ORDINARY MEETING AGENDA 18 JULY 2019
Acid Sulfate Soils
53. As the site is located below the 5m AHO, any excavation works consisting of
100m3 or greater and/or any filling works consisting of 500m3 or greater and
with an average depth of 0.5m or greater will need to be carried out in
accordance with State Planning Policy 2/02 Planning and Managing
Development Involving Acid Sulfate Soils. In this regard appropriate testing
and supporting documentation prepared by a suitably qualified specialist shall
be submitted to Council for approval prior to obtaining a Development Permit
for Operational Works.
Erosion and Sediment Control
54. Any person acting on this permit shall prevent erosion and sediment export
from leaving the site. Site control measures such as silt fencing, controlled
gravel access to the site and controlled disposal of waste, will be necessary.
In this regard plans detailing the methods of controlling erosion and sediment
are required to be submitted to the Council for approval prior to obtaining a
Development Permit for Operational Works.
55. Monetary contributions shall be paid to Noosa Council towards the cost of
providing and/or upgrading various infrastructure at the rates applicable at the
time of payment. An estimate only of the contribution amounts under the
current Council policies and requirements is outlined in the table below:
Contribution Required For: STAGE A STAGE B TOTAL
(in addition to Stage A+
Stage A) Stage B
PSP12 - Public Open Space $3,233 $0 $ 3,233
Contributions (Park)
PSP16 - Seweraqe Headworks $ 34,617 $ 14,785 $49,402
Contributions
PSP17 -Water Supply Headworks $29,629 $25,727 $55,356
Contributions
PSP20 - Pathway Trunk Network $ 3,266 $0 $3,266
Contributions
TOTAL Contribution Amount = $ 70,745 $40,512 $111,257
Please note that these amounts are all subject to variations in the Consumer Price Index,
All Groups Brisbane from SEPTEMBER 2008 until the date of payment.
All contributions must be paid prior to the issue of a Development Permit for
Operational Works for the relevant stage.
Alternatively a trading bank guarantee shall be submitted to Council plus 20%.
Should not be paid at the due time, Council shall call upon the trading bank
guarantee in full.
Processing of bonds for security where specific Council approval has been
given for the bonding of contributions will incur an administration fee in
accordance with Council's Land Development Commercial & Regulatory Fees
at the time of lodgement.
In the event that the Development Permit for Material Change of Use of
Premises lapses or is cancelled, the paid contributions and/or the trading bank
guarantee will be returned.
General
56. A suitably qualified Registered Professional Engineer shall prepare
engineering drawings and specifications for all engineering works that will
Page 11 of 39