FURTHER REPORT - Planning & Environment Committee 6 May 2025 MCU21/0110
36. After hours access to loading docks, storage areas and the basement carpark
(including the vehicle ramp and all stairwells) must be restricted by a security gate,
lockable doors and/or other suitably appropriate means. The basement carpark must
be kept closed and locked at all times while the use is not operating.
Community Management Statement
37. Any proposed Community Management Statement required for the development
pursuant to the Body Corporate and Community Management Act 1997 must be
submitted to Council for endorsement at the same time as submission of the Building
Format Plan (or similar) to Council for compliance assessment.
38. All clauses and by-laws of the proposed Community Management Statement must
accord with the requirements of this Decision Notice.
Water & Sewer Connections
39. An underground connection to reticulated water and sewerage must be provided to the
development site in accordance with the standards and requirements of Northern SEQ
Distributor–Retailer Authority (Unitywater).
40. A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority
(Unitywater) must be submitted to Council that certifies an underground connection to
reticulated water and sewerage has been provided to the development site.
ENGINEERING/TRAFFIC
Site Access and Driveways
41. A sealed access driveway must be provided from the internal service road to all parking
and manoeuvring areas of the development. The works must be undertaken in
accordance with an Operational Works approval and must include in particular:
a. a driveway crossover in accordance with Council’s standard drawing RS-051 and
respective addendum; and
b. suitable safety measures, including warning signage, to improve driver
awareness of pedestrians and enhance pedestrian safety. Warning signage must
be provided near the exit ramp from the underground parking area to warn
motorists of pedestrian movement along the frontage street.
Car Parking
42. Car parking must be provided in accordance with the approved plans and as amended
by the conditions of this approval. The works must be undertaken in accordance with
an Operational Works approval.
43. The parking layout is to be in accordance with the requirements of AS/NZS 2890.1-
2004
44. Provision of vandal resistant public lighting with intensities to satisfy the requirements
of Australian Standard AS1158: Public Lighting Code;
45. All car parking areas and access driveways must be maintained exclusively for vehicle
parking and manoeuvring and kept in a tidy and safe condition at all times.
46. Directional signage must be provided to direct visitors and customers to the car parking
spaces provided on site.
Security Access to Carpark
47. Where access to the carpark is proposed to be restricted by a security gate, provision
must be made for queuing of vehicles clear of the roadway while waiting for the security
gate to open.
Document Set ID: 22048375
Version: 34,
32, Version Date: 24/10/2023
05/07/2023
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewSearchable page text hides email addresses. Original files are unchanged and may show email addresses.