This checklist should be used for any IDAS application. Please check each of the following items before accepting an
application at the counter.
1.1.1 Ensure that the form is fully completed.
1.1.2 Inthe case of an MCU or Op Works betow the high-water mark, owners consent is required.
4.1.2.1 If there are multiple owners, the consent of each owner is required.
1.1.2.2 If the owner of the land is a company, either ACN No. or Company Seal required.
1.2. Form1 Part B-O Supporting Information
1.1.2. Ensure that for each box checked on Form A, the retevant additional Forms 8-O are attached. L/]
4.1.2.1. Ensure that each of Forms B-O which are attached are fully completed. [J
en a [email protected] Ensure that items 1-23 have been checked and/or completed with regard to referrals.
SEENVIRONMENTALEY: ANTA
i ini ely ee
3.1 Ensure that Part G is completed if EPA referral is required.
Ise
Sanco
3.2 Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
fee is paid and recorded on the application.
452 FORNEZES REQUEST: 1 OICHANGE APRROVALINS a Wiener men nn PRaeE
4.1 Ensure that items 1-28 have been checked and/or completed including information regarding
applicant details and owners consent.
SAUNPEANS Nae SSE SENT aE oc ove e
5.14 Ensure that at least 6 sets of the Plan of Development (5 for Reconfiguration and Operational
Works) accompanies the application. In addition ensure that each set is complete.
5.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and.is
unbound, .
‘SEE SUPRORTINGINEORMAT. SRY
6.1 ‘Ensure that at least 6 copies of any report accompanies the application (5 for Reconfiguration -
and Operational Works). If the application is accompanied by a covering letter, ensure that it is ~
e@ capable of reproduction. [A]
6.2 In the case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound. =
SRE ee nee
7.1 Ensure that the application fee, as determined from the Council's adopted scale of fees,
accompanies the application or has been paid.
7.2. Ensure that the fee which has been paid is recorded on the application form.
Receiving Officer LS beens SQ osetemer- De eeeceeceeenneneee Date ..... ie(ie(e} heveerseenee
Having completed this form and accepted the Bbicaton please deliver both to the following IDAS Application Receiving
trays:- . .
«Ifthe application is for a Material Change of Use exclusively -AOP1’s desk in the Land Use Section.
«Ifthe application is for an Material Change of Use & Reconfiguration - AOP1's desk in the Land Use Section.
«Ifthe application is for Operational Works (for parking, access, sewerage or drainage) exclusively - AOD2 in the
Land Development Section.
« = Inall other circumstances - AOP1’s desk in the Land Use Section.
Please DO NOT leave the application at the counter and DO NOT deliver the application to Records.
SEP] g:\ant\forms\application checklist.doc
NOOSA Checklist - Applications Involving Land —— Fe ere
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2104 - Operational Works - Landscaping, Access, Car Parking, Storm Water, Frontage Works, Excavation, Erosion & Sediment [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.