans detailing the methods of controlling erosion and sediment are required to
be submitted to the Council for approval prior to obtaining a Development Permit for
Operational Works.
Contributions Towards Council Infrastructure
34. Monetary contributions shall be paid to Noosa Council towards the cost of providing and/or
upgrading various infrastructure at the rates applicable at the time of payment. An estimate
only of the contribution amounts under the current Council policies and requirements is
outlined in the table below:
4 of 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Advice Agency (Energex) 010.2008.00000203.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 68 KB (small file)
- File type
No other editions are linked here.