Appendix D - Engineering Report.pdf
5.0 STORMWATER MANAGEMENT 5.1 Legal Point of Discharge Approved development works for the Golf Resort and Spa included an internal drainage network designed and constructed to convey stormwater runoff from the site to a tributary of Lake Weyba (legal point of discharge) via a series of constructed waterbodies. It is proposed to utilise the existing internal drainage network where possible. Upgrades to this network will be undertaken as required. It is also proposed to direct development site stormwater to the existing constructed waterbodies and proposed rainwater tanks, which provide a source of harvested stormwater for irrigation of the Noosa Springs Golf Course and topping up of new pools. 5.2 Flooding A copy of the Flood Map for the site, produced using Noosa Council’s Online Mapping Portal, is included as Appendix C. The attached flood map indicates that the site is free from inundation by the extreme (500 year) and major (100 year) flood events and the highest astronomical tide. A flood immune fill platform has been provided for the total development site. Additional flood immunity will be provided by proposed building pads and concrete slabs.
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Appendix D - Engineering Report.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.