FURTHER REPORT - Planning & Environment Committee 6 May 2025 MCU21/0110
48. Where a secure carpark services a commercial use on the site, the security gate must
remain open at all times while commercial uses on the site are open for business. The
requirements of this condition must be included in the Community Management
Statement for anybody corporate for the subject site.
Service Vehicles
49. Service vehicle parking, manoeuvring and standing spaces must be provided on the
site. The works must be undertaken in accordance with an Operational Works
approval.
Pedestrian and Bicycle Facilities
50. Pedestrian and bicycle facilities must be provided for the development. The works must
include in particular:
a. signage and lighting at strategic locations to direct people to building entries and
public toilet facilities;
b. a total of 53 bicycle parking spaces; and
c. end of trip facilities involving 27 lockers, 6 showers and change rooms within the
development.
Water quality and quantity
51. The site must be provided with a stormwater drainage system connecting to a lawful
point of discharge. The works must be undertaken in accordance with an Operational
Works approval and the Queensland Urban Drainage Manual
52. A stormwater quality treatment system must be provided for the development. The
works must be undertaken in accordance with an Operational Works approval and the
Bioretention Technical Design Guidelines (Water by Design, 2012), and must include
in particular:
a. stormwater quality treatment devices of a size and location generally in
accordance with those shown in Drawing No. C6070/20/P07 prepared by Walsh
Consulting Engineers dated 26/10/2021, with the exception of the following:
i. Bioretention filter area is to be increased in size to the area stated for
bioretention surface area on the above referenced plan
b. bioretention devices which:
i. are designed generally in accordance with IPWEQA Standard Drawing
No.s DS-073, DS-075 and DS-076
ii. are provided with a free-draining outlet from the sub-soil drainage system
53. Permanent educational signage* must be erected to educate the residents of /
customers to the development about the function of the bioretention device(s). The
dimensions, standard, presentation and location of the educational signage must be in
accordance with an Operational Works approval.
54. All stormwater quality treatment devices must be maintained in accordance with the
Water by Design (2009) Maintaining Vegetated Stormwater Assets (Version 1). The
approved Operational Works drawings for the stormwater quality treatment system and
detailed life cycle costing of the system must be attached as an addendum to this
document. Records of all maintenance activities undertaken must be kept and made
available to Council upon request.
55. Operating roof water harvesting tanks must be provided for the development. The tanks
must be provided in accordance with an Operational Works approval and must include
in particular:
a. a total tank capacity of 135,000 litres
b. a catchment of not less than 2,800m2 of the building roof area
Document Set ID: 22048375
Version: 34,
32, Version Date: 24/10/2023
05/07/2023