26.27. All ground floor shopfront glazing must be protected against vandalism by the
use of a form of safety glass such as toughened or laminated glass.
27.28. During operating hours, all parking areas, pedestrian areas and
entrances/exits to all stairwells, foyers and public toilets must be well lit with vandal
resistant lighting and with intensities to satisfy the requirements of Australian
Standard AS1158 “Public Lighting Code”. Lighting must be designed to reduce the
contrast between shadows and well lit areas. In particular, appropriate security
lighting must be provided in the location shown at the corridor servicing the toilets
and change room.
Electricity and Telecommunication Services
28.29. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits
and pipes to accommodate the future connection of optic fibre technology
telecommunications.
29.30. Certification must be submitted to Council from all relevant service providers
which certifies that the development has met the requirements of this Decision
Notice and all applicable legislation at the time of construction.
Easements
30.31. Unless otherwise agreed in writing by the relevant service provider, any public
or third party infrastructure located on the subject site must be placed within an
easement registered against the title of the property.
31.32. All easements must be designed in accordance with the planning scheme and
granted at no cost to the Grantee. Where the Grantee is Council or a service
authority, the easement documentation must be in accordance with the Grantee’s
standard easement terms. Draft easement documentation must be submitted to
Council for endorsement.
32.33. All works must be kept clear of any existing or proposed easements on the
subject land, unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
33.34. All fill and associated batters must be undertaken in accordance with an
Operational Works approval, and contained entirely within the subject site unless
written permission from the respective landowner(s) is provided to Council.
34.35. All retaining walls must be designed and constructed in accordance with the
planning scheme and must be certified by an RPEQ where exceeding 1.0m in
height. All retaining walls that are publicly accessible and exceed 1.0m in height
must be fitted with a commercial grade safety fence.
Damage to Services and Assets
35.36. Any damage caused to existing services and assets as a result of the
development works must be repaired at no cost to the asset owner at the following
times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the
development.
Page 25 of 33
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.