FURTHER REPORT - Planning & Environment Committee 6 May 2025 MCU21/0110

of 245

Page text read automatically using OCR, there may be inaccuracies

PLANNING AND ENVIRONMENT COMMITTEE MEETING REPORT                                             6 MAY 2025


Currency Period
     7.       This development approval lapses if the use has not happened by 15 May 2031 unless
              an application to extend the currency period is approved by Council.
Ventilation
     8.       All internal use areas of the accommodation use including hotel suites, common areas,
              office, dining, bar and lobby areas shall be fully air-conditioned, allowing external
              façade elements (doors and windows) to be closed if required. Fresh air makeup to the
              air conditioning systems must be drawn from roof level locations located as far as
              practical from the Noosa Wastewater Treatment Plant.
     9.       Activated carbon filtration must be installed on all fresh air makeup locations of the air
              conditioning systems and must be regularly maintained to manufacturer specifications.
Outdoor Use Areas – swimming pools and tennis courts
     10.      Use by guests and visitors of the tennis courts, is limited to the following time periods:
                i.      7am to 6pm:      Four courts
                ii.     6pm to 9pm:      Two courts only
               iii.     9pm to 6am:      No usage of tennis courts
     11.      Use by guests and visitors of the swimming pools is limited to the time period 6am to
              12am only.
Acoustic
     12.      An updated acoustic report must be submitted to Council prior to the issue of an
              Operational Works approval. The amended acoustic report must include
              recommendations to address the impact on residential amenity attributed to vacuum
              truck operations on the site and provide acoustic mitigation measures to achieve
              compliance with the noise criteria proposed in Section 6.2.4.1 of the Trinity Noise
              Impact Assessment Report dated 20 February 2025. The recommendations of the
              acoustic report must be implemented prior to the commencement of the approved
              uses.
Noise Limits
     13.      Noise generated by the development must not exceed the following criteria at any off-
              site noise sensitive receptor:

               Period                 Background Noise Level   Overall Noise Limits   Design Component
                                      L90 dBA                  Leq,adj,T dBA          Noise Limits Leq,adj,T
                                                                                      dBA

               Day                             36                      41                       39
               (7am to 6pm)

               Evening                         31                      36                       34
               (6pm to 10pm)

               Night                           28                      31                       28
               (10pm to 7am)




                                                                                             Page 3 of 12

Log in to download the original (FURTHER REPORT - Planning & Environment Committee 6 May 2025 MCU21_0110.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.