FURTHER REPORT - Planning & Environment Committee 6 May 2025 MCU21/0110
PLANNING AND ENVIRONMENT COMMITTEE MEETING REPORT 6 MAY 2025
b. suitable safety measures, including warning signage, to improve driver awareness
of pedestrians and enhance pedestrian safety. Warning signage must be provided
near the exit ramp from the underground parking area to warn motorists of
pedestrian movement along the frontage street.
Car Parking
42. Car parking must be provided in accordance with the approved plans and as amended
by the conditions of this approval. The works must be undertaken in accordance with
an Operational Works approval.
43. The parking layout is to be in accordance with the requirements of AS/NZS 2890.1-
2004
44. Provision of vandal resistant public lighting with intensities to satisfy the requirements
of Australian Standard AS1158: Public Lighting Code.
45. All car parking areas and access driveways must be maintained exclusively for vehicle
parking and manoeuvring and kept in a tidy and safe condition at all times.
46. Directional signage must be provided to direct visitors and customers to the car parking
spaces provided on site.
Security Access to Carpark
47. Where access to the carpark is proposed to be restricted by a security gate, provision
must be made for queuing of vehicles clear of the roadway while waiting for the security
gate to open.
48. Where a secure carpark services a commercial use on the site, the security gate must
remain open at all times while commercial uses on the site are open for business. The
requirements of this condition must be included in the Community Management
Statement for anybody corporate for the subject site.
Service Vehicles
49. Service vehicle parking, manoeuvring and standing spaces must be provided on the
site. The works must be undertaken in accordance with an Operational Works
approval.
Pedestrian and Bicycle Facilities
50. Pedestrian and bicycle facilities must be provided for the development. The works must
include in particular:
a. signage and lighting at strategic locations to direct people to building entries and
public toilet facilities;
b. a total of 53 bicycle parking spaces; and
c. end of trip facilities involving 27 lockers, 6 showers and change rooms within the
development.
Water quality and quantity
51. The site must be provided with a stormwater drainage system connecting to a lawful
point of discharge. The works must be undertaken in accordance with an Operational
Works approval and the Queensland Urban Drainage Manual.
52. A stormwater quality treatment system must be provided for the development. The
works must be undertaken in accordance with an Operational Works approval and the
Bioretention Technical Design Guidelines (Water by Design, 2012), and must include
in particular:
Page 6 of 12
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewSearchable page text hides email addresses. Original files are unchanged and may show email addresses.