ORDINARY MEETING AGENDA                                                          18 JULY 2019


              This Management Plan must set the objectives and include a plan indicating
              location and sizing of the devices prosed. The operational works application
              shall be in accordance with this plan and buildings must be modified if required
              to accommodate the treatment infrastructure wholly within the allotment.
              A maintenance plan for the treatment devices must be complied with for the
              duration of the approved uses.
              A Development Permit for Building Works must not be granted until a
              Development Permit for Operational Works has been issued in regard to the
              drainage scheme.
        47.   All site stormwater drainage shall be by means of a gravity system.
        Sewer Mains
        48.   All parts of the site shall be connected to Council's existing sewerage
              reticulation systems and be constructed in accordance with Council's
              standards and requirements at no cost to Council.
        Town Water Supply
        49.   All parts of the site shall be connected to Council's existing town water supply
              and be constructed in accordance with Council's standards and requirements
              at no cost to Council.
        50.   For Multiple Uses (including Building Format Plans, Group Title Plans, etc) the
              development shall be served by:
              50.1 A single Body Corporate water meter to measure the total water
                   consumption (including fire hose reels, but excluding fire hydrants and
                   fire sprinkler systems), and
              50.2 Individual water meters to each tenement capable of being separately
                   rated, and
             50.3 A fire service (fully testable single detector check with metered bypass),
                  where applicable, for flows to fire hydrants and fire sprinkler systems
                  (excluding fire hose reels).
        Earthworks
        51.   Filling works required on site shall be carried out in accordance with Section
              3.8 of Council's Engineering Design Standards Manual and so as not to cause
              the additional ponding of water on any adjoining lands or the blockage of, or
              interference with, any existing overland flowpaths. Detailed site surveys
              indicating natural surface levels and contours of the adjoining properties must
              be provided with the application for a Development Permit for Operational
              Works for Filling and Drainage.
              This may require the design and construction of drainage pipes and/or an
              overland flow- path within the development site that caters for drainage from
              the adjoining sites for a design storm with an Average Recurrence Interval of
              1 in 100 years. A private easement for the Drainage of Water encompassing
              the drainage pipes or overland flow-path will also be required. In this regard a
              Development Permit for Operational Works shall be obtained.
              Should evidence be provided to Council indicating that no additional ponding
              of stormwater will occur on the adjoining properties the requirement for the
              drainage pipes, overland flow- path and easement shall not apply.
        52.   Earthworks carried out on site shall not affect the structural integrity of any of
              the existing fences or structures that border the development site. Fences that
              are affected shall be replaced prior to the Building Certifier issuing the
              Certificate of Classification. In this regard any fences to be replaced shall be
              clearly shown on the plans submitted for Operational Works approval.

                                                                                 Page 10 of 39
Log in to download the original file

2019-07-18 Ordinary Meeting Agenda(PDF, 1009KB).pdf · 1.0 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.