DBW Application - 30 Upper Pinbarren Creek Rd Pinbarren
PART 7 - FOR COMPLETION BY THE ASSESSMENT MANAGER - FOR OFFICE
USE ONLY
Date received: Reference numbers:
For completion by the building certifier
Classification(s) of approved building work
Name QBCC Certification Licence QBCC Insurance receipt
number number
Notification of engagement of alternative assessment manager
Prescribed assessment manager
Name of chosen assessment manager
Date chosen assessment manager engaged
Contact number of chosen assessment manager
Relevant licence number(s) of chosen assessment
manager
Additional information required by the local government
Confirm proposed construction materials:
□ Double brick □ Steel □ Curtain glass
External walls □ Brick veneer □ Timber □ Aluminium
□ Stone/concrete □ Fibre cement □ Other
□ Timber □ Steel □ Aluminium
Frame
□ Other_______
Floor □ Concrete □ Timber □ Other
□ Slate/concrete □ Tiles □ Fibre cement
Roof covering
□ Aluminium □ Steel □ Other
QLeave notification and payment
Note: For completion by assessment manager if applicable
Description of the work
QLeave project number
Amount paid ($) Date paid (dd/mm/yy)
Date receipted form sighted by assessment manager
Name of officer who sighted the form
Additional building details required for the Australian Bureau of Statistics
Existing building use/classification? (if applicable)
New building use/classification?
Site area (m2) Floor area (m2)
Page 6
DA Form 2 - Building work details
Version 1.2— 7 February 2020
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (DBW Application - 30 Upper Pinbarren Creek Rd Pinbarren.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.