4. Safe Work Method Statement
Register
The following is a list of Woollam Constructions’ Safe Work Method Statements. A cross in the corresponding
box will indicate it is required on this particular project:
High Risk Construction Work
Req’d SWMS Req’d
SWMS
Confined Spaces Refuelling Plant and Equipment
Control of Exposure to RCS Traffic Control
Demolition and Structural Alteration
Telehandler Operation
Work
Elevated Work Platform Operation Working at Heights
Trenching and Excavation Working Near Overhead Power Lines
Forklift Operation Man and Material Hoist Operation
Hazardous Substance and Dangerous
General Site Works
Goods
Mobile Scaffold General Internal Carpentry
Working with or Around Mobile Plant General External Carpentry
Precast and Tilt Panel Erection General Concrete Works
All Safe Work Method Statements submitted by Contract Partners shall be reviewed by Woollam Constructions
for adequacy and recorded on the online Safe Work Method Statement Checklist. A completed copy of the
Safe Work Method Statement Checklist will be kept electronically as evidence of review.
If there are deficiencies listed on the Safe Work Method Statement Checklist, the Safe Work Method
Statement shall be returned to the Contract Partner, and the Contract Partner shall make the required changes
to the Safe Work Method Statement prior to commencing work.
Any alterations or amendments to a Safe Work Method Statement must be communicated to the relevant
employees by Woollam Constructions or the relevant Contract Partner via a Daily Prestart Meeting and
recorded on the relevant SWMS and Daily Prestart Talk form.
A review of the Contract Partner SWMS shall be facilitated by the Site Manager and or the Site HSE Adviser
with the respective Contract Partner every 3 months, should that Contract Partner still be on the project.
Contract Partner’s SWMS will be filed either in hard copy on site, electronically in the relevant project online
portal or both. In the event of a notifiable incident, then this WHSMP, and any relevant SWMS, will be retained
for a minimum period of two years.
WHS Management Plan / Page 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHS Management Plan Ozcare Noosa RACF WC OHS 002 Rev 23 4 July 2023 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.