Council archive · source document
WHS Management Plan Ozcare Noosa RACF WC OHS 002 Rev 23 4 July 2023 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy · OPW24/0118
Plans and drawings: the text below has words only, no drawings.
Activity Responsible Person Type of action and records
people who may work on or visit the Site HSE Adviser - • Site Safety Rules displayed in a
site. HSEQT Manager - prominent position on site (site
office and lunchroom)
• Discussed during Site Specific
Induction
• Establishment of OH&S
Workplace Committee (if
Managing communication between Site Manager -
requested)
OH&S Workplace Committee (where Site HSE Adviser -
• Minutes of OH&S Workplace
applicable).
Committee Meetings
• Toolbox Talks
Providing the Woollam Cwith the Contracts Administrator / Project • Supplied to Contract Partners
WHS Management Plan. Manager – during the letting of contracts.
• Site Manager will make
Preparing, maintaining and making accessible in the site office.
Site Manager -
accessible the register of hazardous • Administration prepares and
substances. Site HSE Adviser -
updates in conjunction with
site foreman.
• Submissions of SWMS are
checked for current training
Ensuring that before starting work history.
Site Manager -
on site all personnel attend suitable • Copies of general induction
Site HSE Adviser -
induction training courses. cards taken during induction
• On site induction process
requires proof of training
• Incidents are to be investigated
Site Manager - and recorded on the Incident
Incident Reporting. Investigation Report and
Site HSE Adviser -
notification as per the Incident
Notification Flowchart.
Site Manager – • The work site is to be secured
Site Access and Egress. and safe access and egress is to
Site HSE Adviser -
be developed and maintained
• Copies of SWMS, Induction,
accident reports etc are kept on
Site Manager - site.
Keeping OHS Records. Office Administrator – • On completion of Project, OHS
Site HSE Adviser – Records are archived as per
Records Management
Procedure
Project Manager – • Identify and document health
hazards and risks for individual
Site Manager - project by using the Project
Health Risk Assessment and
Site HSE Adviser -
discuss at Project Start-up
Health Surveillance and Exposure
HSEQT Manager – Meeting
Monitoring
• Amend the WHS Management
Formally Trained Health Plan according to the Risk
Professional Assessment
Formally Trained Health • Communicate the Health
Professional / Occupational Surveillance Program at Site
Hygienist Inductions for Woollam
WHS Management Plan / Page 45
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHS Management Plan Ozcare Noosa RACF WC OHS 002 Rev 23 4 July 2023 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.