Skip to the record
Beware of cheap imitations.

Council archive · source document

Minor Change Existing Approval - 132001 210307 1 (As Published) · 132001.210307.1

of 9

Text shows just the words. Original shows the document exactly as it was published.

                      In this regard, plans shall be prepared by a Registered Professional Civil Engineer and
                      submitted to Council prior to obtaining a Development Permit for Operational Works.
               29.    A Development Permit for Building Works shall not be granted until a Development Permit
                      for Operational Works has been issued in regard to the drainage scheme.
               30.    The maximum discharge of stormwater drainage allowable to Council's street gutter at any
                      one location is 25 litres/second.
               31.    All site drainage shall be by means of gravity systems.
                      Headworks
               32.    Contributions shall be paid to Council in accordance with Planning Scheme Policies PSP28
                      and PSP30 on Water Supply Headworks Contributions and Sewerage Headworks
                      Contributions respectively and at the rates applicable at the time of payment. An estimate
                      only of the contribution rates as of December 2001 under the current policies is as follows:

                        Water Supply     $ 5,552

                        Sewerage         $ 7,904

                        TOTAL            $13,456

                      All headworks contributions must be paid prior to the issue of a Development Permit for
                      Operational Works.
                      Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the
                      headworks contributions not be paid at the due time, Council shall call upon the trading bank
                      guarantee in full.
                      In the event that the Development Permit for Material Change of Use of Premises lapses or
                      is cancelled, the contribution or trading bank guarantee will be returned.
                      Sewer Mains
               33.    The site shall be connected to Council’s existing sewerage reticulation systems and be
                      constructed in accordance with Council’s standards and requirements at no cost to Council.
                      Town Water Supply
               34.    The site shall be connected to Council’s existing town water supply and be constructed in
                      accordance with Council’s standards and requirements at no cost to Council.
               35.    Each water connection to the water reticulation system shall extend to the property boundary
                      and be metered. Where leased buildings are served by a single service, multiple water
                      meters to each leased building shall be installed. All fees for the supply of water meters shall
                      be paid to the Council.
                      Sewer Easement
               36.    If not already created, a registered easement shall be created over the existing sewer main
                      that crosses the eastern side of the site. The easement shall be provided parallel to and
                      centred over the sewer main and be equivalent in width to twice the depth to invert level of
                      the sewer at the deepest point within the allotment and be no less than 3.0 metres wide.
                      Easements - General
               37.    Prior to the issue of a Development Permit for Operational Works, a duly executed copy of
                      the easements shall be submitted to Council for perusal.
                      Any changes required by Council’s Solicitor shall be attended to prior to any Operational
                      Works being carried out on site.
                      Any necessary Titles Office forms requiring the consent of Council must be submitted prior
                      to the use permitted by this permit commencing.



                                                                                                        Page 4 of 9
Document Set ID: 23994688
Version: 5, Version Date: 06/08/2025

Used in these records

About this file

File size
165 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Minor Change Existing Approval - 132001 210307 1 (As Published).pdf · 165 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.