2. Project Hazard/Risk Register
The Project Hazard / Risk Register is a generic document that is amended according to the site-specific health
and safety requirements of each construction project. This document will also take into consideration Hazards
and Risks relating Environmental Management and Emergency Response and Preparedness.
The Project Hazard / Risk Register will be referenced during the Project Start Up Meeting and the site-specific
hazards identified including all Health-related hazards that may require health monitoring in line with WC
Health Monitoring Program OHS 036 and any additional considerations during the construction phase.
A copy of the Project Hazard / Risk Register will be sent to all Contract Partners prior to them mobilising to site
for their review. All workers will be informed of the contents of the WHS Management Plan, Environmental
Management Plan. EPARP and Hazard Risk Register during their site-specific induction. All amendments to the
plan, during the project construction, shall be communicated to all workers at the next available Pre-start
Meeting.
A review of the Project Hazard / Risk Register will be conducted by the respective Regional HSE Coordinator /
HSE Advisor with BSBWHS414 OHS Cert 4 when conducting a Monthly Site Audit. The Site Review will be
conducted at least six (6) times during a calendar year and will be recorded in Procore utilising the Site Audit
Checklist.
Amendments to the Project Hazard Risk Register including all relevant details will be recorded on the revision
history section of the document.
The site-specific Project Hazard / Risk Register will be printed and stored onsite in a separate folder in A3
format to be referenced by all site personnel.
See Appendix 1 for a copy of the current Project Hazard/Risk Register.
2.1 Supporting Documents
Document Title Category Relevance
WC OHS 060 – Critical Incident / Exposure Procedure Procedure Rehabilitation and Return to Work
WC OHS 052 - Rehabilitation Policy Rehabilitation
WC OHS 060 - Critical Incident / Exposed Worker Procedure Critical Incident
WC ENV 015 - Cyclone Management Plan High Winds and Cyclone
0212 - 15 - Emergency Evacuation Drill Form Emergency Evacuation Drill
Cyclone Management Plan Plan Cyclone preparation
COVID-19 WHS Risk Assessment and Safe Workplace P Plan COVID-19 Assessment and preparation
Mobile Plant Checklist Checklist Plant Management
Work Health and Safety Management Plan Plan WHS management document
Environmental Management Plan Plan Environmental Management Document
SWMS Review Checklist Inspection Review SWMS compliance
Excavation Permit Permit Managing Excavation works
Hot Works Permit Permit Managing Hot Works
Working at Heights Permit Permit Managing Working at Heights
Confined Space Permit Permit Managing Confined Space
Weekly HSE Inspection Inspection Monitoring / Review
Safety Interaction Inspection Monitoring / Review
Monthly Audit Inspection Monitoring / Review
Scaffold Inspection Inspection Monitoring / Review
Procore Inspection Matrix Procedure Monitoring / Review Procedure
Project Prestart Agenda Form Meeting Records
Project Prestart Minutes Form Meeting Records
WHS Management Plan / Page 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHS Management Plan Ozcare Noosa RACF WC OHS 002 Rev 23 4 July 2023 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.