From:
Sent:
To: .
Subject:

Trish Sweeney

Trish Sweeney
Monday, 22 October 2007 10:28 AM
Scienta Hesse
07/2104 is now properly made today

Administration Officer - Land Use

[email protected]

5449 5293
Full text of the other 38 pages

Page 2

 

 

Development & Land Use Sections

IDAS APPLICATION

This checklist should be used for any IDAS application. Please check each of the following items before accepting an
application at the counter.

 

 

1.1.1 Ensure that the form is fully completed.

 

 

 

1.1.2 Inthe case of an MCU or Op Works betow the high-water mark, owners consent is required.
4.1.2.1 If there are multiple owners, the consent of each owner is required.
1.1.2.2 If the owner of the land is a company, either ACN No. or Company Seal required.
1.2. Form1 Part B-O Supporting Information
1.1.2. Ensure that for each box checked on Form A, the retevant additional Forms 8-O are attached. L/]
4.1.2.1. Ensure that each of Forms B-O which are attached are fully completed. [J

 
 

en a [email protected] Ensure that items 1-23 have been checked and/or completed with regard to referrals.
SEENVIRONMENTALEY: ANTA

i ini ely ee

3.1 Ensure that Part G is completed if EPA referral is required.

Ise

Sanco

      
  

 

     

 

 

 

3.2 Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
fee is paid and recorded on the application.

452 FORNEZES REQUEST: 1 OICHANGE APRROVALINS a Wiener men nn PRaeE

4.1 Ensure that items 1-28 have been checked and/or completed including information regarding
applicant details and owners consent.
SAUNPEANS Nae SSE SENT aE oc ove e
5.14 Ensure that at least 6 sets of the Plan of Development (5 for Reconfiguration and Operational
Works) accompanies the application. In addition ensure that each set is complete.

5.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and.is
unbound, .

 

   
 
 
 

 

 

 

     

 

 

 

 

    

 

 

‘SEE SUPRORTINGINEORMAT. SRY
6.1 ‘Ensure that at least 6 copies of any report accompanies the application (5 for Reconfiguration -
and Operational Works). If the application is accompanied by a covering letter, ensure that it is ~
e@ capable of reproduction. [A]
6.2 In the case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound. =

 

SRE ee nee

7.1 Ensure that the application fee, as determined from the Council's adopted scale of fees,
accompanies the application or has been paid.

7.2. Ensure that the fee which has been paid is recorded on the application form.

Receiving Officer LS beens SQ osetemer- De eeeceeceeenneneee Date ..... ie(ie(e} heveerseenee

Having completed this form and accepted the Bbicaton please deliver both to the following IDAS Application Receiving

trays:- . .

«Ifthe application is for a Material Change of Use exclusively -AOP1’s desk in the Land Use Section.

«Ifthe application is for an Material Change of Use & Reconfiguration - AOP1's desk in the Land Use Section.

«Ifthe application is for Operational Works (for parking, access, sewerage or drainage) exclusively - AOD2 in the
Land Development Section.

« = Inall other circumstances - AOP1’s desk in the Land Use Section.

Please DO NOT leave the application at the counter and DO NOT deliver the application to Records.

   

 

 

 

 

 

 

 

 

SEP] g:\ant\forms\application checklist.doc

NOOSA Checklist - Applications Involving Land —— Fe ere

 

Page 3

INTEGRATED PLANNING ACT 1997 , . Part A, Version 2.4, 29 May 2006

   

 

& Form 1 Development Application

 
    
  
   

ne
yOOshSNDU

or
{ The completion of all applicable questions on Part A is mandatory for all applicatons: Part, mi tie accompanied by
k required, and by one (1) or more other completed parts of the Form as required. For mor on rt
i, Any information requested in the form may be provided in an attachment to the application. For furthe” information aboot o

  
  
  

 

plated IDAS. Assessment Checklist if

Form refer'to www.ipa.qd.gov.au, |
fing the foflowing details, refer to Gulde 4.

 

 

 

 

 

 

 

 

 

 

 

{Description of land 1. ” Street address: fnetudinghouse number, sfréet ame, suburtviocality namé & postcode} (if appficable) °.
Mee! tore, ceecpinabonstmt | [29 VentGra St Sonnse Road Noa 4567 |
akakindbbe-eraedy ae a eR * 12. Name of water body or watercourse, within which the development is proposed: (if applicable) -_-
| fidvice for completing Q2 - 02 apps it | |.
1. development is proposed within a water body or i - - - -
j Watecourse. 3. Loton plan description (eg. Lot 123 on RP 4567)/:GPS coordinates: o

@ itty sttrcmsecisen Newanes | [Lol 124 RZ 132 184 7
er gemaned rom de documents orthowah Re | 4 The-above desoription is for: (ick applicable box} ,
|. However, ifthe land on which the development s (i) the land on which the development is proposed; or °
jprooced does got have abt ean ee C1 (ii) the tand adjoining the water body or watercourse, within which the development is
| Wateroourso) provide ~ proposed; or. " .
9 eee ‘C (ili) the water body or watercourse.
1@ Sioichaaent tea ee ton Bay). 5. Shop / tenancy number: 6. Storey/level: 7. Total area of land: (m? or ha):
| Qatvice for completing Q7 - Q7 does not apply ifthe | | | | [ @2em*

| development is within a water body or watercourse, _ : - - . 7
} Ati for commiting G8 es ea 8. Local government area in ‘which the land is situated: (eg. Esk, Hervay Bay, Woocoe etc.) (if applicable)

 

 

 

 

 

 

 

 

| Mote: Areas below high water mark are not within a .
‘lpcal governments area inlets provided under the L_Aleoso. - - - |
{ Local Government Act 1993, 9. Port authority for the strategic port land or strategic port land tidal area on which the
Advice for completing G9 « C9 spplies if a i y i j
| Sov ais on strategic pottdora strategic development is proposed: (eg. Port of Brisbane, Port of Téwnsville) (# applicable)
; Portland fidal area, For more detais refer to Guide 14 [ : |
i Proposal details . 10. Existing use of the land: (eg; vacant, single house, shop etc.)
i i Se lable, details‘ ot . = ws 7 = Tt
\ ped Wren eiahment ioe the a | S Ler fic Hoeuge. - Qos duel ~Wwietmno, |

11. Proposed use-6f thie land: (eg. 6 unit apartment building, 30 fot residential subdivision, EBA for aquacutire in
: ponds with a tote! area of 7 ha for which wastes are released into waters etc). oO .

| “Leolax walle, |

 

 

 

 

 

 

 

 

 

  

 

{ Other appiicable parts of Form 1 12. Other parts offForm 1 conipieted as part of this application: (eg. Part D, Pat I, etc)

{Part A must always be accompanied by other. | G ‘d EG °

i. completed parts of Form 4. For information about as

{when a part of Form 1 may apply refer to Guide 4 ° " ° , : :

[Applicant details 13. Applicant's name,” “16. Contact person:

: ify who is making the application. The - ; ‘aad ; 7

[cto it bone did / : Le Some Deven | Li Senn Tea J

# When signing and lodging this appiication 14." Contact number: . 16. Facsimile number/e-mail address:
en Geared Tho msn . (O&- G2H#eo | Voinde vette SSaVUS. Cow)

‘ifianager, any referral agency Executive 5 > :

+ whore opp) will rely on this information when - | 17. Postal address: . Co,

assessing and deciding the application. =? — :

ihe pcan company cot pocon LACA AevsccVt-St Fae. a 2

jemust bo shown. 18. Signature: - 19. ‘Date:

 

 

sees eye

 

 

 

 

eae [eiereg
yy

Page 4

INTEGRATED PLANNING ACT 4997

Part A, Version 2.4, 29 May 2006

 

Land owner's consent {if.appiicable) -
Section 3.2.1(3) of the IPA prescribes that an.

- lawritfen consent of the land owners, Hie gpptcaton =
involves:

fi) ‘a mater change of use;

(®)- réconfiguration of a lot;

@ work on land below high-water mark & not within a

Management Act 1995;0r
(iv) work on tall corridor land dafined under the
Transport Infrastructure Act 1994.
"Section 3.8.1(2}(a} of the PA provides that
landowner's consent is pot required for a mobile or
| Semporary ERA .

[For more information refer to Guide 1,

canal as defined under the Coastal Protection and

application must contain, or be supported by, the oc]

 

Name .

“1/20. ‘Land owner's consent to the making-of this application:

. Signature

 

 

 

 

 

we

 

 

 

 

Resource entitlement (if applicable)
Section 3.2.1(5) of the IPA requires evidence of
‘resourre entitement be given for applications that
involve a prescribed State resource.

Section 3.2.1(10)(a)(il) of the IPA prescribes that an

‘application cannot be taken to be properly made
without evidence of the resource entitlement.

Advice for completing 021 & 22
Refer to schedule 10 of the integrated Planning

‘required by the State in support of the lodging of bis
development application. .

}
| Advice for completing Q23

' The information in (i) - (v} is mandatory if evidence is
required under Q22 (ii) or (ii) above.

(The officlal stamp of the Department of Natural

+ Resources, Mines and Water is mandatory where the
application involves any water or riverine quarry
"material under the Water Act 2000.

Section 3.2.1(5A) allows the resource manager to limit
tthe time the evidence may be used. 023 (vi) must be
{completed if the evidence is time limited.

t .

t

 

weyers

21,

t Regulation 1998 that prescribes the nature of evidence| _

23.

 

uiamy material on State coastal land under the Coastal Protection and Management Act ‘9?

FEILNO - goto. 024

>to Q23

LC (ili) the chief.executive of the department administering the resource is satisfied. the
roceed in the absence of an allocation of,or ..

development application mai

This ‘application i is accompanied by evidence: (ick applicable box)

Oi) the chief executive of the departmenit administering | the. recaicéis
development is consistent with.an allocation of, or entittement

 

entitlement to, the resource — go to 023

Evidence of the resource entitlement:

(i) Resource entitlement / spat details

(ii) Name of delegated officer’. -_

(ii) Position of delegated officer

" (iv) Signature of delegated officer

 

 

 

 

(v) . Date

[1 Yes: “goto 022 CO,

   

t

   
     

 

(vii) Officia tamp of. the: department

  

applicable) .

 

 

 

 

 

| Assessment triggers

 

24. Is

   

 

This checklist does not apply the application requies} AZ] VEG”
the completion of Parts A and 8 of the Form only. It .

must be completed for all other applications. .

Plans | drawings / reports 25. ‘Plans/drawings/reports Rampant this aophcatan

‘An application should be accompanied by details to
support the proposal & enable the assessment
manager, referral agencies and any person viewing”
the application during public scrutiny or public
"notification to understand the Scope of the proposal
i end any Potential impact +

 

 

 

 

 

 

 

 

 

 

Plan / Drawing / Report Number Title Date
 Lastoseahe od Lavoscale Mls
W) Becass a laeviac BasesavC Cau.
Li Seu ware Phaswage | Heretic Seovices rata
LW hontace/enosintt Semen St Lass

 

PLEASE NOTE: The assessment manager may refuse to accept an application that;at the time of lodgement, fails to provide all applicable information required by Part A
and any other relevant part of Form 1.

 

OFFICE USE ONLY (applicable to assessment manager's)

 

 

 

 

 

 

* 3. DATE
[Fee ) 269 2 RECEIVED, © | Sheofo? [
Notification of. Engagement of Private Certifi ier (Optional toma” .
To, Council. | have been engaged as the private certifier for the building work referred to in this application.

Date ofengagement / /

Accreditation Number.

Name:

Signature:

 

 

 

Page 5

INTEGRATED PLANNING ACT 1997 . ~ Part E, Version 2.1, 18 June 2007

~~ Form 1 eee aaa

 

Operational &/or building work ts|

assessable against a local government’s planning scheme

 

 

” Completion of all question on Part E is mandatory for all applications involving the assessment of operational work and/or building work assessable
- against a focal govemmment's planning scheme (including detailed engineering plans and other plans, detailed engineering plans for subdivisional works and conceptual
design plans for engineering & buking work when the application does nel involve assessment of e materiel change of use of premises atthe same tine).

 

 

 

 

Nature of the works 1. The application is seeking approval of (tick one (1) or both if applicable):
The types of work that are assessable against LO Building work assessable against a planning scheme - - provide detads ofthe aspects ofbuliding
a planning scheme are determined by the.

for a particular local ment and | work (6.9. busing height greter then 8.5m buiing work on high ands sk ered)
will vary across the State. . _ | .
To determine the types of work that are [Operational work.assessable against a planning scheme = provide details of the nature of the
assessable under a particular planning - Operational work (a9. rosdworks; landscaping: drainage works; stomnwater, water infrastructure; sewerage
scheme, contact he relevant loca infrastructure; earthworks; clearing vegetation; signage)
The information in Q2 fs necessary for | - :
Statistical and planning purposes. 2. Is the application for operational work involving the creation of new lots?

NO  . [J YES - specity number of new lots to be created below

fo

"13, -Does the proposal involve the construction of'a canal that is associated with reconfiguring a lot?

