25. Statement of Responsibilities
Activity Responsible Person Type of action and records
Project Manager – • Hazard Risk Register in WHS
Hazard identification, assessment Site Manager – Management Plan
and control. Site HSE Adviser – • Project Health Risk Assessment
HSEQT Manager – • Hazard Report
Project Manager – • Surveillance
Compliance with State Legislation, Site Manager - • Task Observation
Appropriate Standards, Codes of
Practice and Site Safety Rules. Site HSE Adviser – • Safety Interactions
HSEQT Manager –
• Review of Contract Partner’s
Safe Work Method Statements
Project Manager –
Assessment of Contract Partners • Task Observations and Safety
Site Manager -
OHS capabilities and performance Interactions
on the job. Site HSE Adviser –
• Site Audits
HSEQT Manager –
• Contract Partner Tender
Interview
• Register of Injuries
Workplace injury management and HSEQT Manager – • Medical Certificates and
rehabilitation. Workers’ Compensation
HSE Adviser –
documents will be held at
Regional Office
• Site induction for all employees
and Contract Partners
Project Manager –
Consult and Communicate OHS&R • Toolbox talks and Daily Pre-
Site Manager –
information to all site personnel in start meetings.
the lead up to and during project. Site HSE Adviser -
• Safety Alerts
HSEQT Manager -
• WHS Management Plan sent to
Contract Partners
Provide general construction, work Site Manager - • Site induction for all Woollam
activity and site-specific induction Constructions’ employees and
training to all site personnel. Site HSE Adviser -
Contract Partners
• All Woollam Constructions’
Sites have first aid kits.
Project Manager – • First Aid Providers’ names and
Provide first aid equipment and Site Manager - contact numbers posted in the
maintain first aid stocks. Site HSE Adviser - crib room and site office.
HSEQT Manager - • Contract Partners to provide
name and contact details for
their first aid providers
• Site induction for all Woollam
Constructions employees,
Contract Partners, and visitors.
Manage accident and emergency Site Manager -
• Emergency Evacuation Drill
procedures. Site HSE Adviser -
• Registers updated regularly.
• Regular inspections of first aid
kit contents
Making sure that the Site Safety Project Manager – • Site Safety Rules developed for
Rules are available and provided to Site Manager - the Project.
WHS Management Plan / Page 44
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHS Management Plan Ozcare Noosa RACF WC OHS 002 Rev 23 4 July 2023 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.