Skip to the record
The gold standard in government transparency.

Council archive · source document

07/2104 - Operational Works - Landscaping, Access, Car Parking, Storm Water, Frontage Works, Excavation, Erosion & Sediment [As Published] · 142007.2104

of 39

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 4997

Part A, Version 2.4, 29 May 2006

 

Land owner's consent {if.appiicable) -
Section 3.2.1(3) of the IPA prescribes that an.

- lawritfen consent of the land owners, Hie gpptcaton =
involves:

fi) ‘a mater change of use;

(®)- réconfiguration of a lot;

@ work on land below high-water mark & not within a

Management Act 1995;0r
(iv) work on tall corridor land dafined under the
Transport Infrastructure Act 1994.
"Section 3.8.1(2}(a} of the PA provides that
landowner's consent is pot required for a mobile or
| Semporary ERA .

[For more information refer to Guide 1,

canal as defined under the Coastal Protection and

application must contain, or be supported by, the oc]

 

Name .

“1/20. ‘Land owner's consent to the making-of this application:

. Signature

 

 

 

 

 

we

 

 

 

 

Resource entitlement (if applicable)
Section 3.2.1(5) of the IPA requires evidence of
‘resourre entitement be given for applications that
involve a prescribed State resource.

Section 3.2.1(10)(a)(il) of the IPA prescribes that an

‘application cannot be taken to be properly made
without evidence of the resource entitlement.

Advice for completing 021 & 22
Refer to schedule 10 of the integrated Planning

‘required by the State in support of the lodging of bis
development application. .

}
| Advice for completing Q23

' The information in (i) - (v} is mandatory if evidence is
required under Q22 (ii) or (ii) above.

(The officlal stamp of the Department of Natural

+ Resources, Mines and Water is mandatory where the
application involves any water or riverine quarry
"material under the Water Act 2000.

Section 3.2.1(5A) allows the resource manager to limit
tthe time the evidence may be used. 023 (vi) must be
{completed if the evidence is time limited.

t .

t

 

weyers

21,

t Regulation 1998 that prescribes the nature of evidence| _

23.

 

uiamy material on State coastal land under the Coastal Protection and Management Act ‘9?

FEILNO - goto. 024

>to Q23

LC (ili) the chief.executive of the department administering the resource is satisfied. the
roceed in the absence of an allocation of,or ..

development application mai

This ‘application i is accompanied by evidence: (ick applicable box)

Oi) the chief executive of the departmenit administering | the. recaicéis
development is consistent with.an allocation of, or entittement

 

entitlement to, the resource — go to 023

Evidence of the resource entitlement:

(i) Resource entitlement / spat details

(ii) Name of delegated officer’. -_

(ii) Position of delegated officer

" (iv) Signature of delegated officer

 

 

 

 

(v) . Date

[1 Yes: “goto 022 CO,

   

t

   
     

 

(vii) Officia tamp of. the: department

  

applicable) .

 

 

 

 

 

| Assessment triggers

 

24. Is

   

 

This checklist does not apply the application requies} AZ] VEG”
the completion of Parts A and 8 of the Form only. It .

must be completed for all other applications. .

Plans | drawings / reports 25. ‘Plans/drawings/reports Rampant this aophcatan

‘An application should be accompanied by details to
support the proposal & enable the assessment
manager, referral agencies and any person viewing”
the application during public scrutiny or public
"notification to understand the Scope of the proposal
i end any Potential impact +

 

 

 

 

 

 

 

 

 

 

Plan / Drawing / Report Number Title Date
 Lastoseahe od Lavoscale Mls
W) Becass a laeviac BasesavC Cau.
Li Seu ware Phaswage | Heretic Seovices rata
LW hontace/enosintt Semen St Lass

 

PLEASE NOTE: The assessment manager may refuse to accept an application that;at the time of lodgement, fails to provide all applicable information required by Part A
and any other relevant part of Form 1.

 

OFFICE USE ONLY (applicable to assessment manager's)

 

 

 

 

 

 

* 3. DATE
[Fee ) 269 2 RECEIVED, © | Sheofo? [
Notification of. Engagement of Private Certifi ier (Optional toma” .
To, Council. | have been engaged as the private certifier for the building work referred to in this application.

Date ofengagement / /

Accreditation Number.

Name:

Signature:

 

 

 

Used in these records

About this file

File size
3.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2104 - Operational Works - Landscaping, Access, Car Parking, Storm Water, Frontage Works, Excavation, Erosion & Sediment [As Published].pdf · 3.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.