 

 

No Lives

Nature of the application 4. This application | is for: (ik one (1) or bof eppicale)

A development permit authorises

development to occur, while a pretiinary oO Preliminary approval - provide detats oft type of work eg. roadwork, stormwater, weter end sewerage

 

- approval is a step in the approval process - -
"and does not authorise development to oocur.| | ; : }

 

O Development permit - Provide deteis ofthe type of work eg. roadwork ‘Stomnwater, water end sewerage
infrastructure, etc _-

7

5. -Are the works subsequent toa previous development permit or preliminary approval?

 

 

     

 

 

 

 

 

 

 

@ . oO NO YES - = provide details of al pravious approvals

: : . =alList of approval referencals.. 2 = Date approved <. (Date approval pses 7
2005/2302 3B} 1S 12007 By 1S 120ft
-: Portable Long Service Leave levy (it. |6. Is paymentofa Portable Long Service Leave (PLS) levy applicable to the proposal?

~ spplicable) BRL YES - complete a7
"Prior to issuing a development pert for the
; worl, the pacedoment manager equi [LINO -07,8&9¢0not apply .

* “by Jaw to “sight” an approved form, issued by -
“.Qheave, which signifies that the PLSL levy |7. Has the PLSL levy been paid?
“has been paid. . .

For reterto LL YES ~ complete a8
| hitpviwww oleave ald.gov.au A NO- ihe eppfcable ey must be pai before a core permit can be given for the works

8. How much was paid? - . oe
9. Whatis the receipt number of the payment? ,

 

 

 

 

Page 6

INTEGRATED PLANNING ACT 1997 - Part E, Version 2.1, 18 June 2007

PLEASE NOTE ,

This application cannot be accepted unless accompanied by Part A. of Form 1.
The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide-all applicable information
: requested by Part A and any other relevant Wart of Form 1.

OFFICE USE ONLY (applicable to assessment manager} °

 

 

 

 

 

 

 

 

[io tsa PLSLtow applicable in tisinstance? + > No TI YES -compi

(li) Has the approved form (issued by QLeave and which signifies that the PLSL levy has been pai) been n sighted by the assessment,
manager / private « certifies at the time of lodgement of this application?

E1No : Cves- ~ provide receipt deta

 

 

 

Page 7

   

INTEGRATED PLANNING ACT-1997 —————=- —~ ~

   

IDAS Assessment Checklist, Version 20, 2 Aprit 2007

    

_IDAS Assessment
Checklist

(Formerly the “Referrals Checklist’)

 
 

 

IMPORTANT NOTE FOR ALL APPLICANTS:
1. This checklist was formerly referred to as the “Referrals Checklist’. Some of the ‘Guides’ to using the IDAS Application Forms ‘continue to refer to this document as the
“Referrals Checklist’. The name of this checklist was changed from 25 July 2005 to more accurately describe its function.

2. Under the IPA and IDAS framework, an application may require assessment by the local Council and/or certain Queensland State entities {e.g. Environmental Protection
Agency, Dept. of Natural Resources and Water, Queensiand Heritage Council etc.).

3. This checklist is provided to assist applicants to determine when an application requires assessment by a Queensland State entity and may also assist the applicant to
determine the assessment manager" for the application.
4. — Therefore, the completion of all questions in section 1 of this checklist is ‘mandatory for all applicatlons (other than those requiring ‘ihe completion of Parts A & B only).

- 5. Iti the responsibility of the applicant to accurately complete this checklist.

6. Section 2 is mandatory only if the proposed development is located in any part of a wild river area declared under the wits Rwers Act 2005.

eo. Depending on the nature of the application, an applicable State entity may be either the assessment manager or an IDAS referral agency for the application.

8. The assessment manager for the application will rely on the information provided in this checklist (as well as any material fodged in support of the application) to identity
any applicable referral agencies for the application in the Acknowledgement Notice. The assessment manager will also rely on this information when identifying if the
application triggers referral coordination?

9. To assist you in answering the following questions a series of guides are available free from the IPA website www.ipa.ald.qov.au. Guide 25 explains the role of the DAS

: Assessment Checklist in the IDAS application process, and its relationship to the Form 1 development application.

10. Any other parts of Form 1 that this checklist requires to be completed are available from the Council or the applicable State entity, or can be downtoaded free from
www. ipa.aid.gov.au.

11, Section 3 provides advice about the referrals that can be required for applications for building work assessable against the Building Regulation 2006.

 

 

 

 

 

 

Environmentally relevant activity 1, The application i involves: {tick applicable box/es)

* For more information refer to Guide 4,

Unless you answered “none of the above" to Qt;

"6 {i) an environmentally relevant activity (ERA) for which a code for environmental Compliance
the application requires assessment by the

has not been made - complete Part G of Form 1

administering authority? (CO Gi) a mobile or temporary ERA for which a code of environmental compliance has not been
If an-entity, other than the administering Made - complete Part G of Form 1

authority, is thé assessment manager forthe i (iii) none of the above

application, the administering authority is a

‘concurrence agency for the application in elation
to-this matter.”

Note: An application involving ERA 19 and/or 20
will also: require Completion of Part-K; of Form:1 +
for apptoval where an allocation under the Water
Act 2000 is required.

 

 

Continued overleaf .

 

PLEASE NOTE: The assessment manager may refuse to accept an application, which, at the time of lodgement, ‘rails to provide the
completed IDAS Assessment Checklist (if applicable).

 

OFFICE USE ONLY (applicable to assessment manager}

 

 

 

 

 

 

 

1 The assessment manager is responsible for assessing and deciding an IDAS application. The assessment manager for an application is prescribed in schedule 8A of the IPA.

2 For additional information refer to Guide 6 ‘Does my application trigger the referral coordination process?’,

3 The ‘administering authority’ may be either the Environmental Protection Agency, the relevant locat government (for a devolved ERA) or the Queensland Department of Primary Industries and
Fisheries (for adelegated ERA). .

Page 1

Page 8

INTEGRATED PLANNING ACT 1997

State-controlled road matters

For-more information refer to Guide 3.
Unlessyou:answered none ofthe ‘above’ to 02,
“the application triggers referral to the Department
of Main Roads (DMR) as a referral agency.

In certain circumstances DMRwill
agency, while in- other “circumstan
be a concurrence‘agency.
‘Schedule 2 of the IP. Regulation will assist you 0
‘determine where OMRi is an advice or”
concurrence: agency ‘for-the application.

 

 

  

 

  

. : . IDAS Assessment Checklist, Version 20, 2 April 2007
2: The application involves: (tick applicable box/es) :
(11 ())_ development on land contiguous‘ to a State controlled road and for -
fl (a) material change of use assessable against the planning scheme,

J (b) reconfiguring a fot unless -
*- @ the total number of lots is not increased; and

« the total number of fots abutting the State-controlled road is not increased;

C1 (©) operational work (not associated with a material change of use assessable against the

planning scheme or reconfiguring a lot mentioned in (b) above)-
« associated with access to a State-controlled road; or
for filling or excavation; or
+ involving the redirection or intensification of site stormwater from the land, through a
pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
State-controlied road.
C (ii) development on land-not contiguous to a State-controlled road and -

C1 (a) material change of use -
* assessable against the local government's planning scheme; and
+ mentioned in schedule 5 of the IP Regulation and exceeding the thresholds. set by

that schedule;
(2 (b) reconfiguring a lot for a purpose mentioned in schedule 5 of the IP regulation
= and exceeding the thresholds set by that schedule; .
(O(c) operational work (not associated with a material change of use assessable agains aD
planning scheme or reconfiguring a lot mentioned in (b) above}-
* assessable against the local government's planning scheme; and
* mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
“that schedule.

C (ili) none of the above

 

: Clearing vegetation ar
For more informationfefer to.Guide’ 12.

Unless you answered “none of the above” to Q3,
the application requires assessment by the.
‘Department of. Natural Resources and Wale "
(NRW). ;

If an agenicy other than NRW is the agsessment,
manager for the application, NRW isa .
.concurrence agency for the application in relation
to this matter.

Mf you ticked-Q3(i) or (ii), your application requires
referral to. NRW for assessment regardless of © |
whether vegetation clearing is proposed or not. .

 

The application-involves: (tick applicable box/es)
(i) . material change of use -
(a) assessable against the planning scheme;
(b) on alot containing -
* acategory 1, 2 or 3 area shown on-a property map of assessable vegetation; or
+ ifthere is no property map of assessable vegetation for the lot - remnant vegetation;
(c) where the existing use of the land is a rural or environmental use; and
(d) where the size of the land is 2 hectares or larger - + complete Part J of Form 4

DI (ii) reconfiguring a lot -
(a) on alot containing a category 1, 2 or 3 area shown on a property map of
“assessable vegetation or, if there is no property map of assessable vegetation for,
the lot, remnant vegetation; @
(b) -where the size of the lot before the reconfiguration is 2 hectares or larger;
(c) where 2 or more lots are created; and
(d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form
C1 (iii) operational work- - . :

(a) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and

(b) not associated with a material change of use assessable against the planning
scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - complete Part J of
Form

C1 (iv) none of the above.

 

 

Strategic port land

For more information refer to Guide 14.

If you ticked (i) - the relevant Port Authority is the
assessment manager for the application. .

Ifyou ticked (ii) Queensland Transpoit isa
concurrence agency for the application.

 

|4. The application involves:

C1 (i) development on strategic port land as defined in the Transport infrastructure Act 1994 (Tl
Act) - complete Part | of Form 1

CO (i) a material. change of use that is inconsistent with the land use plan approved under the
TI Act for the strategic port land - complete Part | of Form 1

& (it) none of the above

 

4 Land contiguous fo a State-controlled road is defined in schedule 14 of the IP Regulation to mean land - if pat of the fand is within 100m of the State-controlled road; 0 or that is part of a future State-

controlled road.

Page 2

|

Page 9

  
 
 
 
 
 
  
 

 

 

te

INTEGRATED PLANNING ACT 1997

 

+
~

IDAS Assessment Checklist, Version 20, 2 Aprit 2007

   

 

 

 

   

 

Acid sulfate soils 5. The application involves development on land situated.in-an-identifieds local: government'areéa
For more information refer to.Guido-10;—~ - arid where the surface of the land is: (tick applicable box)
Unless you answered “none of the above" to Q5, (7) (i) below 20m AHDS and the development will involve the excavation of 1000m? or more of
the application requires assessment by diment at or below 5m AHD,
Department of Natutal Resources and Water soil or sediment at or below 5m or
(NRWR 1) (i) ator below 5m AHD and the development will involve filling the site with 1000m3 or more
tans ‘agency other than.N NRWis the assessment . of material
[Xd (iii) none of the above
16. . Does the application involve a material change of use @ for a a major hazard facility or r possible
. major hazard facility as defined under the Dangerous Goods Safety Management Act 2001?
Kno ~
oO YES - complete Part L of Form 1
17... The application involves:
(I (i) operational work, for taking or interfering with water under the Water Act 2000, that is:
._ {tick applicable box/es}
C1 (a) ina watercourse, lake or spring, (eg. a pump, gravity diversion, stream re-direction, weir or
dam) - complete Part Ko, Ks, Ks, Ke, or Ks of Form 1 whichever is applicable;
E) (b) for an artesian bore anywhere i in the State, no matter what the use - complete Part
"Ky of Form fi
/ o (c) for a subartesian bore, in declared subartesian area’, or ina certain area covered
by a water resource plan, for use for purposes other than stock and/or domestic
* midaget lor thé application, NRWisa - , Jete Part K, of Form 1:
“cncurrerice agency for the application in USE - complete Part Ki of Form
relation to this matter. (1 (d) for a subartesian bore, in certain declared: subartesian areas, for use for stock
° and/or domestic purposes - complete Part K; of Form 1;
/ (1 (e) for taking overland flow water in certain areas covered by a water resource plan
. , ~ complete Part Ka of Form 1;
(J (f) for interfering with overland flow water in a drainage and embankment area -
complete Part Kioof Form 1
(1 (g) for constructing a referable dam or works that will increase the storage capacity
of a referable dam by more than 10% - complete Part Ks of Form 1; OF
[1 (ii) none of the above.
“Removal of quarry material from a 8. Does the application involve development for the removal of quarry material from a watercourse?

watercourse
For.more information refer to. Guide 16.

Ifyou answered. “YES” to Q8, the [email protected] by the Department of
-Nalufal Resources and Water (NRW). .

‘if an-agency othér than NRW is the assessment

-manager for the application, NRW is a

“concurrence agency for the application in

relation to this matter: -

“Note: Part G-of Form.1 is.required to be
“completed as thé activity of removing quarry
material from a watercourse is also an
‘Environmentally Relevant Activity (ERA):

  

 

 

requiring an allocation notice under the Wafer Act 2000?

&X] NO

[1 YES - complete Parts Kr and G of Form 1

 

 

5 The identified local government areas are: Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Burnett, Caboolture, Caims, Calliope, Cafoundra, Cardwel, Carpentaria, Cook,
Cooloola, Dounglas, Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrooke, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryboraugh, Mirium Vale, Momington, Noosa, Pine Rivers,
Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday.

Australian Height Datum {AHD).

COW

Watercourse is defined in sch 10 of the IPA.

The declared ground water areas are listed in Guide 13 Development in a declared catchment area,
Referable dam is defined under the Water Act 2000. .

