Skip to the record
The gold standard in government transparency.

Original source · versioned page text

Appendix E - State Code 1 Template Response

Attached to the e-mail Commercial Business Type 2 Medical (Doctor's Practice) - MCU18/0195.

of 19
 Performance outcomes                                      Acceptable outcomes                                   Response
                                                           AND
                                                           AO32.5 Land is able to be reinstated to the pre-      Not Applicable
                                                           development condition at the completion of the
                                                           use.
 PO33 Vehicular access to a future state-                  AO33.1 Development does not require new or            Complies with AO33.1
 controlled road is located and designed to not            changed access between the premises and a             No changes to access are proposed
 create a safety hazard for users of a future state-       future state-controlled road.
 controlled road or result in a worsening of               AND
 operating conditions on a future state-controlled         AO33.2 Vehicular access for the development is        Complies with AO33.2
 road.                                                     consistent with the function and design of the        No changes to access are proposed
                                                           future state-controlled road.
 Note: Where a new or changed access between the
 premises and a future state-controlled road is
 proposed, the Department of Transport and Main
 Roads will need to assess the proposal to determine
 if the vehicular access for the development is safe. An
 assessment can be made by Department of Transport
 and Main Roads as part of the development
 assessment process and a decision under section 62
 of Transport Infrastructure Act 1994 issued where
 sufficient information is provided.
 PO34 Filling, excavation, building foundations            No acceptable outcome is prescribed.                  Complies with PO34
 and retaining structures do not undermine, or                                                                   No changes to access are proposed
 cause subsidence of, a future state-controlled
 road.

 Note: To demonstrate compliance with this
 performance outcome, it is recommended that an
 RPEQ certified geotechnical assessment is provided,
 prepared in accordance with volume 3 of the Road
 planning and design manual, 2nd edition, Department
 of Transport and Main Roads, 2016.
 PO35 Fill material from a development site does           AO35.1 Fill material is free of contaminants          Not Applicable – no filling is required or
 not result in contamination of land for a future          including acid sulfate content.                       proposed
 state-controlled road.
                                                           Note: Soil and rocks should be tested in accordance

State Development Assessment Provisions – version 2.0
State code 1: Development in a state-controlled road environment                                                                               Page 18 of 19

Log in to download the original (Appendix E - State Code 1 Template Response.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.