In this regard, plans shall be prepared by a Registered Professional Civil Engineer and
submitted to Council prior to obtaining a Development Permit for Operational Works.
29. A Development Permit for Building Works shall not be granted until a Development Permit
for Operational Works has been issued in regard to the drainage scheme.
30. The maximum discharge of stormwater drainage allowable to Council's street gutter at any
one location is 25 litres/second.
31. All site drainage shall be by means of gravity systems.
Headworks
32. Contributions shall be paid to Council in accordance with Planning Scheme Policies PSP28
and PSP30 on Water Supply Headworks Contributions and Sewerage Headworks
Contributions respectively and at the rates applicable at the time of payment. An estimate
only of the contribution rates as of December 2001 under the current policies is as follows:
Water Supply $ 5,552
Sewerage $ 7,904
TOTAL $13,456
All headworks contributions must be paid prior to the issue of a Development Permit for
Operational Works.
Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the
headworks contributions not be paid at the due time, Council shall call upon the trading bank
guarantee in full.
In the event that the Development Permit for Material Change of Use of Premises lapses or
is cancelled, the contribution or trading bank guarantee will be returned.
Sewer Mains
33. The site shall be connected to Council’s existing sewerage reticulation systems and be
constructed in accordance with Council’s standards and requirements at no cost to Council.
Town Water Supply
34. The site shall be connected to Council’s existing town water supply and be constructed in
accordance with Council’s standards and requirements at no cost to Council.
35. Each water connection to the water reticulation system shall extend to the property boundary
and be metered. Where leased buildings are served by a single service, multiple water
meters to each leased building shall be installed. All fees for the supply of water meters shall
be paid to the Council.
Sewer Easement
36. If not already created, a registered easement shall be created over the existing sewer main
that crosses the eastern side of the site. The easement shall be provided parallel to and
centred over the sewer main and be equivalent in width to twice the depth to invert level of
the sewer at the deepest point within the allotment and be no less than 3.0 metres wide.
Easements - General
37. Prior to the issue of a Development Permit for Operational Works, a duly executed copy of
the easements shall be submitted to Council for perusal.
Any changes required by Council’s Solicitor shall be attended to prior to any Operational
Works being carried out on site.
Any necessary Titles Office forms requiring the consent of Council must be submitted prior
to the use permitted by this permit commencing.
Page 4 of 9
Document Set ID: 23994688
Version: 5, Version Date: 06/08/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval - 132001 210307 1 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 165 KB (small file)
- File type
No other editions are linked here.