Original source · versioned page text
Appendix D - Engineering Report
Table 5: Water Quality and Drainage Code – Criteria Assessment - Continued
Performance Outcome Project Outcome
Hydrology and waterway stability
Stormwater runoff from the development site will be conveyed
PO11 to existing stormwater management areas. These areas
discharge to the existing downstream waterway via established
drainage lines.
Stormwater ruff from the development site will be conveyed to
PO12 existing stormwater management areas. These areas provide
frequent flow management and reductions to total volume of
runoff from the developed site.
PO13 The existing drainage regime will be maintained. No new
stormwater discharge points are proposed.
Construction and establishment of stormwater management systems
Proposed development works will include suitable sediment
and erosion control measures. Detailed erosion and sediment
control plans will be prepared in conjunction with future
PO14 development applications.
All sediment and erosion controls shall be designed in
accordance with the IECA manual.
Wastewater management and effluent disposal
Wastewater generated from the development will be lawfully
PO15 discharged to an existing gravity sewer main. A trade waste
permit application will be lodged with UnityWater as part of
future development applications.
PO16 Not Applicable.
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Appendix D - Engineering Report.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.