Page 3

Page 10

INTEGRATED PLANNING ACT 1997
Operational work that is tidal work or
work in coastal management district
“For-more information refer to Guide 18. For

* .more information about prescribed tidal work in
local government tidal areas refer to Guide 24.

Unless you'answefed “none of the above” to 09, |

the application requires assessment by the
Environmental Protection Agency (EPA).

Hf an agency other than EPA is the assessment
manager] for the application, EPA is a.

   

x.
he,

DAS ‘Assessment Checklist, Version 20, 2 April 2007

9. The application involves operational work that is: ( tick the applicable box/es) Os

O (i)
O (il)

‘Dii)

Biv

tidal work"® as defined under the Coastal Protection and Management ‘Act 1995 (the
Coastal Act) that is not prescribed tidal work ~ complete Part M of Form 1; of

tidal work that is prescribed tidal work" other than in a canal’? -compiete Part P of Form 1; or

carried out within a coastal management district under the Coastal Act and for - complete
Part M of Form 1 if any box/es (a) to (i) below are ticked.

(1 (a) _ constructing or installing works in a watercourse between MHWS and HAT (ie,
- other than those works in tidal water) where the development has been determined not
to be assessable against the Water Act 2000 ;

constructing a canal12 intended to be connected to tidal waters;

constructing an artificial waterway;

reclaiming land under tidal water;

disposing of dredge spoil or other solid waste material in tidal water;
interfering with quarry material on State coastal land above high-water mark;

draining or allowing drainage or flow of water or other matter across State
‘coastal land above high-water mark;

removing or interfering with coastal dunes on land, other than State coastal land,
that is in an erosion prone area and above high-water mark;

constructing a bank or bund wall to establish a ponded pasture on land, other
than State coastal land, above high-water mark; or

none of the above.

[1 (b)
Cte)
Oia)
Ce)
Oi:
Og)

 

‘Opetaionalwark below high water
mark

.For more information refer to Guide 18. For
More information about prescribed tidal work in
focal govemment tidal areas refer tj Guide 24. -
Unless you.answered “none of the above" to -
Q10,.the application triggers referral to

‘Queensland Transport (QT) (Maritime Safety

“Qid) as a concurrence agency.

Local government is the assessment manager
for all prescribed tidal work. ,

 

“140. The application involves. operational work that is: ( tick the applicable boxes)

Ov

tidal work's as defined under the Coastal Protection and Management Act 1995 (the
Coastal Act) that is not prescribed tidal work = complete Part M of Form 1; or

(1 (ii) tidat work that is prescribed tidal work" - complete Part P of Form 1; OF
(C1 (iii) carried out within a coastal management district'S under the Coastal Act and for -

Cia)

disposing of dredge spoil or other solid waste material in tidal water - complete Part
M of Form 1;

DD (b) reclaiming land under tidal water - complete Part M of Form 1; or
. (J (c) constructing a canal'2, if the canal is associated with reconfiguring a lot -
complete Part M of Form 1;
[XJ (iv) none of the above. “

 

 

Coastal management
For more information refer to Guide 18.

Unless you answered “none of the above” to
Q11, the application requires assessment by the
Eavironmental Protection Agency (EPA).

if an agency other than EPA is the assessment
manager for the application, EPA is a
concurrence agency for the application in
telation to this matter.”

 

44.

The application involves: (tick the applicable box/es)

Citi)
Oi)

iii

Ow

v)

a material change of use assessable under a planning scheme involving operational
work carried out completely or partly in a coastal management district's ,

a material change of use assessable under a planning scheme involving building e
work, carried out completely or partly in a coastal management district that is —

* the construction of a new premises with a GFA" of at least 1000m?
+ the enlargement of the GFA of existing premises by more than 1000m2

reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated
completely or partly in a coastal management district

reconfiguring a lot’ assessable under schedule 8 of the IPA and in connection with
the construction of a canal12 - complete Part M of Form 1

none of the above

 

10 Tidal work is defined in sch 10 of the IPA.

11 Prescribed tidat work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or parlly within a locat government tidal area.
12. Canal means canal as defined under the Coastal Protection and Management Act 1995

13 Tidal work is defined in sch 10 of the IPA.

14 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area.
15 Coastal management district is defined in sch 10 of the IPA and means a coastal management district under the Coastal Protection and Management Act 1996, other than an area declared as a °

coastal management district under section 47(2) of that Act.

46 GFA\is defined in sch 14 of the IPA to'mean the gross floor area-For-a definition of how to calculated GFA, got to the planning scheme againsi which the application is being assessed.

17 Under $117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration is ass6ciatéd with the construction of an-artifi cial waterway, must PE

accompanied by the application for the operational works to construct the artificial waterway.

Page 4

 

 

Page 11

 

 

INTEGRATED PLANNING ACT 1997
Devefopment within the limits of a
“port

For more information refer to Guide 18. For

information about prescribed tidal work refer to
Guide 24.

you answered "YES" to Q12, the application
triggers referrat to the Port Authigity, .

 

“e Within 1000m ofa swing ba sin, a commercial
‘shipping whart, a mooring, anchorage’ of see
ds; -

   

“identified iri'a land use plan j
the Transport Infrastructure’ Act 1994,
‘In all other situation the Port Authority is an
advice: agency.

 

IDAS Assessment Checklist, Version 20, 2 April 2007
Does the application involve development below-high-water-mark'® and within the limits of  poff ~
under the Transport Infrastructure Act 1994?
[XI No .

(YES - complete Part M of Form 1, or Part P of Form 4 if the work is prescribed tidal work

 

  

jarinas -
For-moré information refer to‘ Guide 18. For
information’ ‘about’ whether a marina is presciibed
. 4,

 

 

 

: Tidal worksiin strategie er lene ie
* areas.

   

Port ‘Authority is the assessment { manager for the

“dopication and the Environmental Protection’ -
‘Agency (EPA) and Queensland Transport (QT)

ae concurrence agenties for the application.

Heritage
For further information refer.to Guide 19.

~ Ifyou answered "YES" to Q15, the application
triggers réferral to the Queensland Heritage

Council as concurrence agency for the
application.

“Unless you answered “none of the above" to
Q15(b), the application involves feferral to the

Environmental Protection Agency as an-advice
agency for the application .

13.

15.

Does the application involve’ operational w work t that i is tidal. work fora marina with more than 6.

- vessel berths?

DANO

oO YES - complete Part M of Form 1, or Part P of Form 1 if the tidal work is prescribed tidal work

   

Does the application involve tidal works within a strategic nor iand tidal areat®?

Kno

(1 YES - complete Part M of Fonn 1°

Does the application involve development ina heritage registered place as defined under the ~ '
Queensland Heritage Act 1992?

i NO .
(YES - complete Part C of Form 1

15(b)The application involves: (tick applicable boxes)

[1 (i) amaterial change of use assessable against the planning scheme and the lot shares a
common boundary with a protected area or registered place under the Queensland
. Heritage Act 1992;
O(ii) — reconfi iguring a lot if the lot shares a common boundary with a protected area or

registered place under the Queensland Heritage Act 1992;
none of the above.

Wi)

 

Declared catchment areas

For more information, inctuding a list of the
dectared catchment areas within Queensland,
refer to Guide 13.

Unless you answered “none of the above” to
Q16, the application requires assessment by the
Department of Natural Resources and Water
(NRW).
if an.agency other than NRW is the assessment
“manager for the application, NRW is a
concurrence agency for the appkication | in
telation to this matter.

 

 

16.

The application is in an area declared to be a catchment area under the Water Act 2000 and
involves: (tick the applicable box/es)

O (i) reconfiguring a lot if any lot resulting from the reconfiguration is less than 16 hectares;
Ci(ii) development assessable against the planning scheme involving the establishment or

expansion of a waste water disposal system, other than a disposal system for carrying
out an environmentally relevant activity under the Environmental Protection Act 1994;

none of the above

& ii)

 

 

18 High water mark-is defined in the Coastal Protection and Management Act 1995 and means the ordinary high water mark at spring tide,
19 Marina is defined in the Transport Operations (Maritime Pollution} Regislation 1995.
20 Strategic port land tidal areas are the areas generally 50 metres seaward of high water mark adjacent to strategic port land.

Page 5.

Page 12

INTEGRATED PLANNING ACT 1997
Contaminated-land’ .

“Applications involving material change of use
and/ or reconfiguring.a lot may biggerthis
referral,

‘For more information refer to Guide 5.
Untess you answered “none of the above" to
~ Q17, the application requires. assessment by:

Environmental Protection Agency (EPA). Han,
-agency other than EPA
manager-fo for the ‘applica
-Concurrence agency. for.
relation to this matter.

 
 
 
    

application in:

 

 

 

ot . .
IDAS Assessment Checklist, Version 20; 2 April 2007. +

17. The application involves: (tick the applicable bowes)

CJ (i) reconfiguring a lot for which all of part of the premises are -
(a) premises mentioned in the IPA, schedule 8, part 1, table 2 - .
« item 5, including the exemption otherwise provided for by paragraph (d); *
« item 6, including the exemption otherwise provided for by paragraph (e); or.
* item 7, including the exemption otherwise provided for a mining activity or petroleum \
activity; or
{b) in an area for which an area management advice has been given for unexploded
ordnance - complete Part N of Form 1

Oiii) a material change of use ~
(a) ‘made assessable under the IPA, schedule 8, part 1, table 2, items 5 to 7; or
(b) assessable against the planning scheme and if all or part of the premises is in an area
for which an area management advice has been given for unexploded ordnance -
complete Part N of Form 1 .

pd (ii) none of the above

 

‘Remusior

 

  

 

Te The application involves: (tick the applicable owes)

C1 (i) reconfiguring a fot where any part of the lot is -

* subject to an easement in favour of a distribution entity or transmission entity under the
Electricity Act 1994 and the easement is for a transmission grid or supply network under
that Act; or

« situated within 100m of a substation site;

Ci (ii) a material change of use, assessable against a planning scheme and not associated
. with reconfiguring a lot if -
. « any part of the premises is subject to an easement in favour of a-distribution entity or
‘ ___, transmission entity under the Electricity Act 1994 and the easement is fora transmission
"grid or supply network under that Act; and
any structure or work that is thie natural and ordinary consequence of the use is, or will be,
. located wholly or partly in the easement;

C1 (ili) a material change of use, assessable against a planning scheme and not associated
with reconfi iguring a tot if any part of the premises is situated within 100m of a substation
site;

* C1 (iv) operational work that is filing or excavation assessable against the planning scheme,
not associated with reconfiguring a tot, if -

« any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the work is located wholly or partly in
the easement;

e the work is located wholly or partly within 10m of a substation site;

(XJ (v) none of the above.

 

Land designated 'for-commuinity

infrastructure .

Applications involving development on {and

designated for.community infrastructure may
+ trigger this referral, .

For more information refer to schedule 2 of the

{P Regutation,
- {fyou answered “YES" to Q19, the application

Tequires assessment by the chief executive of |.
ing

the.department administering the Act authorisi
the development for the designated purpose.

If an agency other than the designator i isthe «

assessment manager for the application, sthe ”

designating agency-will be-a concurrence |
agency for the application in-relation to this
matter.

19." Does the application involve development assessable against the planning scheme-and on ng
designated for community infrastructure?

(i) intended to be supplied by a public sector entity; and
(ii) on land not owned by or on behalf of the State; and
(iii) other than development -

(a) for the designated purpose; or

(b) carried out by, or on behalf of, the designator.
x No ,
Cyes

4

 

 

™

.

 

 

Page 13

=

 

INTEGRATED PLANNING ACT 1997

SEQ Regional Plan .

For riore information refer to schedule 2 of the
IP Regulation.

Refer to Chapter 2, part 5A and schedule 10 of -

thie thteqrated Panning Act 1997, and schedule
2 of the Regulatory Provisions for relevant
“defi finitions. , .

 

20, the spose téquires assessment! y the
‘Offi ice of Uiben Menatement (OUM).

“Fisheries matters

‘-For more inforitiation refer to schedule 2of the IP
; Reg ulation.

Unigss you answered " ‘none of the above" to
“O21; the application requites assessment by the
"Department of Primary industries and Fisheries
(DPIBF),

«lfan agency other than DPI&F is the assessment}
Tnanager for the applicatlon, DPI8F is a

P concurrence agency for the application in

relation to.items {i) — (iv) and an advice agency

“In elation to item (v).

 

21,

& (i) amaterial change of use of premises -

oe

.

_|20._ The application involves. (tick applicable box/es} =

IDAS Assessment Checklist Version 20, 2 April 2007

(a) _ ina Major Development Area in the Urban Footprint for -

A (i)

an urban activity -

(1 in an area incliided in a structure plan where the IPA, section 3.1.6

applies;

(1 inanarea not included in a structure plan where -

“ the IPA, section 3.1.6 applies to the application for the material change

of use; or

« the premises exceeds 10,000m2; or
“e’ the gross floor area (GFA) on the premises will exceed 10,000m2; or

impact assessment is required under the relevant planning scheme"

(1 (ii) intensive animal husbandry, or
‘O (iii) residential development involving a rural residential purpose

(b) in the Regional Landscape and Rural Production Area for -

QO (i)

(c) in the Rural Living Area for an urban activity and not specified in section 2. 28(2)

. (d).in the Investigation Area for —

an urban activity and not specified in section 2.4(2); or

CI (i) residential development involving a rural residential purpose and not
. specified in section 2.6(2) :

00 ()  anurban activity and not specified i in section 2.10(2);

O ii residential development involving a rural residential purpose and not _
specified in section 2.12(2); or :
D2 ii) intensive animal husbandry

(ii) reconfiguring a lot-‘
On land in a Major Development Area in the Urban Footprint thati is:

(a) not included in a structure plan; and

(b) not specified in section 3.1(2).

