Original source · versioned page text
24191 S3100646 RevB
Lot 362
Lot 361
C
·
·
·
·
·
·
203 AS/NZS 3000:2018
3.11.5 Spacing from other underground services
All underground wiring systems shall be spacing not less than 100 mm from
other underground services.
Wiring systems shall be suitably marked with warning tape in accordance
WHILE IT IS STRIVED TO ENSURE ACCURACY OF with Clause 3.11.4.5 and maintain a separation from telecommunications,
INFORMATION LISTED, ANY SITE SURVEY FIELD WORK IS gas and water services in accordance with Table 3.7.
SOLELY BASED OFF ACCURACY OF ANY INFORMATION
PROVIDED AT THE TIME, IT IS A VISUAL INSPECTION & Further requirements for the separation of telecommunications, gas and
ASSESSMENT OF ABOVE GROUND NETWORK ASSETS water systems from low voltage wiring systems are provided in
ONLY WHICH EXCLUDES ANY ELECTRICAL TESTING, Clause 3.9.8.4.
EXCAVATION FOR THE VALIDATION OF NETWORK TABLE 3.7
INTEGRITY.
MINIMUM SEPARATION OF UNDERGROUND SERVICES
Minimum separation to low Minimum separation
voltage electrical service of conductive
identified in accordance with enclosures to low
Type of service Clause 3.11.4.5 and mechanically voltage electrical
protected (1) earthing electrode (1)
mm mm
Water service not
greater than DN65 (2) 100 500
Water service greater
than DN65 (2) 300 500
Sanitary drainage 100 500
Stormwater drainage 100 600
Gas 100 500
Telecommunications 100
NOTES:
1 Authorities, such as water and as suppliers and electricity distributors, may
require their services to be spaced at a greater distance from underground wiring
systems. Also see Figure 3.10.
2 DN = internal diameter of pipe.
24191
Parth Patel
RPEQ 21483
2025.02.05 15:08:07
+10'00'
ABN 12 115 160 748
Phone (07) 5479 1368
E-mail: [email protected] PO Box 807
Website: www.millwell.com.au Maroochydore QLD 4558 © This design and drawing is copyright and is not to be used or reproduced
wholly or in part without written permission of Millwell Services Pty Ltd
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 1 page
Page 2
PROPOSED COMMISSIONING PLAN
Proposed only and subjected to change by Energex.
LV SWITCHING SHEET:
1. INSTALL LV UG NETWORK AS PROPOSED, DO NOT
CONNECT NEW 16 LV UG TO 120 LV UG AT U5804 (STN 1)
2. OPEN SC21301-A/FS1 FUSE SWITCH AT SC21301
3. CONNECT NEW 16 LV UG TO 120 LV UG AT U5804 (STN 1)
4. CLOSE SC21301-A/FS1 FUSE SWITCH AT SC21301
5. TEST AND COMMISSION
6. CONDUCT POST COMMISSIONING CHECKS
Where interruptions are proposed, customers
shall be notified as per Energex requirements.
24191
Parth Patel
RPEQ 21483
2025.02.05 15:08:07
+10'00'
ABN 12 115 160 748
Phone (07) 5479 1368
E-mail: [email protected] PO Box 807
Website: www.millwell.com.au Maroochydore QLD 4558 © This design and drawing is copyright and is not to be used or reproduced
wholly or in part without written permission of Millwell Services Pty Ltd