Council archive · source document
WHS Management Plan Ozcare Noosa RACF WC OHS 002 Rev 23 4 July 2023 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy · OPW24/0118
Plans and drawings: the text below has words only, no drawings.
Activity Responsible Person Type of action and records
Constructions employees,
Contract Partner, and Visitors
• Review health risks when
conducting Safety Interactions
• Review health risks when
conducting Safety Task
Observations
• Ensure design documentation
and methodologies developed
by competent persons have
been obtained
• Ensure inspection reports and
verifications have been
obtained from competent
persons where required
• Ensure reports and verifications
have been obtained from a
geotechnical engineer where
Site Manager – required
Site HSE Adviser – • Ensure applicable Work Permits
Creation and Maintenance of
are implemented prior to
Temporary Structures Register Site Engineer – commencing work
Site Foreman - • Ensure only trained and
competent persons perform
work on site
• Ensure designer, inspector and
worker competencies and
qualifications are verified prior
to commencing work
• Ensure that SWMS are provided
for any work that involves
structural alterations or repairs
that require temporary support
to prevent collapse
WHS Management Plan / Page 46
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHS Management Plan Ozcare Noosa RACF WC OHS 002 Rev 23 4 July 2023 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.