O (iii) none of the above

The application involves: (tick the applicable box/es)

Ot
Diii)

Oi

a)
Ow

(vi

an assessable material change of use for aquaculture - complete Part O; of Form 1;

assessable operational work that is the construction or raising of a waterway barrier -

complete Part O3 of Form 1;

assessable operational work completely or partly within a declared fish habitat area-

complete Part O2 of Form 1;

assessable operational work that is the removal, destruction or damage of a marine

plant - complete Part O2 of Form 1;

development assessable under the IPA, schedule 8, part 1, on land that adjoins a -

declared fish habitat area;
none of the above.

 

Page?

ete

Page 14

INTEGRATED PLANNING ACT 1997
Integration of land use and public .
transport —~

For more information refer to Guide-23, schedule
8A of the IPA, & schedule 2 of the IP Requiation.
Unless you answered “none of the above’, the

application triggers referral to OT as a
concurrence agency.

 

22.

“+ / 4

IDAS Assessment Checklist, Version 20, 2 April 2007
The application involvés: (tick the applicable box’es)— / :
(1 ()) a material change of use assessable against the planning scheme for a purpose

~ mentioned in schedule 13C of the IP Regulation and exoeeding the thresholds set by that
schedule.

ae

D (ii) reconfiguring a lot—

(1 (a) on tand that is completely or partly within a public transport corridor, and the
total number of lots increases;

(1b) onland that is completely or partly within a future public transport corridor or
an airport's public safety area; .

(1 (c). ontand that is within 400m of a public passenger transport facility or a future

: public passenger transport facility, and the total site area is 5000m? or greater;

(21.2) . for a residential purpose within the 25 ANEF contour for an airport;

Le) _ fora residential purpose resulting in 100 or more allotments.

_ Dili) operational work assessable against the planning scheme, but not associated with a

material change of use mentioned in 0 above or F reconfi iguring a tot mentioned in (
above, on land that—

(J (a) _ is completely or partly within a public transport corridor or a future public
: transport corridor;
(6) _ will result in work that encroaches into an airport's operational airspace.
& (v) none of the above. , 6 a

 

Railway safety z and afficie
For more information refer to Guide’
8A of the IPA & schedule 2-of the'IP egulation.

Unless you answered “none of the above", the
‘application triggers referral to ar asa
concusrence agency.

  

  

23. The application involves: (ick the a applicable box/es)—

oO (i) a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13D of the iP Regulation and exceeding the thresholds set by that
_ Schedule.
O (ii) reconfiguring a lot—

(a) -on land that is completely or partly within a future public transport corridor,
future railway land or a railway tunnel easement; 1
- [1 (>). onland thatis within 400m of a Citytrain passenger railway station or a future
. Citytrain passenger railway station, and the total site area is 5000m? or
. greater;
(©) __ ontand that abuts rail corridor land, commercial corrider land or future railway
land, and the total number of lots increases;
(1d) oniand that abuts rail corridor land, commercial corridor land or future railway
land,and an easement abutting the corridor or future railway land is created;
[1 (e) _ on land that is completely or partly within 100m of, and abutting an approach
oN to, a railway level crossing, and the total number of lots i increases,
(1 (f) for a residential purpose resulting in 100 or more allotments.

Oo (iii) operational work assessable against the planning scheme; but nol associated with a
: @

material change of use mentione in (i) above or reconfiguring a lot mentioned i in (il)
above, involving extracting, excavating or filling greater than 50m3, Gn land that—

(1 (a) _ is completely or partly within rail corridor land or commercial corridor land, and
the work is not for rail transport infrastructure or other rail infrastructure;

(1 (b) _ is completely or partly within future railway land, or a railway tunnel easement;

[1 (c) abuts rail corridor tand, commercial corridor land or futurelrailway land, and

, -the work is within 25m of the railway boundary. .
[X (iv) none of the above. oo . : .

 

 

Moonie to Brisbane pipeline

For more information refer to schedule 2of the 1P
Requtation.

Unless you answered “none of the above”, the
application triggers referral to the holder of
pipeline licence No 1 issued under the Petroleum,
Act 1923, currently Santos QNT Pty.Ltd, for
advice.

 

24,

The application involves the easement for the construction or operation of the Moonie to

Brisbane strategic pipeline, and involves: (tick the applicable box/es)—

(1 (i) a material change of use assessable against the planning scheme and not associated
with reconfiguring a lot, and any structure or work will be located wholly or partly in the
easement. ; i !

J (ii) reconfiguring a lot ,

(ii) operational work assessable against the planning scheme, that is filing, excavation,
compaction, drilling, boring or piling not associated with a reconfiguring alot, and the
work is located wholly or partly in the easement.

1H (iv) none of the above.

 

Page 15

 

 

INTEGRATED PLANNING ACT.1997___-
Koata habitat area

—For more information; refer to‘ Guide 26nd ~~ |~

schedule 2 -of-tite IP Regulation. .

Unless you answered “none of the above”, the "
application requires referral to the Environmental
4s a.Concurrence agency. |

 

‘Protection: Agency

 

 

IDAS Assessment Checklist, Version 20, 2 April 2007

 

” Wild river area
_ For more information, refer to Guide 27

\fyou answered YES to Q26, you must also
complete section 2 of this checklist. This will
enable you'to determine if your application can
proceed in.a wild river area and which referral
agency will assess your application against the
Wild Rivers Code, of ifthe proposed
development is “prohibited” in a wild river area.

Note: Development can be ‘prohibited in a wild
fiver area because the application cannat be
accepted by the assessment manager.

25. The application involves: (tick the applicable borlesp=
O 0 a material change of use of premises in a koala conservation area or koala
activity and willresultin- -
{1 (a) clearing of native vegetation over an area a greater than 2500m2;
greater than 1000m?;
[2 (e)_ anextension to an existing building and any reasonably associated structure if
C1 (d) ‘extracting gravel, rock or sand from an area‘greater than 5000m?;
excavating or filling an area greater than 5000m?;
OM tr I
between 6p.m. on a day and 6a.m. on the following day.
Oi) reconfiguring a lot in a koala conservation area or koala sustainability area that will
C1 (a). an increased: number of lots;
Db) clearing of native vegetation over an area greater than 2500me2,
assessable under Schedule 8, Part 1, Table 4, items 1A to 1G {not associated with
reconfiguring a lot mentioned in (ii) above) that will result in the clearing of native vegetation
C1 (iv) operational work in a koala conservation area or koala sustainability area made
assessable under a planning scheme (not associated with a material change of use
and will result in ~ .
D(a) clearing of native vegetation over an area greater than 2500m?;
~L1(e) excavating or filling an area greater than 5000m?,
[XJ (v) none of the above.
2005?
[x] NO

sustainability area made assessable under a planning scheme, that is not for a domestic
(1 (b) anew building and any reasonably associated structure with a total footprint oo
the extension has a total footprint greater than 1000m2;
Oe)
additional traffic in a koala conservation area or koala sustainability area,
result in -
C1 (iii) operational work in:a koala conservation area or koala sustainability area made
over an area greater than 2500m?.
mentioned in (i) or reconfiguring a lot mentioned in (i) above) that is not for a domestic activity
[) (b) extracting gravel, rock or sand from an area greater than 5000m2;
26. Does the application involve development in a wild river area declared under the wid Rivers Act
Oo YES

 

 

e Preliminary Approval

Hfyou answered YES to.Q27, the application ©
triggers referral to the| Department of Local

Govemment, Planfing, Sport and Recreation as
an advice agency.

27. Does the application involve-a development for which preliminary approval i is sought under
Section 3.1.6 of the integrated Planning Act 1997?

INO
CYes

 

 

Wetlands

Domestic activity means the construction or use
of a single residence on a lot and any reasonably
associated building or stucture. Examples of a

_ building or structure that could be reasonably

associated with-a single residence include:
caretaker's residence, granny flat, building or
stucture used for a home business.

* Note: Wetland is defined in the Integrated

Planning Regitlation 1998,

Unless you answered “none of the above” to
028, the application involves referral to the
Environmental Protection Agency as an advice

 

28. The application involves: (tick the applicable boxes) - :
[1 (i) amaterial change of use, other than for a domestic activity, assessable against the
. planning scheme that is in or within 100m of a wetland;
QO fi) | reconfiguring a lot-
In or within 100m of a wetland that will result in
[J (a) more than 10 lots being created; oF
{J (b) lots less than 5 hectares;
A (iii) none of the above

 

‘ agency for the. application.

Page 9

Page 16

INTEGRATED PLANNING ACT 1997
Conservation Estate

Uiban purposes is defi ined in the Integrated.
‘Planning Act 1997 as “purposes for which land is
used in cities or towns, including residential,

industrial, sporting, recreation'and commercial

 

Purposes, ‘but not including environmental

 

 

_B fii) none of the above.

r : .
| . . t -
.t . : \ %

: IDAS Assessment Checklist, Version 20, 2 April 2007

29. The application involves: (tick the applicable boxles)— ‘ of

(1 ()) aimaterial change of use for urban purposes that is in or within 100m of any of the
+ following -
4 (Ja) aprotected area, forest reserve, critical habitat or area of major interest under
the Nature Conservation Act 1992;;
[1 (b) a State forest or timber reserve under the Forestry Act 1959;
L1© amarine park under the Marine Parks Act 2004;
(1 @) ‘a recreation area under the Recreation Area Management Act 1988;

/ [1 (e) aworld heritage area listed under the World Heritage Convention;

(1 (f) Brisbane forest park under the Brisbane Forest Park Act 1977.

Ot feconfiguring a tot if
oO (a) any part of the lot is situated in, or within 100m of, any of the following -—
O ()} — aprotected area, forest reserve, critical habitat or area of major
. interest under the Nature Conservation Act1992;
(1 (ii) a State forest or timber reserve under the Forestry Act 1959; "
(J (il) a marine park under the Marine Parks Act 2004;
(1 (iv) arecreation area under the Recreation Area Management Act 1988;
C1 (v)  aworld heritage area listed under the World Heritage Convention;
Brisbane forest park under the Brisbane Forest Park Act 1977; and
O (b) the reconfiguration involves more than 10 lots being created, or any lot
resulting from the reconfiguring is less than Sha;

 

Page 10

Page 17

e development that require assessment against

__ Ih Section 2.

   
  

+ 3Referrats for development in a wild jiverarea .

~ for development activities which may be made

“ development where wild river requirements

INTEGRATED PLANNING AGT 1997_

 

cae

Ss Assessment Checklist, Version 20, 2 April 2007.

  

 

Wild River Area.

ilt the responsibility of the applicant to
determine :if the development is proposed:in
.a wild-river area.

Information about wild river areas including the;

   

-geographical location and of :
éihanagement areas in relation propetties, can
“be accessed by Contacting the Department of

Natural Resources and Water (NRW), acceésing:

“the departrtent’s Website www.fitw.qld.gov-ay- oF
ig the aepariment by email on:

  
   

iNote.on Referrals

_ (other than for agricultural a¢tivitiesand animal: ”
shusbandry activities) are not changed from the .

’ éxisting referral aftangemerits.

lotes on development assessable
‘against the Wild Rivers Code’
‘orinformation, regarding development in: awild
drea, see the relevant wild river-deciar lon:

 
 
  
 
   
   

 
 

in. will provide informationy regarding, |
ich types ’¢ ‘of development must be. assessed

m gainst the Wild River$ Code, and.in'some
‘cases which types:

     

‘The notes on development assessable against
+ the Wild Rivers Code inthis section af the
checklist provide some guidance however.this,
“thay vary between wild river ateas. The relevant.
<de¢laration will provide the information applying
‘to each wild river area.

févelopment are-exeinpt |)

 
 

“Applications for some:new developments will not |”

be accepted if the proposed developmentis in a
high preservation area (HPA). Most applications

including those in a preservation area (PA), must
be assessed against and must comply with the
Wild Rivers Code where indicated in a relevant
wild river declaration.

‘Environmentally relevant activities
(ERAs) in a designated urban area

It you answered-YES, your application for an
‘ERA is exempt from any wild river requirements
and-provided there are no other aspects of this

wild rivers, you do not need to complete the
remaining questions in Section 2.

-Ifyou answered NO to Q2, please complete the
fremaining questions in Section 2.

Clearing native vegetation

“If YES, there are a'limited number of purposes
for which an application to clear native
vegetation may be accepted in a HPA. See
Guide 27 for a list of relevant purposes for
which an application may be made in a HPA.
If YES and you ticked Q4 box i) the application
may be made and is assessable against the Wild
Rivers Code, tf YES and you ticked 4 box ii)
the application will not be accepted.

Note: If clearing native vegetation is in a PA,
there are no wild river requirements and
provided there are no other aspects of this

apply, do not complete the remaining questions

 

2.

