07/2104 - Operational Works - Landscaping, Access, Car Parking, Storm Water, Frontage Works, Excavation, Erosion & Sediment [As Published] · 142007.2104
INTEGRATED PLANNING ACT 1997
Devefopment within the limits of a
“port
For more information refer to Guide 18. For
information about prescribed tidal work refer to
Guide 24.
you answered "YES" to Q12, the application
triggers referrat to the Port Authigity, .
“e Within 1000m ofa swing ba sin, a commercial
‘shipping whart, a mooring, anchorage’ of see
ds; -
“identified iri'a land use plan j
the Transport Infrastructure’ Act 1994,
‘In all other situation the Port Authority is an
advice: agency.
IDAS Assessment Checklist, Version 20, 2 April 2007
Does the application involve development below-high-water-mark'® and within the limits of poff ~
under the Transport Infrastructure Act 1994?
[XI No .
(YES - complete Part M of Form 1, or Part P of Form 4 if the work is prescribed tidal work
jarinas -
For-moré information refer to‘ Guide 18. For
information’ ‘about’ whether a marina is presciibed
. 4,
: Tidal worksiin strategie er lene ie
* areas.
Port ‘Authority is the assessment { manager for the
“dopication and the Environmental Protection’ -
‘Agency (EPA) and Queensland Transport (QT)
ae concurrence agenties for the application.
Heritage
For further information refer.to Guide 19.
~ Ifyou answered "YES" to Q15, the application
triggers réferral to the Queensland Heritage
Council as concurrence agency for the
application.
“Unless you answered “none of the above" to
Q15(b), the application involves feferral to the
Environmental Protection Agency as an-advice
agency for the application .
13.
15.
Does the application involve’ operational w work t that i is tidal. work fora marina with more than 6.
- vessel berths?
DANO
oO YES - complete Part M of Form 1, or Part P of Form 1 if the tidal work is prescribed tidal work
Does the application involve tidal works within a strategic nor iand tidal areat®?
Kno
(1 YES - complete Part M of Fonn 1°
Does the application involve development ina heritage registered place as defined under the ~ '
Queensland Heritage Act 1992?
i NO .
(YES - complete Part C of Form 1
15(b)The application involves: (tick applicable boxes)
[1 (i) amaterial change of use assessable against the planning scheme and the lot shares a
common boundary with a protected area or registered place under the Queensland
. Heritage Act 1992;
O(ii) — reconfi iguring a lot if the lot shares a common boundary with a protected area or
registered place under the Queensland Heritage Act 1992;
none of the above.
Wi)
Declared catchment areas
For more information, inctuding a list of the
dectared catchment areas within Queensland,
refer to Guide 13.
Unless you answered “none of the above” to
Q16, the application requires assessment by the
Department of Natural Resources and Water
(NRW).
if an.agency other than NRW is the assessment
“manager for the application, NRW is a
concurrence agency for the appkication | in
telation to this matter.
16.
The application is in an area declared to be a catchment area under the Water Act 2000 and
involves: (tick the applicable box/es)
O (i) reconfiguring a lot if any lot resulting from the reconfiguration is less than 16 hectares;
Ci(ii) development assessable against the planning scheme involving the establishment or
expansion of a waste water disposal system, other than a disposal system for carrying
out an environmentally relevant activity under the Environmental Protection Act 1994;
none of the above
& ii)
18 High water mark-is defined in the Coastal Protection and Management Act 1995 and means the ordinary high water mark at spring tide,
19 Marina is defined in the Transport Operations (Maritime Pollution} Regislation 1995.
20 Strategic port land tidal areas are the areas generally 50 metres seaward of high water mark adjacent to strategic port land.
Page 5.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2104 - Operational Works - Landscaping, Access, Car Parking, Storm Water, Frontage Works, Excavation, Erosion & Sediment [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.