Original source · versioned page text
Appendix D - Engineering Report.pdf
3.2 Erosion & Sediment Control The proposed works will result in an increased risk of sediment release to the adjacent waterways. To mitigate this risk, erosion and sediment control measures will be included as part of development works. Refer to the attached preliminary engineering drawings which show the extent of disturbed areas. Detailed erosion and sediment control drawings will be prepared in conjunction with future development applications. 4.0 ACCESS & INTERNAL ROADWORKS Refer to the attached Engineering Drawings for details of the proposed site access and internal roadworks. Operational works design and construction for the internal and external roads have been completed in accordance with previous development approvals for the site. The existing external access infrastructure is generally adequate to service the site. An existing internal service road will require minor upgrading in order to support the proposed service vehicles (MRV/WCV). Adequate car parking will be provided onsite. New access driveways will be provided with connections to Resort Drive to the east of the site. The existing service road will maintain an access point from the south-east. Suitable turn-arounds will be provided in order to allow larger service vehicles, including Council’s Waste Collection Vehicle, to enter and exit the site in a forward gear. Car parking facilities, access driveways and vehicle cross-overs will be in accordance with relevant sections of the Australian Standards AS2890 for Off-Street car parking, IPWEA standard drawings and Queensland Streets.
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Appendix D - Engineering Report.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.