4.

 

Which wild river area is the development proposed in?

 

 

 

 

 

 

The proposed development i is to.be located in: (tick the anpicable bowes)
(i) a high preservation area (HPA):

(Ji) a preservation area (PA) ; .

O iii) a wild river floodplain management area (FMA);

O iv) a wild river nominated waterway;

(1 v) a designated urban area (DUA).

Does the proposed development only involve any of the following environmentally relevant
activities (ERAs) in a designated urban area (as: mapped in the relevant wild river declaration)?
i) An ERA 28 or ERA 14; or

ii) A level 2 ERA except ERA 1, 2, 3, 4, 20, 22 or 59.

mine

oO YES (ensure you have completed Part G of Form 1)

Is the application operationat work for clearing native vegetation ina HPA?
O NO O YES (ensure you have completed Part J of Form 1)

If YES, is the clearing? '

O i) clearing regrowth (as defined in the Vegetation Management Act 1999) in a registered
area of agriculture in a HPA (see Guide 27); or

oO ii) in a HPA outside a registered area of agriculture?

Page 11

Page 18

INTEGRATED PLANNING ACT 1997

Works in tidal areas, coastal
management districts and fish habitat
areas

\fyou answered YES to Q§, and ticked any

boxes in Q6), your application is required tobe

assessed against and must comply’ With the Wild
- Rivers Code.

lfyou answered YES to Q5 and ticked box i) in
. Q6, your application is required. to be referred: to |
the EPA.

-Note: If-specified works are proposed ina local
govemment area, it is.preseribed ‘tidal work - the|

-Televant local govemment wili be the
-asSessment manager with the EPA as.a
Coneurrence agency
4f you answered YES to Q5, and ticked box ii)-or
-iil} in Q6, your application requires referral to
OPIF. :

“Ifyou answered'NO to’Q5:and ticked box i} in

: Q6, the. application will not be accepted.
ifyou answered NO to Q5,ticked. box ii) in.Q6
and the development is necessary to install
authorised works or-infrastructure where a
development permitis.not tequired, orif.a
‘féquired: permit is held, the.application must be
assessed against and must comply with the Wild

“Rivers Code. Applications for.purposes other
than specified works or as described above will":
not be accepted. °

Ifyou answered NO at 6S and ticked box ii) in-
Q6, the apptication may be made if the works are
ina PA. These applications must be.assessed. .
against and must comply with the Wild Rivers.
*-Code. The application will not be accepted if the

development is proposed to-be located.in a HPA.

For more information about specified works refer
‘to Guide 27

Residential, commercial or industrial
development

ff you answered YES to Q7, your application is
not subject to wild river requirements, Provided
there are no other aspects of this’ development
that require assessment against ‘the relevant witd
river declaration or Wild Rivers Code, you do not
need to complete the remaining questions in
Section 2,

Ifyou answered NO to a7 and’ ticked either. box
i) or ii) in Q8, the assessing agency is the
relevant local government, :The application must
_ be assessed against and must comply with the

_ Wild Rivers Code.

f .
f ; . - '
f O . IDAS Assessment Checklist, Version 20, 2 April 2007

5." Is the development for specified works? (see definition in the Wild Rivers Act 2005 and Guide 27-
Development in a wild river area)

_CINo Clyes

6. The application is for one or more of the following:

(1 i) Operational works that is tidal works or works in a coastal management district (ensure you
have completed Part M and/or Part P of Form 1}, or

O ii) Operational works for the removal, destruction or famage of marine plants (ensure you have
completed Part O2 of Form 1); OF

O iii) Building or operational works in a fish habitat area (ensure you have completed Part Oe of Form 1).

7. \s the application for residential, commercial or industrial development in a designated urban

area?
no Clyes

8.. IF NO, does the application for residential; commercial or industrial development involve:

oO i) a material change of use made assessable in a local government planning scheme
(ensure you have completed Part D of Form 1); or

L ii) operational works associated with reconfiguring a lot (ensure you have completed Part F

of Form 1).
®

 

Animal husbandry activities

Ifyou answered YES to Q$ your application
requires assessment against and must comply
with the Wild Rivers Code.

The assessing agency is NRW.

Note: Applications for animat husbandry
activities will not be accepted if proposed in a
HPA. For more details and a definition of animal
husbandry activities see the Wild Rivers Act
20085 and refer to Guide 27. _

'|9. Does the application involve a material change of use for animal husbandry activities (as defined

under the Wild Rivers Act 2005) in a PA?
O NO O YES (ensure you have completed Part R of Form 1)

 

Agricultural activities

Hfyou answered YES to Q10, your application .
requires assessment against and must comply
with the Wild Rivers Code.
The assessing agency is NRW.
Note: Applications for agricultural activities will
not be accepted if proposed in a HPA. For more
details and 2 definition of agricultural activities »
see the Wild Rivers Act 2005 and refer to Guide
27.
The production of fodder in a PA, and pasture
improvement using low impact soil disturbance
~___ techniques is not an agricultural activity as
“defined under the Wild Rivers Act 2005: For-
more information see Guide 27.

 

10. Does the application involve agricultural activities (as defined under the Wild Rivers Act 2005) in
aPA? —

[J No

11. If YES is the application for:
[71 i) a material change of use; or
oO ii) operational works.

[1 YES (ensure you have completed Part Q of Form 4 )

 

 

f

Page 12

\ »

 

Page 19

oe

- against the relevant part of the Wid: Rivers Code

“Works that interfere with overland

a The relevant wild river. declaration: will sta!

 

vahds must comply with the code.

-_ Subject to wild river requirements.

. ‘that stated to be assessable, self-assessable or

- banter works in a HPA wilt not be accepted.

 

INTEGRATED PLANNING ACT 1997
Works that take overland flow water _

—"The ta relevant ant wild fiver declaration wil state
works that take overland flaw water are either
self assessable or assessable, or are exempt
from wild river requirements,

Wyou ticked Q13 i), your application must be
assessed by NRW against the Wild-Rivers Code |
and must comply with the code. .
Ifyou ticked Q13 fi) an application is not requ
to be made however the works ius! pl

the relevant self-dssessable section of:thé Wild
‘Rivers Code; otherwise the woiks become

   

assessable development for which an appfic ition

is required and must be assessed by NRW

and must comply with the code.

Ifyou ticked Q13 iil) your application is not
Subject to wild river requirements.
Applications for dévéiopment that is other th
that stated to.be assessable, seff- assessable ol
exempt will notbe accepted. 7

 

  

‘flow water

  

orks that intérferé with overland flow wai
f@ either self. assessable, assessable dr exempt
om wild river requiréments.

Ifyou ticked Q15 i), your.application must be. -
‘assessed by NRW against the Wild Rivers Code:

   
  

 

if you ticked: Q15 ii) an application is not required
to be made however the works must comply with |
thé-retevant self-assessable section of the Wild
Rivers Code, otherwise the works become
assessable development for which an application
ts required and must be assessed by NRW *
against the relevant part of the Wild Rivers Code
and must comply with the code.

Ifyou ticked 015 iii) your application is not

Applications for development that is other than
“exempt will not be accepted.
Waterway barrier works

Applications for building or raising waterway

if you answered YES.to Q16, your application .
‘must be assessed by DPIF against the Wild
Rivers Code and must comply with the code.

 

16.

“IDAS Assessment Checklist, Version 20, 2 April 2007.» __

Does. the application involve works that take overland flow water in a HPA or an FMA?

‘LJno

O YES (ensure you have completed Part Ka of Form 1}

If YES, is the application for works stated in the relevant wild river declaration to be?
(J) assessable works

(J ii) self-assessable works

(1 iti) exempt works

Does the application involve works that interfere with overland flow water in a FMA?
oO NO O YES (ensure you have completed Part Kio of Form 1)

If YES, is the application for works stated in the relevant wild rivers declaration tobe?
oO i) assessable works.”

(ii) self-assessable works

oO iii) exempt works

Does the application involve building or raising waterway barrier works in a PA?
O NO | YES (ensure you have completed Part O3 of Form 1)

 

Se Aquaculture (non ERA)

‘Applications for aquaculture in a HPA will not be
accepted.

Mf you answered YES to Q17, your application
must be assessed by DPIF against the Wild
Rivers Code and must comply with.the code.

Does the application involve aquaculture in a PA? :
O NO O YES (ensure you have completed Part O; of Form 1) ‘

 

 

+ nominated waterway are not subject to wild

wild [email protected] that interfere with water in a
watercourse

Note: If the development is proposed in a HPA,
applications for all works that interfere with water
in a watercourse (including dams or weirs,
“stream realignment or stream diversion) will not
be accepted.

Ina PA, applications for inseam dams and
weirs may be accepted in nominated waterways.
Ifyou ticked box ii) in Q19, your application will
not be accepted.

Note: Operational works outside a HPA or

river requirements.

More information and locations of nofhinated
waterways is available by cdntact NRW,
‘accessing the department's website

Yaww.nrw.gid.qov.au of contacting the
‘department by email on:

 

Does the application involve operational works that interfere with water in a watercourse thatis in
a nominated waterway in a PA?

O NO oO YES (ensure you have completed the relevant Part K of Form 1)

IfYES,
oO i) The application is for an instream dam or weir; or

oO ii) The application is for operational works that interfere with water in a watercourse, and is
for development other than a dam or weir. ‘

Page 13

Page 20

 
 
  

INTEGRATED PLANNING ACT 1997
Environmentally relevant activities

Most applications for an ERA in a HPA will not
be accepted. Applications which may be made
requite referral to the ERA. The assessment of
some’ ERAs is assessed by NRW, others have
been devolved.to DPIF, NRW or delegated -
local goverment (see.EPA website for more
information on devolved ERAs)

Hyou answered NO to.Q20 you do not need to]

complete Qs 21- 24.

tfyoy answered YES to Q20.and the . 4

  
  
  

: development is in
assessed by th
against the Wild n

. with'the code, unless the proposal
development where‘an application will ‘not be
‘accepted, or is exempt from wild river
‘Fequitements (See:Q2). You will be able to:

Aetermine if an application wil not. ‘De: accepie
for the‘ ‘development by answering O24 =. 024.
Hfyou answered NO'to.Q21, you-do not need. to
complete-Q22. “If you answered YES to'Q21 fou
are-required to;complete 22: °*

Ifyou answered NO to'Q22, the application wi
not be. accepted, fy

  

 

  

by,
- against Chie Wild Rivers ‘Code: and must comply
with the code, .

fyou answered NO to 023 aaite eed
ds proposed in the HPA the appli
‘accepted, you answered YES to. Q23, ‘the *

“application must be assessed by the ERA of
-NRW {as prescribed in schedule 8A of the IRA) .
against the Wild Rivers Code .and.must comply
with the code. :

 

Mf you answered YES to Q24 the application will ~ :

hot be accepted. Hf you answered NO to Q24,
your application must be assessed by NRW

against the Wild Rivers Code and must comply .

with the code.
Exempt ERAs ina designated urban
area
Ifthe development is proposed i in a designated
Urban area there may be no wild river
requirements. See Section 2 Q2.
™ .

"Note: All applications that can be accepted must

be assessed against and must comply with the
Wild Rivers Code (other.than exempt ERAs in a

 
 

 

IDAS Assessment Checklist, Version 20, 2 April 2007
20. Does the application involve an ERA? “

Lino

21. Is the application for an ERA 20 instream?

[_]No (] ves

22. |s a quarry allocation notice held for the proposed ERA 20 instream?

‘LINo Chyes

23. Does the application involve any of the following in a HPA?
i) a level 2 ERA 11, (and is for specified works or a residential complex)
ii) an ERA 19 (dredging)
iii) Low impact ERA 20 (out of stream) for specified works or a residential complex (as defined in
the Wild Rivers Act 2005, and Environmental Protection Act 1994)
iv) an ERA 22 (out of stream)

[Jno (1 Yes

| YES (ensure you shave completed Part G of Form1)

| 24. Is the proposed development for ERA 20 (out of stream) and:

— inaFMA; and
— notlow impact; and
— not for a residential complex in the area, or for specified works.

LJ no Dyes

 

 

you nswered No to Q25, your application
subject Jo an information request and
. processing of the application may be delayed.

 

|25. Has documentation been included with the application describing how the applicant proposes to

- comply with the mandatory requirements, required outcomes, and/ or performance requremenay
as set out in the relevant part/s of the Wild Rivers Code?

LJno [Ll yes

 

 

2 The administering authority may be either the EPA, or if devolved or delegated, the local government, DPIF or NRW.

Page 14

Page 21

INTEGRATED PLANNING ACT 1997. *

 

IDAS Assessment Checklist, Version 20, 2 April 2007 -

 

 

  

 

SECT ON.3

 

SE green MR ee

   
   

mpietion ni

ber: Ph tesa she ene an Serves amma nace ap Pek 8

BUILDING REFERRALS (¢

 

Below is a list of the referrals that can apply to an application for building work assessable against the Building Regulation 2006. This section of the IDAS
Assessment Checklist is provided for advice only. This section of the IDAS Assessment Checklist is not required to be completed and iodged with an
application for building work assessable against the Building Regulation 2006 only.

