Skip to the record
Search everything, all in one place.

Council archive · source document

WHS Management Plan Ozcare Noosa RACF WC OHS 002 Rev 23 4 July 2023 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy · OPW24/0118

of 62

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
 Site Equipment / Testing Register                       Register               Maintaining Records




3. Risk Assessment
The hazards and risks related to projects undertaken by Woollam will be assessed by the Project Manager or
their delegate in conjunction with the Regional HSE Coordinator or their delegate and recorded in Section 2
Project Hazard / Risk Register of the WHS Management Plan for each Project. The WHS Management Manual
will also identify legislative criteria relevant to the hazards and risks and relevant to the State in which the
project is located.
If required, the Site Manager, in consultation with the Regional HSE Coordinator, shall conduct a formal risk
assessment of any task, and shall record the results on a Risk Assessment. When conducting this risk
assessment, it will take in the likelihood and consequence of injury, illness and injury occurring and reference
any available information on the hazard including records of incidents, illnesses, and disease. Some reference
areas would include the safety statistics spreadsheets on the server and relevant authorities’ websites.
Identified risks will be reduced to So Far as Reasonably Practicable (SFARP) by the application of control
measures.
SFARP should not be above Moderate.
In the event of a task having a level of risk, where no matter what controls are put in place, it remains a High
Risk, practical risk control priorities such as, Work Permits, increased inspections or supervision will be
implemented.
Recommended control measures identified from the Risk Assessment, will be implemented in the form of Safe
Work Method Statements.




                                                                                    WHS Management Plan / Page 12

Used in these records

About this file

File size
1.3 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHS Management Plan Ozcare Noosa RACF WC OHS 002 Rev 23 4 July 2023 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads -.pdf · 1.3 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.