Minor Change Existing Approval - 132001 210307 1 (As Published) · 132001.210307.1

of 9

Text shows just the words. Original shows the document exactly as it was published.

               38.    Prior to the issue of a Development Permit for Operational Works, the Applicant’s Solicitor
                      must give Council’s Solicitor an appropriate undertaking in writing that the Title Deed and the
                      easement documents will be lodged at the Land Titles Office and any additional Titles Office
                      forms or requisitions requiring the consent of Council will be attended to immediately.
                      Erosion and Sediment Control
               39.    To protect the environment against siltation/sediment export or soil erosion as a result of this
                      development, an erosion and sediment control plan shall be submitted in conjunction with
                      any Development Permit for Operational Works. Site control measures such as silt fencing,
                      controlled gravel access to the site and controlled disposal of waste, may be necessary. Prior
                      to commencement of Operational Works, all physical site control measures shall be installed,
                      and the plan adhered to.
                      Prior to commencement of Operational Works a $2,000 site control bond shall be lodged with
                      Council to ensure compliance with this condition.
                      The bond will be refunded less any costs incurred by Council in ensuring compliance with
                      this condition or any additional inspections incurred for substandard work or work undertaken
                      not in accordance with this permit.
                      General
               40.    All designs for engineering works involving the construction of pavements, kerb and channel,
                      vehicular access, footpaths, turnouts, stormwater drainage, water supply or sewerage
                      reticulation shall be prepared in accordance with the requirements of Council's Engineering
                      Design Standards, shall reference where applicable to Council’s Standard Drawings and
                      shall incorporate best engineering practice.
               41.    A suitably qualified Registered Professional Engineer shall prepare engineering drawings
                      and specifications for all engineering works, which shall be submitted in conjunction with an
                      application for a Development Permit for Operational Works.
               42.    Any alteration of a public utility or other facility necessitated by the development of the land
                      or associated construction works either internal or external to the site shall be at no cost to
                      Council.
               Land Use
                      Approved Plans
               43.    Development authorised by this approval must be undertaken generally in accordance with
                      the Approved Plans listed in the table below.

                         Plan No.            Rev.    Plan/Document Name                             Date

                         3001aa Sheet 1 -            Site Plan, prepared by Graham Matheson 12/12/01
                         of 2                        Licensed Building Designer

                         3001aa Sheet 2 -            Elevations, prepared by Graham Matheson 12/12/01
                         of 2                        Licensed Building Designer

                         1                   -       Site Plan, prepared by E.Designers             02.06.25

                         4                   -       Proposed Floor       Plan,    prepared     by 02.06.25
                                                     E.Designers

                         5                   -       Proposed    Elevations,      prepared      by 02.06.25
                                                     E.Designers

               44.    The development must be undertaken and operated in a manner that causes no detrimental
                      effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
                      lighting nuisance or other emissions.


                                                                                                        Page 5 of 9
Document Set ID: 23994688
Version: 5, Version Date: 06/08/2025

Used in these records

About this file

File size
165 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Minor Change Existing Approval - 132001 210307 1 (As Published).pdf · 165 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.