 

 

 

  

 

   

 

 

  
 

 

 

 

 

   

 

 

 

 

 

 

 

 

Special fire ervices - ‘generally 1. Anapplication may trigger referral to Qld Fire and Rescue Services as an advice agency if the building work
For mote infoitn sthedulé 2table 1 and requires special fire services mentioned in schedule 2A part 1 of the integrated Planning Regulation 1998
Schedule 2A of the 1PRenulaton. (iP Regulation} or includes an alternative solution assessed against the performance requirements of the
Assessment period 15 days. -Né resporise is.a Building Code of Australia.
deemed, refusal. - 5
LFire.safety for bu accommodation ' An application may trigger referral to Qld Fire and Rescue Services as an advice agency if the building work
For more infotmation go t' ‘schadule 2 ofthe |P - the subject of the application requires the installation of a fire safety system for a budge! accommodation
PReoulation ’ : building.
Spray painting 3. An application may trigger referral to the Department of industrial Relations (OR) as a concurrence agency
For more information goto schedule 2 of the |P if the application involves a workplace incorporating spray painting.
| Reautation
‘Retail. meat premises 4. An application may trigger Teferral to Safe Food Qid as a concurrence agency if the application involyes a
For more infc to’schedute 2 of the IP retail meat premises.
Régulation - . - . . .
‘Private health facilities ‘15.- An application may trigger referrat to the Department of Health as a concurrence agency if the application
east information go to.schedule 2 ofthe IP. involves a private health facility.
'|6. ~ An application may trigger referral to the Department of Industrial Relations (DIR) as an advice agency if the
application involves a work place area less that 2.3m2.
‘Land contiguou loa State-controled 7. Anapplication may trigger referral to the Department of Main Roads as a concurrence agency or advice
} road agency if the application involves land contiguous to a State-controlled road.
For more information goto to schedule 2 of the IP - .
: Reaul ation - :
Pastoral workers: accommiodation.. }8. An application may trigger referral to the Department of Industrial Relations (DIR} as a concurrence agency
For more information g¢ toschedulé 2 of the IP if the application involves pastoral workers accommodation.
Regulation
Child care centre 9. An application may trigger referral to the Department of Communities as a concurrence agency if the
For more information go to schedule 2 of the |P application involves a childcare centre. iy
Reaulafian t
Coastal development 10. An application may trigger referral to the Environmental Protection Agency (EPA) as a concurrence agency
For more information go to schedule 2 of the IP if the application involves land completely or partly seaward of a coastal building line”.
Requtation .
Heritage 11. An application may trigger referral to the Heritage Council as a concurrence agency if the applicaion
For more information go to schedute 2 of the IP ° involves a heritage registered place.
‘Regulation .
Fisheries matters 12. An application may trigger referral to the Department of Primary Industries and Fisheries (DPI&F) as a
For more information go to schedute 2 of the IP concurrence agency if the application involves assessable building work in a declared fish habitat area; or
Regulation as an advice agency if the application involves assessable building work on land that adjoins a declared fish
. * _ habitat area, ,
integration of land use and public 13. An application may trigger referral to Quéensland Transport as a concurrence agency if the application
transport involves existing or future public transport corridors, or airport operational airspace?3.
For more information go to schedule 2 of the [P
Régulation
Railway safety and efficiency 14. An application may trigger referral to Queensland Transport as a concurrence agency if the application
For mare information go to schedule 2 of the IP involves future railway land. .
Regulation

 

 

 

NOTE: CONCURRENCE AGENCY ASSESSMENT PERIODS

The local government, as the concurrence agency, is required to assess and provide a response for the following building applications within a prescribed
time. For applications relating to design and siting (17, 18 & 19), and building work for removal or rebuilding (23), the assessment period is 5 days. For all
other applications the assessment period is 15 days. If no response is received from the local government for an application, it is taken to be a deemed
refusal. However for amenity and aesthetics impact of particular building work for a single detached Class ta or class 10 building or structure (15), no

tesponse is taken to be a deemed approval.

 

Amenity and aesthetic impact of
particular building work for single
‘detached class 1 building or class 10
} building or structure

For more‘information go to schedule 2 table 1 of the
IP Requlation.

‘Assessment period 15 days. No responses 3

 

 

deemed approval.

15.

An application will trigger a referral to the local government if it is :
«for a single detached class 1 building or class 10 structure; and
the local government has declared by resolution the following:
— the appearance of the building or structure will have an extremely adverse impact on the amenity of
the locality; and
— the appearance of the building or structure would be in extreme conflict with the character of the
locality. .

 

 

2 Coastal building lines are prescribed under the Coastal Protection and Management Act 1995,
2 Operational airspace is as defined in State Planning Poticy 1/02 "Development in the Vicinity of Certain Airports and Aviation Fates".

Page 15

Page 22

INTEGRATED PLANNING ACT 1997

 

5 '

"xs Assessment Checklist, Version 20, 2 Apri 2007.

 

 

 

 

 

 

 

 

   

 

  
  

 

designated rainwater tankarea

For more: information go to schedule 2 table 1 of the
(Pp Reaulalion and the QOC par 25°"
Assesseient period 15 days, No response is 2

jeemed refusal.
te

 

.| Whether paiticular buildings may be | 16. An “application to use an existing building that is not class 1, 2, 3 or 4 for residential purposes may tigger a
occupied for residential purposes referral to the local government as the concurrence agency.
For more information go to schedule 2 table 4 of the
{P Reguiation.
Assessment period 5 days. No response is a
deemed refusal. . . .
‘Design and siting 117. An application may trigger referral to the local government as the concurrence agency if the building work
‘For-mote information go lo schedule 2 tale ofthe does not comply with the performance criteria of parts 11 and 12 of the Queensland Development Code,
P Regulation. 18. An application may trigger referral to the local government as the concurrence agency if the building work
“Assessnient period 5 days. No responsé isa does not comply with the qualitative statement for building clearance and site cover.
‘deemed refusal. 19. An application may trigger referral to the local government as the concurrence agency if the building work
7 does not comply with the qualitative statement for performance criteria 4, 5, 7, 8 or 9 of the Queensland
: : Development Code, part 11 or 12.
Fire safety in particular budget + | 20. An application may trigger referral to the locat government as the concurrence agency to determine the
om building will comply with the fire safety standard under the Building Act 1975 when the building work has
For mor ‘information go to schedule 2tabte 1 ofthe | been completed.
IP Regulation. 1
‘Assessment period 45 days. NO response isa.
- | deemed refusal.
‘Higher risk-personal appearance 21. An application may trigger referral to the local government as the concurrence agency to determine if the
‘services ~ 8 | building work
“For hore informalion’go to schedule 2 table 1 of the * — complies with the performance criteria of the Queensland Development cade part 15; and
‘IP Regulation and the QOC part 15. « the Work does not comply with an acceptable solution stated in the part.
‘Assessment period” 15 days. No} fesponse isa.
‘deemed fefusal). * | . @
Building work for residential: service | 22. An application for building work for premises in which residential care service under the Residential
For inore information go'to schedule:2 table 1°of the "Services (Accreditation) Act 2002, section 4, is conducted, or is proposed to be conducted, will trigger
JP Regulation and the QDC part 20. referral to the local government as the concurrence agency.
Assessment period 15 days, No response is a .
deemed refusal. sd
Building work for removal or f 23, An application for the removal and/or Tebalging at another site ofa building or other structure;will trigger
rebuilding : j referral to the local government as the concurrence agency.
For more informatign.go to schedule 2 table? of the ‘ : . we .
IP Requlalion, a i : 4
Assessment per 5 days. No response isa _
_ [deemed retusa” | “
he Building y ork for rainwater tank in 24. An application may trigger referral to the local government as the concurrence agency to determine if the

_ © Under the Building Regulation 2006, a rainwater tank is proposed to be installed as part of relevant

building work or structure complies with the relevant performance crileria if -

building work, in a designated rainwater tank area; and
e Under the Queensland Development Code, part 25; the rainwater tank does not indlude an acceptable
solution for a relevant performance criteria. Soa

 

 

 

 

rm

4

t
k

fame

Page 23

 

 

—Kvse = t ase re] _..
.

Ye Keer
7 Cocteccd ah A aXe =h os

War: Cand wey
Aecoan ® wen 1
Fe to Sn ek

en S2dtwre i. AS cone
oe aes ie Vicon

Lua oo — 1 )

alts

 

Page 24

If telephoning or calling please ask for:

| woMESeN state Sas

Email: [email protected]

4 mM COUNCIL Application Ref: 2005/2302

Your Ref:

1 June 2007

Parish Clarke Architects
PO Box 4153
ST LUCIA SOUTH QLD 4067

Dear Sir/Madam, ~

Re: Application for a Development Approval for Material Change of Use for
Duplex Dwelling situated at 29 Ventura Street, Sunrise Beach described as
Lot 124 RP 132134 | @

{ refer to your application and advise that on 31 May 2007 Council decided to:

 

A. — Approve the application and grant a Development Permit, subject to conditions.
B. Approve the application despite its conflict with the Transitional Planning Scheme
} for the following reasons:

1. The applicant actéd -in good faith gby- complying’ with the plot ratio
cee oo . “ requirements“of-0.5:1- of the ‘draft- N66Sa*Plans which-had been: publicly ~- ~--
advertised at the time of the application was lodged.

2. The propose development is unlikely to have a significant adverse impact
on the amenity of the area. ..

3. No submissions were received objecting to the proposal.

Details of the decision are contained in the attached Decision Notice.

 

‘ ww , Please note that an Infrastructure Charge in accordance with the Coastal Major Road @
Network Infrastructure Charges Plan has been triggered by the approval of this
development application. An Infrastructure.Charge Notice is attached in compliance
with Chapter 5 of the Integrated Planning Act 1997.

You are entitled to appeal against this decision. A copy of the relevant appeal
provisions from the Integrated Planning Act is also attached.

During the appeal period, you as the applicant may. make written representations to
Council about the conditions contained within the.development approval. If Council
agrees with the répresentations, a “negotiated decision notice” will be issued. Only one
“negotiated decision: notice” may be given. Taking this step will defer your appeal
period, which will continue after Council makes its“decision. (Sections 3.5.17 and
3.5.18 of the Integrated Planning Act refer).

. ‘

award Winner= Aistralian Clean Beach— NOOSA COUNCIL x. i" ae
. - ABN 97 959 214 125
Challenge 2004 Litter Prevention 9 Pelican Street Tewantin PO Box 141 Tewantin Q 4565

Phone: 07 5449 5200 Fax: 07 5447 1062
+ Email: mailharnnncs ald ne ac

 

:

Page 25

S80-WO-PLANS og Wad, be 2001 1211 os

 

 

 

 

 

 

 

 

 

 

—_
—
_ —
= wee eee ee
—_
—
_—
—
— .
. _
. —
. _—
. —
. —
—
es
-— ait
~_
a 1m im_m an t om
wt ve
far
! =
CARSPACE CARSPACE CARSPACE
2500x5400 25005400 g 2500x5400
ren 1
vor
‘tank
5000,
|"
eat -—S
_ . -~
he — L |
‘storage:
cots | ection
_ ng. bic a, spe
|
4
\

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

UNIT 2 PARKING

 

 

 

 

 

 

 

 

  

UNIT 1 PARKING

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

GROUND i | i
RL 26.28 i
B
&
a :
"
BASEMENT
[RC_ne ] xizaag fo ong. dete | wa kare

 

 

KJ SCALE 18

 

(or) DRIVEWAY DETAILS

 

 

 

 

 

 

peat nt pe

} ==
\)
\

 

JOHN DEVITT
OREALLA CR & VENTURA ST
SUNRISE BEACH

 

PRR OSEO

 

RESIDENCE
LOT 124

NOOSA QLD
a» 480.NOO 10101

110 QA

   

[i] Preummany (Cj Review

 xaso (] For construction
[pa [Workin oRAWwiNG

 

 

 

Page 26

 

 

ASD OSPLANS ty Wd, $ Sea EP SET

 

A

4X

 

 

 

EXISTING RESIDENCE *,
AREA BREAKDOWN

 

q

   

PROPOSED RESIDENCE
REA BREAKDOWN

  

 

 

 

 

 

 

 

 

STEAREA —_624.14m" | 624.14m?
Tor, 162.82 178.19m*
132.142

‘| PLot paTio\

 

26.21%
\

 

 

 

 

 

 

 

 

      

{ basement parking 260.55m? )

\

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

rl

i
|e crossing
‘Yo ch ang, deta

 

TOTAL GFA: 310.30m?
PLOT RATIO: 49.96%
4
\
\
\

\

. \ _
ut
re}

\ ao
\ re
\ on
\ \ <
\ \ fe
\ \ 2
\ \ =
\ \ a
\ \ >
\
\
; (
few verge craig \
+ tewol to mitch existing
seal grotund bevel \
low for fit
\dezignteam

 

 

 

 

ARCHITECTURAL PROJECTS

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

FENCING

 

 

 

 

 

 

 

 

 

 

 

 

g :
OTA \ :
OOS
aes ne on :

(or) SITE PLAN ©
XT Sta 130

 

A JOHN DEVITT
| \ OREALLA CR & VENTURA ST
\ SUNRISE BEACH
Of teeig mete
PROPOSED
RESIDENCE -
|. LOT 124 .
{Noosa ao] .
4 SITE PLAN
en 480.N00 00101

