07/2104 - Operational Works - Landscaping, Access, Car Parking, Storm Water, Frontage Works, Excavation, Erosion & Sediment [As Published] · 142007.2104

of 39

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997
Contaminated-land’ .

“Applications involving material change of use
and/ or reconfiguring.a lot may biggerthis
referral,

‘For more information refer to Guide 5.
Untess you answered “none of the above" to
~ Q17, the application requires. assessment by:

Environmental Protection Agency (EPA). Han,
-agency other than EPA
manager-fo for the ‘applica
-Concurrence agency. for.
relation to this matter.

 
 
 
    

application in:

 

 

 

ot . .
IDAS Assessment Checklist, Version 20; 2 April 2007. +

17. The application involves: (tick the applicable bowes)

CJ (i) reconfiguring a lot for which all of part of the premises are -
(a) premises mentioned in the IPA, schedule 8, part 1, table 2 - .
« item 5, including the exemption otherwise provided for by paragraph (d); *
« item 6, including the exemption otherwise provided for by paragraph (e); or.
* item 7, including the exemption otherwise provided for a mining activity or petroleum \
activity; or
{b) in an area for which an area management advice has been given for unexploded
ordnance - complete Part N of Form 1

Oiii) a material change of use ~
(a) ‘made assessable under the IPA, schedule 8, part 1, table 2, items 5 to 7; or
(b) assessable against the planning scheme and if all or part of the premises is in an area
for which an area management advice has been given for unexploded ordnance -
complete Part N of Form 1 .

pd (ii) none of the above

 

‘Remusior

 

  

 

Te The application involves: (tick the applicable owes)

C1 (i) reconfiguring a fot where any part of the lot is -

* subject to an easement in favour of a distribution entity or transmission entity under the
Electricity Act 1994 and the easement is for a transmission grid or supply network under
that Act; or

« situated within 100m of a substation site;

Ci (ii) a material change of use, assessable against a planning scheme and not associated
. with reconfiguring a lot if -
. « any part of the premises is subject to an easement in favour of a-distribution entity or
‘ ___, transmission entity under the Electricity Act 1994 and the easement is fora transmission
"grid or supply network under that Act; and
any structure or work that is thie natural and ordinary consequence of the use is, or will be,
. located wholly or partly in the easement;

C1 (ili) a material change of use, assessable against a planning scheme and not associated
with reconfi iguring a tot if any part of the premises is situated within 100m of a substation
site;

* C1 (iv) operational work that is filing or excavation assessable against the planning scheme,
not associated with reconfiguring a tot, if -

« any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the work is located wholly or partly in
the easement;

e the work is located wholly or partly within 10m of a substation site;

(XJ (v) none of the above.

 

Land designated 'for-commuinity

infrastructure .

Applications involving development on {and

designated for.community infrastructure may
+ trigger this referral, .

For more information refer to schedule 2 of the

{P Regutation,
- {fyou answered “YES" to Q19, the application

Tequires assessment by the chief executive of |.
ing

the.department administering the Act authorisi
the development for the designated purpose.

If an agency other than the designator i isthe «

assessment manager for the application, sthe ”

designating agency-will be-a concurrence |
agency for the application in-relation to this
matter.

19." Does the application involve development assessable against the planning scheme-and on ng
designated for community infrastructure?

(i) intended to be supplied by a public sector entity; and
(ii) on land not owned by or on behalf of the State; and
(iii) other than development -

(a) for the designated purpose; or

(b) carried out by, or on behalf of, the designator.
x No ,
Cyes

4

 

 

™

.

 

 

Used in these records

About this file

File size
3.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2104 - Operational Works - Landscaping, Access, Car Parking, Storm Water, Frontage Works, Excavation, Erosion & Sediment [As Published].pdf · 3.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.