Council archive · source document
WHS Management Plan Ozcare Noosa RACF WC OHS 002 Rev 23 4 July 2023 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy · OPW24/0118
Plans and drawings: the text below has words only, no drawings.
22. Emergency Drill Evaluation
An Emergency Drill of the site will be conducted in line and in the frequency identified in the Emergency
Preparedness and Response plan. They should be scheduled on site to ensure that they are scenario based and
test a variety of potential emergency situations.
The drill will be analysed, and any follow up actions identified. These details will be recorded on the
Emergency Drill Evaluation form on a cloud-based software system. Once all follow up actions are complete
than the evaluator shall sign the evaluation form.
This form will be kept electronically. A record is also created in Sign-Onsite.
22.1 Supporting Documents
Emergency Drill Evaluation (Procore document)
As found in Procore
WHS Management Plan / Page 41
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHS Management Plan Ozcare Noosa RACF WC OHS 002 Rev 23 4 July 2023 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.