 

[2] PRELMINARY [7] Review

Ci xeso
(0

(J Forconsrruction

(C] Workin oRAWwinG

 

 

 

Page 27

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

                                       

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

[Fraser sland apple A 4 45h ~_ Seren
Satinesh AN 2 ast Sereen
Littypilty. AS at asi ‘screen, = > Ny
Litypilty dwarf ‘Am 25 | 206mm | small shrub EXISTING -RESIOENCE ‘8 PROPOSED RESIDENCE
Beach birds ALO 4 45tt Tree a= ane i A ‘ — ee
rate eras ne | 40 | Bom pat sha AREA BREAKDOWN a
farchontophoenix cuaninghantla__[Bangalow palm ou | 27} 45tt__[ chaip/soreen — =— a ~
feanksia Integrifotla faanksia ot 3 a5tt_) street tree SITE AREA: 621.1 Im? 621.14inF
faanksla robur swamp banksia Br 12] Fo0men | smal shrub .
i k ottle brush te 60 | 200mm | small shrub . . .
reer ie Rabie ‘sland pine Ce. 3 ‘astt screen TOTAL GFA" 162.8207 A 178,19m?
iCordyline australls INative cordyling ca 80 | 200mm | small shrub | ~ . a ‘FIRST GRR 132.14m?
a id co & 300mm _| feature . “ * g . ‘ i
eyes vou = os a = . 4 . r at . PLOT RATIO; 26.21% . ( basement Rarking 260.55? }
* Teleaocarpus reticulatis Blueberyy 22h er, 4 a5it screen 4. . Set 4 . 2 OR {.@ . %
lLomandra hystrts feat rush 220 ["igomm [ground cover , ~ : By 4 4 : QT 4 ‘TOTAL GFA: 310.30m?
fstutch: Grow mutch min. 75mm thick ‘ ‘ “, , ‘ : 4 ° mE “—f ‘ PLOT RATIO; 49.96%
Fertitiser: Katek super gow pelfets, |. y S i" 4 y ‘ .¥, “ . -
Premium grade sollte be used for planting : S . ‘ . 3 . . . : * = 2 (te . . :
éxiating banksla on southern boundary to be retained, en i | ‘ ‘ i i , - . my eee . } Sch / :
[Second banksia on site is dead. Replacement a3 street tree. i I { 4 ", y \ i 4 . § ° A wy ‘ s t
* vo oN 2 oe Ss< 7 | 4 ey ; \ , Undaptart mt
| \ Gg ‘ DN Dentin. Tht
(@)
Ne Rao, Jf
| \ —
a
Er, VEN ch 3
“ay yore
2 | ap ®) Lay
tal
ny
.
ue
i :
a
eA avcantictts bap atuneem sean ab
JOHN DEVITT
OREALLA CR & VENTURA ST
+. SUNRISE BEACH
Project: Orealta Gr and Ventura St, Sunrise Beach.
Plan Tite: Landscape Plan
ate: 12/09/2007
Seale: 1:50 (Al)
e043)
Project No: Dev- O0t
Orawn By; Richard Leathers Dip. Hort.
Design by: Greenscapes Nursery and Design Pty Ltd
, Contact: 07 54556825 Mob: 0403702454
. Drawing No: 070912 - 1. ‘

 

 

 

 

sees | tesuer A

7

Page 28

 

 

C) Lot 29 on RP132534

 

 

 

 

EERE As AE Rats SEES ~

LOT 29 VENTURA STREET

               

DRAWINGS

1682-1 ~ GENERAL NOTES & LEGEND
1682-2 — BASEMENT HYDRAULIC SERVICES
SUNRISE BEACH 1682-3 ~ GROUND HYDRAULIC SERVICES
1682-4 , - LEVEL 1 HYDRAULIC SERVICES & ROOF PLAN

FOR

JOHN DEVITT

 

Management

1g devices like leaf eaters
rs

3. To keep and maintain a log of cleoning

GENERAL NOTES .

Woter Supply and Sanitary Orcinage hos bean dasignad ond shall be constructed 10 4. To clean devices first. flush storage tank
accordance with tha Q’kd, Standard Sewaroga Law, O'ld Standord Woter Supply Low,
‘tha Hetlonal Phimbing ond Drainage Code AS 3500, of relevant Austrofien Stondards,
tea Ine eequlrements, of the Local Author

Thess Drawings are clogrommatic onty ond shaw be ¢¢
Arertectural and other cocautonts arowings. and. speci
instructions Lot moy be itswed during
Any dixcreponcien shot de referred to

    
                      

ame Boi oy

             

in conjunction with aw relevant
atone ond sther writen 5. To inspect and clean minimum once yearly

at ‘ ,
oper 6. To install and mai iN pump and fixtures for

PROPOSED DEVELOPMENT

 

  

procs with the work. irri
Coat anon verily af fixture tocotlons, tnvert tevets, mutt reuse/watering/irrigation as to manufactures speci
cover are cocreect ond obtcinante " r

The exact’ tocutlon of exallag, end propoed e
the relevant Authority, o other trades oa
Fee ‘stop coors ta Sa used on af plastic
corertruction,

SANITARY DRAINAGE

Guecrrouts 4 inapeetion orerings, brought te sutoce in paved or concrete \
STORMWATER DRAINAGE
Underground rk tha’ be 160 dia PYC class SW min grads 1:100 UNO.

Dow ‘hal ba 100 Dio PVC clos SW.
Reinvoter outets (WO) and planter outtete (PO) shall be “Colle Wode" oF elmbat,
with membrane clamp where required,

WANE SULT om wre eee to
v 0 pe ater supply 9 wen
Bester sO om hg Saree

fot water ppenoth, snot longed . +
Hot water fececutnting Grew 1p be ineuicted with 20mm “Armaties” or simior, pee seme ee Bape ee =
Provide \empering valves on. hot woler to. parsonol Mygiane tures,

Udervourd copper pibewer ate be “Neminaued, oh oierwite ptete, i
Underground pipework nat under concrete slab moy be polyplps class PNZO. Q—
one ee forge ten anown, ‘ , ~

Expand pipework in amenitive area, shad be chrome plated, i
Whom mater meters oro inetoled within tennanciea, provide tomate readout ~sraratt... fa]
Sgjocent to. Eloctecel meters, of ie positon os ladicated by the Architect, conneclon we

BASEL REVO wn SEF" oe
Provtie RPED to eny Wrigtlon connections, . eee miler over devlees
19

COVERS & FRAMES NORMALLY OPEN
overs qubjact to vecul volte to Se ont fo couche Gu ‘solenald vaive. Horvaeting Tank
TN to match paving pattern, on speci

 

 

1 | Pressure pump system
3 | on apacltied

 

8

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
       

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
  

  

 

 
 

 

 

    

 

  

   

 

 

 

LEGEND
ne Nom potable water . Dlometer
= BS fox Bement to rare pore : Teseieon ai
= batting storm ote y Davey. rerontey, mutitoge preaure pump "M270-99T
on it Exieting Rouse drain ‘oer we 1
== Sg | Bee moe
III Gels Mater in { mnging powered pur 2508 i Secondary finroton
sat Soon Wow Drainage ay | Hee agning mean j Patna w ti-Ts
Tn Fe
SBT pen fh ! 2s
FHR
FFL |
Ga _ ets tar ser mm Ciahwosher !
Down Pipe on |
@e= ms # = SO Ns wa as Ta
vent Pre on [Tem |! | : emer
QR rp vent ‘ iL i i ot Buiidina Aoorovel |X 13-707
@e@= sn e “TESS Lr. | faci
Care Hot water seer r i somo ‘ 2 lbw Constructed
Fire Dropper fo napection opening: mene enn ene en emmeen megs mes, orem te never }
On Fie Rewr ee ny BE ! .
CR) an potaote ener we tog |
a= water meter is Pere ug vine ["] 1 Provide moscuite sate | pees te pee
a te FE cons ae Site S21 | ---________
a= ann Eccentric enlarger ge | Roof, 230m? contact: Reinhold Koenning stsus RPEQ No 7023
teem en Enlarger fn [ | | Driveway 43m? Basatea DAD 4875 ‘
GY cre Overtion Retnt Gury SL ‘ i t Landscape 348m" erpaik rk Oconhyd.com Th baat pane
flo © ty a Lee ee i i New impervious 25m? a
ta mets “WON POTABLE! yA i JOHN DEVITT
FoI «sm % 1 ! CATCHMENT AREAS
td ARCHITECT:
Tt teary op ) Trench’ grate tronnverze, bor 4 | Note: 1 5
em eating Ey Thermosttle rbig wove Pump | All Kitchen, laundry & bathroom fittings and toilets PARISH CLARKE ARCHITECTS
Moening , Tempering vata . to camply with the AAA Water Conservation Rating PROMECT: ~PROPOSED DEVELOPMENT
fee Sig Mente we Greer 3 q System ca defined by AS/NZSE400 LOT 29 VENTURA STREET
yi ar . c : e ,
an Bein ge Gree nea oversee erigation 1 Mt | Provide flow restrictor valves where necessary SUNRISE BEACH
L . { to taps and shower roses. The fiow shall not ORAWING TITLE:
Ce) om Btn Xx Sh Shower — °—— : finag valve enn i exceed a maximum of 9L/min
Stormwater ”
TEL ne fe Os net water tem a pain bon i |
" Note: RAL NOTES &
TD cs Ciaanare x j Do nat scole fro drawigns. GENE
. j m these drawigns. LEGEND
> + Do not rely on these drowings for
atormeater 7 Captary eed tubing j ° af
ayster, 1 discharge alignment and levels of all existing
" fies feed vice, or i infrastrcture x
7 in garden Im away ! it is the obi ion of the contractor
i and/or plumbing contractor to survey sree] RK Tosa] Tiere [12-707 | Peo Fs.
RPG, Tosns all existing services prior to \. sous 21:190 ‘oat unal dof 4 | 1682~1

 

 

 

 

main construction t (RPD:= Lot 29 on RP132534

 

Page 29

 

 

 

rt marries

 

 

 

 

round. pl
round. plan
168; ri

 

 

 

  

 

 

 

 

     

 

Com ahiseare

 

 

 

 

 

 

 

 

Basement
RL23,625

Unit 2 PAPIING

 

 

 

 

 

     

 

eestvent
E2ras

123.300

 

 

 

 

     

|_/

arya He abet

 

 

 

   

ster Ground
682-2 pen

   

   

    

  

 

 

serorathien

 

 

 

 

RIAN, oy
§

  

     
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Cans Pa,

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

| et

 

zz. | aed

 

 

 

 

 

 

 

BASEMENT WATER SUPPLY

 

TOP ELEVATION

    

590
Trench Grate

o 60
Perforated ———-k J 8
SE Weak “Screen

 

Gohwanized Metal-Cless 8

Trench Grote

 

 

 

 

 

 

 

795,

 

 

 

200
po

 

 

 

870
FRONT ELEVATION

CLEARMAKE GROS:

=e mater

   

Hoot J

sensor

 

eee TL tes

[oss +

YS ty ateren
iene fo Kitehe
eens P07 Lundy

a ~ a

nnn Cold water inlet

 

 

‘Sate troy J

 

 

a — Tempered bathrooms

25

 

8:

 

 

 

 

 

   

 

 

 

 

L

SIDE ELEVATION

#100
Underweir
Bottle

780

Pp

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

RAP_DETAIL WITH TRI £
Gamal Description Date
Tea Notes Dae
Far Developrnent Approval
. or Bulling Appeaval | ® 1327-07
~. For tender
ye > For Construction
a Jas Constructed
Construction Hydraulic

   
  

email: [email protected] PH: S446 8645
nie conhyd.com

Fx: 5446 8224
CUENT

JOHN DEVITT

‘ARCHITECT =

PARISH CLARKE ARCHITECTS

PROJECT: ~PROPOSEOD DEVELOPMENT

LOT 29 VENTURA STREET
SUNRISE BEACH
ORAWING TITLE:

 

 

 
  

 

BASEMENT
HYDRAULIC SERVICES.

