• All contract partners to provide certification and Calibrations records to the Site Manager or HSE
representative upon starting on any Woollam project. These records need to include when equipment
was first tested and the frequency that calibration / testing needs to be conducted, who has
conducted the testing and their registered qualification to conduct said product.
• All Woollam equipment requiring certification / calibrating are to be recorded om WC OHS 095 Site
Equipment register and maintained as per manufacturing specs and products Australian Standards.
WHS Management Plan / Page 21
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHS Management Plan Ozcare Noosa RACF WC OHS 002 Rev 23 4 July 2023 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.