ORDINARY MEETING AGENDA 20 JUNE 2019
20. Service vehicle movements associated with the approved use (including loading
and unloading) must not occur outside the hours of 6am to 6pm Monday to
Saturday and not at all on Sundays or public holidays. The requirements of this
condition must be included in the Community Management Statement for any body
corporate for the subject site.
External Works
21. The bus stop and associated infrastructure (e.g. bus shelter) on Elm Street shall
be relocated in accordance and in consultation with the Department of Main Roads
and Translink’s requirements. Any required adjustment to the pathway and kerb
must be carried out at the applicant/developer expense.
22. The full frontage of the site to Elm Street must be upgraded in accordance with an
Operational Works approval and must include in particular:
a. a new 2.0m wide concrete pathway
b. removal of any redundant property accesses and reinstatement of the kerb
and verge area to match the upgraded frontage, including the provision of
topsoil and turf where required
c. upgrading the existing pram ramp
Conditions 22 a and c are imposed pursuant to s128 of the Planning Act 2016
being necessary trunk infrastructure identified by Council’s LGIP to service the
development.
23. Diamond Lane must be upgraded for the full length of the frontage to the subject
site. The works must be undertaken in accordance with an Operational Works
approval and must include in particular:
a. Road widening, refuse truck loading zone and kerb and channel;
b. removal of any redundant property accesses and reinstatement of the kerb
and verge area to match the upgraded frontage, including the provision of
topsoil and turf where required; and
Condition 23 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure.
24. The road verge along the frontage of the site to Opal Street must be upgraded in
accordance with an Operational Works approval and must include in particular:
a. a new 2.0m wide concrete pathway with adjusted alignment and construction
methods as necessary to protect the survival of existing street trees
b. construction of car and scooter parking in accordance with the Infrastructure
Agreement
c. Reinstatement and landscaping
Condition 24 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure.
Pedestrian and Bicycle Facilities
25. The pedestrian link between Diamond Lane and Opal Street must remain available
to pedestrians during business hours.
25.26. Pedestrian and bicycle facilities must be provided for the development. The
works must be undertaken in accordance with an Operational Works approval and
must include in particular:
a. Internal pedestrian footpaths in accordance with the approved plans
b. a total of 8 bicycle parking spaces
Page 24 of 33
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.