 

err] RK [ereaea]

 

[pete [ut=7-07_| Boo we

 

\._ sear s 11100

 

cum uno| 2 of # | 1682-2

 

(RPD:= Lot 29 on RP132534

 

 

 

 

 

Page 30

 

 

9800 Heavy

 

 

 

 

 

                             
                          

 
 

 

 

 

 

 

 

 

 

 

 

ee
cee a _ |
UPVC bolted SS SY
e 8
x & wal F
Sk 50 a
fe tray . Point OF F
rw Oe uae peneration 4 1050
ground osernent_wai} 3

 

 

 

 

 

 

 

(Provide
lconnection

 

 

 

 

CO/IO TO SURFACE % i

NTS 2100

0225

 

 

 

 

 

 

 
 

 

 

 

 

 

 

 

 

i 2100 #100, =
1. Ad pipework, 9100 unless noted otherwise
2. Ad Concrete surround grade N20 122.70 f O_n2z2.785
3. Provide the principal with accurate cecords q 122.700
‘of 4.0.9. locations upon completion. LE 5]
(257680 leew b
amok, eo? Retr 1882-3 |
o™ for conlinsation
f 122.300 i
i orep te Bos °
Harvesting
: tant below ;
Atlantis Cells
Coarte Aggregate oe Noss Cee
min exe GO 106mm ; ‘min Gomi
. Srapped in
non woven geotestie
9300 RCP i 400
30mm tong :

 

 

INSPECTION CHAMBER
DETAIL Scale 1:20

 

        

Pool backwash

  

model is

 

 

 

 

 

 

- Heat

 

 

 

 

 

 

 

Sauore
hinged).
SS £1004 Cl "cao
_———— rerera are Sha ser
, "oe
cant osuntment
om seh Ted or eoved surface

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

    

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   
  

 

 

 

 

 

      
       

  

 

 

  

 

 

 

 

  

 

 

 

           

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ROUND STORMW, i Ss] Membrane
lel uy SWIMMING BOOL SACKWASH RETAIL,
NIS
P| : ee ieee
1008 ale “
oe ° Ra
tL‘
cousin end Deeeapien baie
Hor hen @38 domesee |
Ecnsection,
few connection at the
Jewpense of Applicant.
Ties Dale
4 z T= 7=07
OFotyg.1e 2 TSOYA
4 ‘ i, JAs Constructed
Provide’ #78 connection a Sole .
te ey Be He \ . : ae
over ORG . at ‘A Construction Mydraulle
aa : pore ea
\\ $$$ —_____.
contact; Reinhold Koenning Mbsst REO No 7023
_ Height odjustment Po, Bon 1170
ome = wire Poi Erna re@contyd com Pi: Seas 9865
ee sae tiyd cae fhe sack sete
y ‘ CUENT =
4 wins JOHN DEVITT
TRCHITERT 7
g PARISH CLARKE ARCHITECTS.
5 PROT: PROPOSED DEVELOPMENT
‘ LOT 29. VENTURA STREET
wee UNRI ‘ACH
onpcisgs..__SRIEWEY RAD :
‘SPaRPEE ~ i C1804 or ae - DRAWING TITLE:
C180/1008 4 ao ie
t ’ tower’ body
sreembly
Sha ' GROUND
fet ere — ow 190 x HYDRAULIC SERVICES
\ TBO 100 1
wee Deson] RK [enectoa] [pete [11-7-07 | Dep Re.
SPS_225/150mm Round Floor/Promenade Drain ov arune| 3 of 4 | 1682-3

 

 

 

Rw Ss '

|

RPD:— Lot 29 on RP132534

 

 

Page 31

 

 

Pronde flashing 2 ares
wath 1% grade. nonce
to aide of »

      

 

Provide Toshing
with 1% grose
to side of porepet,

          

 

 

 

 

 

 

pe

 

RAINAGE

 

 

 

 

 

 

        

    

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

foot FUTURE OISCHAPGE
rene PIPE OIA,
eth 40
fn 40
Shr 50
we 100
i 3
By Sote 50
14 we Pwo f She we She _ewof | bevel 1 Sate ty 5
\ 100 under
\ \ SN ground
\ os
\ \ !
\' . \ A
\= VL! crn
ett . \
eee "7 \ uPVC
\ Bosement
issue. Hates, Dale
For Development Approval
er Building Approval |X 13-7-07
For Tender
ror Constniction
Root hs Constructea

 

 

 

 

 

 

 

    

 

 

 

 

 

 

   

 

 

20 ot ML Level 1
rr a
— eee els li | PH: $444 8645,
eet ee Lee FX, Saas p24
CUENT
Vv W, JOHN DEVITT
~ Ground ARCHITECT
= =) PSS - PARISH CLARKE ARCHITECTS
SS PROJECT: ~PROPOSEO_ DEVELOPMENT
LOT 29 VENTURA STREET
SUNRISE BEACH
a DRAWING THLE:
Bosement
LEVEL 1
HYDRAULIC SERVICES
ROOF PLAN
Rlecrds CIS seriea 2

Hien or equivalent

 

 

Teg he

SONE 1:10 ovaruno| 4 of 4 | 1682-4
RPD:- Lot 29 on RP132534

 

 

 

 

 

Page 32

 

    

  
        
   

 

 

 

 

 

   
   
    

 

 

 

 

 @eaessinun Uae a gre We —————___
Buller nal Hill Ne Te Ge tee “f
a “Oe. 16 23 54 11 SRE ln I Hi js ete! bine iat te A 233
sae PERE PERTE anpeereiey aecehag aes yuh Fiadletdeg gk? .
pu ee ae ER AE PHD go ac eS
| a alta Hane midge 2S =
: Trovagenuszzgaaeprggeazez* i HH i i il bat ve et i oO w&
OP sss apersennrctrg sae reat Hoe A iia Hap oS
so ST Hl pc mB By a Tf as Ss ie
iy ip opti ey Py, ao Hpi je ipa 4 BS
he ye ae pO EE OS Sty 2S
i : ‘
u i j if, . Gv)
ti a
eH tae
HE ip E-5 i 4 gg
4 Pro dd SI
[""s E | (Sr)
| . +
td _e ‘e
@ | ti | we
yj <1
; beimagd GI i le
gy Ly B= rel
i x |
ri
Ne N 5

 

 

 

 

 

 

 

 

 

 

‘sdaaepuny

 

enowedusy aN

¥-2991
£-Zs9l
2-Z89l
1-Z99b

SONIMVYC

 

 

eweez

 

 

 

 

 

 

 

 

 

yeG7oldy YO 6Z 107

  

 

 

 

 

 

%
Pras
GSES
| seks
ge SES
a Za8
gap ORE
13 R328
* gozg
3 B2Sm
’ SESH
2 ecRz
4 eclcr
aor
: q Wook
0 3
lay Ts FY i a,
aid Haya: vie 3n8
ith ee San gag
5 geo fluszlols lagaz if mime
53 RA 25ale |S i}: aa
& a: Z~9/2 | = he i a
” BR Beal Z z =
se eB giE |S Ree
aaeie |= ets 5 x
z Bois {a ys § pet td 8
&  |SSEIR “3 r 3
S15
Hl” | geld } i g
= RelA 2
a “EL BR a
g : .
L |e > EE ¢ fel FF
| Sz el

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 33

 

 

 

A et

 

 

 

 

Gosement
RL25.525

  

2 panes.

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

a

FRONT ELEVATION

CLEARMAKE GROSS POLLUIANT TRAP OfIAIL WITH TRENCH GRATE

. Senta 2e

 

 

 

 

 

 

 

 

 

 

 

 

 

3
SIDE ELEVATION

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

tr nanny. coe re bas tes
my Sas mate

 

JOHN DEVITE

BRT
PARISH CLARKE ARCHITECTS
(rR PROPOSED DEVELOPMENT
LOT 29 VENTURA STREET
SUNRISE BEACH

pene TE
BASEMENT
HYDRAULIC SERVICES

 

 

 

=
1682-2

 

 

 

 

 

 

 

Page 34

 

 

 

 

 

i

goa i

 

 

agarayey,
i

OBES:

i

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ie

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PARISH CLARKE ARCHITECTS

PRGREI: PROPOSED DEVELOPMENT
(OT 29 VENTURA STREET

 

 

 

 

 

 

 

 

f

 

 

 

 

re
1682-3

 

 

([RPD:— Lot 29 on RP1S2534

 

 

 

Page 35

 

 

 

: geet i

‘ageragey| 3]
a

 

 

a
i

i

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

Pre ee 845
Py, joes a2

 

 

 

PARISH CLARKE ARCHITECTS

 

 

F085: PROPOSED DEVELOPMENT
LOT 29 VENTURA STREET

 

f

 

 

 

 

U

 

 

 

 

 

Page 36

Ly Can
7 Ne “7 +1OHN09 THIRT
¥SOON

a’ SazgoSvar7y tO °- oo %)

      

‘ gong 190 2% oO on POA

~ cango3e

so WW eect
smoeyprecD _ pS or
“ypuse) warn, ~ a
APIO “7 ye

L@>-6 om e

Page 37

ee me ce

an 7 LAND USE SECTION FEES
<Ag NOOSA oe 7

RECEIPT TYPE

 

 

 

SALE OF DOCUMENTS .
Superseded Planning Scheme’Documentation . . 520
Copy of Permit/Approval Letter : 110
The Noosa Plan Documentation - . 111
APPLICATION FEES
Material Change of Use - Code/Impact ;
Consistent 521
Inconsistent 521
: Assessment under Superseded Planning Scheme . : . $21
Modification to a Development Permit m. . §21
Extension of a Currency Period . , 521
Operational Works - Landscaping / lo < §21
e Bldg Work assessable against the Planning Scheme : 521
PRE LODGEMENT REVIEW
Half Hour , . §22
One Hour : 522
ADVERTISING :
‘ Purchase Advertised Applications ~ §23
JETTIES © oo :
Jetty Application Fee . 524°
' Jetty Bond ‘ : 51
: (Category 4)
BONDS / /
Performance Bond : oo . : §1
. : . (Category 9)
SIGNS : . Lo
Registration Fee ‘ . : . 222
se@cu FEE .
Search of Land Use Section file 112
Liquor Licensing Request 113.
TOTAL. $ lo7

 

NAME: AL. Wee .
ADDRESS: 4- “T° Denn be
: : IibA TTA Conbcth. Se Ca plaett ACT Per

 

 

FILENO: © O7/ 2icrayp DATE: 2221e>
‘RECEIPT NO: / Sip Ql s Signature of TP Officer: £¢ faces

 

AUTHORITY NO:

4} das? roe (

Page 38

CALCULATION OF FEES

 

APPLICATION FEE . TOTAL
FEES

 

MCU - CODE ASSESSMENT
Details of Development

: Consistent 1.0°
Inconsistent 3.0

FEE CALCULATION |

 

MCU - IMPACT ASSESSMENT
Details of Development

Consistent 1.0
{Inconsistent 3.0

FEE CALCULATION

 

OPERATIONAL WORKS
Details of Development

’ |FEE CALCULATION

 

 

 

TOTAL FEES cs $

 

 

 

“Ly «th . . “a "

Page 39

Wane

90P'$334 LNSWdO T3ASC/SNOILNGILLNOD 8 SIA sAwaUUdoFaNSg PET

 

 

 

  

 

 

 

   

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

<
z TTYTT 3
sma Meee | sepeu Rasdous coneeon $ (spuog Buypnyauy) pred S024 40 [e301
(6 e0) 1S puog SHOM dvoouyeoue vay RVSOURULOVeR/]S04 Auroag
. . t9du91039y 10 SIOQUINN O14 [13 z
:u0}}2907 jueurdojeneg (spuog Bujpnoxa) Pied S804 Jo |e}0L
; 98S (dS) Aemped - So!
€8S p6S OSN UeYR pareja jou YH (dOINYWO) Peo - SO}
. 18g (aang PAM 8 19182/\ BII!NeSOON dS) aBeureG - SOI
‘ssoupPy 6s {S12d dSd) puey uojeaoay pue yods - SOI
soweN eeked |. v9 (48d) Aiddng 18} ~ $91
ut 7 SaIVLAG: NOLLWOlIddy;| 189 (Aypoorew dSd) uelbalag unos — eBesemag - $O|
€l9 (eiseo9 dSd) eBesames - SO}
su0}IeG/peoy LSS (1eany dd) eBesames - $9}
19s yodsued, o114Nd - SOI
syudWIYI;IeD 09S (angoe Aquauino jon) puey Ajunwwo0s - $9)
NOLLNSINLNOD:sHNOMaYvoN: 09S Ajjunuiwog pue syeg saIRO — UORNGLAUOD Jadojanag
9ss (Gupyed 129 ¢4dSd) Supe is uo nen Ui = “quyuOg Jadojaneq
{ uoZEINIjeD UO}dedsU] S89 dSd uey JauiO Aemujed — uonnqujuog Jadojaneq
¥GS dSd uey} JaujO aGeuresq — uo_NgiqUO|D Jedojenoq
€S¢ dSd welp JayIO peoy — uORNgUyLOD JadojeAeq
oss Gujdeospue) ~ UOANGIQUOD Jedojoneg
uopENsjes uoReuwexy weld [ada Ldiaday’ |” “ZLNNOWY:. 'SNOLLNGIULNOD?
6¢S 894 Supaayy juewabipo}-alg
88S uogsadsuy AL yINOWID Pesoig
BoHeMaIea 701 9¢S (som paje;dwooun ‘suognqujuo5) 624 ulwpy Buipuog
Shs: OS} 'SIST] Aoliog ‘squaLUNOG JO B/eS
tbs sjuawnoog [e637 ‘suejg Aaning - 904 Buea
ers uogeuluex3 Juaunoog je6e7
uogoedsu| pial4 eGeureig / peoy
wex3 ueig sbeureiq / peoy
$9eq uojeoddy

 

 

 

 

 

 

 
    

 

“(uowidojenag “1200 ujupy O} wneeeac “fe1yse9)
SNOILNGINLNOS 8 S334 LNAWdOWAAG

  

 

 

Used in these records

About this file

File size
3.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2104 - Operational Works - Landscaping, Access, Car Parking, Storm Water, Frontage Works, Excavation, Erosion & Sediment [As Published].pdf · 3.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.