6. Common Plant and Equipment
Common Plant and Equipment is plant or equipment that is provided by the Principal Contractor for use by
workers at a workplace.
The use of common plant is only for workers that are appropriately competent for the relevant plant. The user
of the plant must provide evidence of competence before operating the plant.
All plant must be maintained, inspected, checked and records kept according to the following register.
Plant found to be unsafe must be marked as “locked out” according to the process in Section 30.1 Electrical
Lock Out. All unsafe plant must be reported to the Site Manager immediately to arrange for repairs.
All Emergency Equipment identified in the Emergency Preparedness and Response Plan should be added to
the Site Equipment / Testing Register.
Equipment to be reviewed on a weekly basis as part of the mandatory Procore auditing schedule.
                                     Common Plant Inspection and Servicing Requirements
Plant Type                       Plant Type                    Plant Type            Plant Type
Anchor/attachment points         Height Safety Inspector -     AS/NZS 1891.4,        Yearly
(fall arrest//restraint)         MEM15004B, RB, RI, RA or      AS1891.2
                                 Engineer
Construction wiring              Licensed Electrician          AS3012                Upon installation,
                                                                                     then every 6 months
Electrical Equipment             Licensed Electrician /        AS 3000               3 monthly, 3 monthly RCD
                                 Competent Person              AS 3012               calibrations. Independent
                                 (UEENEEP026)                                        inspection at least once in the
                                                                                     duration of the project
Fire Extinguishers               Competent Person              AS 1851               Regular inspection,
                                 (CPPFES2021A)                                       6 monthly tests (if not disposable)
Formwork                         Engineer with relevant        AS 3610               Engineers Certificate prior to a pour
                                 experience
Lifting gear – alloy chains      Licensed crane operator,      AS3775.1              01 - 05 lift cycles per week - 12
                                 dogman or rigger                                    monthly 06 - 25 lift cycles per week
                                                                                     - 6 monthly 26 - 200 lift cycles per
                                                                                     week - 3 monthly 201 plus lift
                                                                                     cycles per week - monthly
Lifting gear – round & flat      Licensed crane operator,      AS4497.1,             3 monthly, yearly
slings                           dogman or rigger              AS1353.1
Lifting gear – lifting devices   Licensed crane operator,      AS4991                12 monthly
                                 dogman or rigger



6.1 Supporting Documents
     •    WC OHS 095 Site Equipment / Testing Register




                                                                                    WHS Management Plan / Page 22

Used in these records

About this file

File size
1.3 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHS Management Plan Ozcare Noosa RACF WC OHS 002 Rev 23 4 July 2023 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads -.pdf · 1.3 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.