Council archive · source document
07/2104 - Operational Works - Landscaping, Access, Car Parking, Storm Water, Frontage Works, Excavation, Erosion & Sediment [As Published] · 142007.2104
INTEGRATED PLANNING ACT 1997 . ~ Part E, Version 2.1, 18 June 2007
~~ Form 1 eee aaa
Operational &/or building work ts|
assessable against a local government’s planning scheme
” Completion of all question on Part E is mandatory for all applications involving the assessment of operational work and/or building work assessable
- against a focal govemmment's planning scheme (including detailed engineering plans and other plans, detailed engineering plans for subdivisional works and conceptual
design plans for engineering & buking work when the application does nel involve assessment of e materiel change of use of premises atthe same tine).
Nature of the works 1. The application is seeking approval of (tick one (1) or both if applicable):
The types of work that are assessable against LO Building work assessable against a planning scheme - - provide detads ofthe aspects ofbuliding
a planning scheme are determined by the.
for a particular local ment and | work (6.9. busing height greter then 8.5m buiing work on high ands sk ered)
will vary across the State. . _ | .
To determine the types of work that are [Operational work.assessable against a planning scheme = provide details of the nature of the
assessable under a particular planning - Operational work (a9. rosdworks; landscaping: drainage works; stomnwater, water infrastructure; sewerage
scheme, contact he relevant loca infrastructure; earthworks; clearing vegetation; signage)
The information in Q2 fs necessary for | - :
Statistical and planning purposes. 2. Is the application for operational work involving the creation of new lots?
NO . [J YES - specity number of new lots to be created below
fo
"13, -Does the proposal involve the construction of'a canal that is associated with reconfiguring a lot?
No Lives
Nature of the application 4. This application | is for: (ik one (1) or bof eppicale)
A development permit authorises
development to occur, while a pretiinary oO Preliminary approval - provide detats oft type of work eg. roadwork, stormwater, weter end sewerage
- approval is a step in the approval process - -
"and does not authorise development to oocur.| | ; : }
O Development permit - Provide deteis ofthe type of work eg. roadwork ‘Stomnwater, water end sewerage
infrastructure, etc _-
7
5. -Are the works subsequent toa previous development permit or preliminary approval?
@ . oO NO YES - = provide details of al pravious approvals
: : . =alList of approval referencals.. 2 = Date approved <. (Date approval pses 7
2005/2302 3B} 1S 12007 By 1S 120ft
-: Portable Long Service Leave levy (it. |6. Is paymentofa Portable Long Service Leave (PLS) levy applicable to the proposal?
~ spplicable) BRL YES - complete a7
"Prior to issuing a development pert for the
; worl, the pacedoment manager equi [LINO -07,8&9¢0not apply .
* “by Jaw to “sight” an approved form, issued by -
“.Qheave, which signifies that the PLSL levy |7. Has the PLSL levy been paid?
“has been paid. . .
For reterto LL YES ~ complete a8
| hitpviwww oleave ald.gov.au A NO- ihe eppfcable ey must be pai before a core permit can be given for the works
8. How much was paid? - . oe
9. Whatis the receipt number of the payment? ,
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2104 - Operational Works - Landscaping, Access, Car Parking, Storm Water, Frontage Works, Excavation, Erosion & Sediment [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.