Skip to the record
Accept no substitutions.

Council archive · source document

WHS Management Plan Ozcare Noosa RACF WC OHS 002 Rev 23 4 July 2023 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy · OPW24/0118

of 62

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
             Activity                        Responsible Person             Type of action and records
people who may work on or visit the     Site HSE Adviser -                  •   Site Safety Rules displayed in a
site.                                   HSEQT Manager -                         prominent position on site (site
                                                                                office and lunchroom)
                                                                            •   Discussed during Site Specific
                                                                                Induction
                                                                            •   Establishment of OH&S
                                                                                Workplace Committee (if
Managing communication between          Site Manager -
                                                                                requested)
OH&S Workplace Committee (where         Site HSE Adviser -
                                                                            •   Minutes of OH&S Workplace
applicable).
                                                                                Committee Meetings
                                                                            •   Toolbox Talks
Providing the Woollam Cwith the         Contracts Administrator / Project   •   Supplied to Contract Partners
WHS Management Plan.                    Manager –                               during the letting of contracts.
                                                                            •   Site Manager will make
Preparing, maintaining and making                                               accessible in the site office.
                                        Site Manager -
accessible the register of hazardous                                        •   Administration prepares and
substances.                             Site HSE Adviser -
                                                                                updates in conjunction with
                                                                                site foreman.
                                                                            •   Submissions of SWMS are
                                                                                checked for current training
Ensuring that before starting work                                              history.
                                        Site Manager -
on site all personnel attend suitable                                       •   Copies of general induction
                                        Site HSE Adviser -
induction training courses.                                                     cards taken during induction
                                                                            •   On site induction process
                                                                                requires proof of training
                                                                            •   Incidents are to be investigated
                                        Site Manager -                          and recorded on the Incident
Incident Reporting.                                                             Investigation Report and
                                        Site HSE Adviser -
                                                                                notification as per the Incident
                                                                                Notification Flowchart.

                                        Site Manager –                      •   The work site is to be secured
Site Access and Egress.                                                         and safe access and egress is to
                                        Site HSE Adviser -
                                                                                be developed and maintained

                                                                            •   Copies of SWMS, Induction,
                                                                                accident reports etc are kept on
                                        Site Manager -                          site.
Keeping OHS Records.                    Office Administrator –              •   On completion of Project, OHS
                                        Site HSE Adviser –                      Records are archived as per
                                                                                Records Management
                                                                                Procedure


                                        Project Manager –                   •   Identify and document health
                                                                                hazards and risks for individual
                                        Site Manager -                          project by using the Project
                                                                                Health Risk Assessment and
                                        Site HSE Adviser -
                                                                                discuss at Project Start-up
Health Surveillance and Exposure
                                        HSEQT Manager –                         Meeting
Monitoring
                                                                            •   Amend the WHS Management
                                        Formally Trained Health                 Plan according to the Risk
                                        Professional                            Assessment
                                        Formally Trained Health             •   Communicate the Health
                                        Professional / Occupational             Surveillance Program at Site
                                        Hygienist                               Inductions for Woollam



                                                                                WHS Management Plan / Page 45

Used in these records

About this file

File size
1.3 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHS Management Plan Ozcare Noosa RACF WC OHS 002 Rev 23 4 July 2023 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads -.pdf · 1.3 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.