WHS Management Plan Ozcare Noosa RACF WC OHS 002 Rev 23 4 July 2023 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy · OPW24/0118

of 62

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
High-Risk Licence – CN is required), Piling Rigs,
Scissor lifts

There are other High-Risk Licences, as defined in Schedule 3 of the WHS Regulations, but are not generally found on
Woollam Constructions sites. These are as follows:
   •    Crane Operation – derrick crane (CD), portal boom crane (CP), bridge and gantry crane (CB),
   •    Pressure Equipment Operation – standard boiler operation (BS), advanced boiler operation (BA), turbine
        operation (TO) and reciprocating steam engine (ES)
   •    Order picking forklift truck (LO)
   •    Reach stacker (RS)


  29.1 High-Risk Construction Work
  Under current legislation all High-Risk Construction Work activities require a Safe Work Method Statement.
  High Risk Construction Work is defined as work that:
  a) involves a risk of a person falling more than 2 metres, or
  b) is carried out on a telecommunication tower, or
  c) involves demolition of an element of a structure that is loadbearing or otherwise related to the physical
       integrity of the structure, or
  d) involves, or is likely to involve, the disturbance of asbestos, or
  e) involves structural alterations or repairs that require temporary support to prevent collapse, or
  f) is carried out in or near a confined space, or
  g) is carried out in or nearby:
      i.     a shaft or trench with an excavated depth greater than 1.5 metres, or
     ii.     a tunnel, or
  h) involves the use of explosives, or
  i) is carried out on or near pressurised gas distribution mains or piping, or
  j) is carried out on or near chemical, fuel or refrigerant lines, or
  k) is carried out on or near energised electrical installations or services, or
  l) is carried out in an area that may have a contaminated or flammable atmosphere, or
  m) involves tilt-up or precast concrete, or
  n) is carried out on, in or adjacent to a road, railway, shipping lane or other traffic corridor that is in use by
       traffic other than pedestrians, or
  o) is carried out in an area at a workplace in which there is any movement of powered mobile plant, or
  p) is carried out in an area in which there are artificial extremes of temperature, or
  q) is carried out in or near water or other liquid that involves a risk of drowning, or
  r) involves diving work.




                                                                                        WHS Management Plan / Page 53

Used in these records

About this file

File size
1.3 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHS Management Plan Ozcare Noosa RACF WC OHS 002 Rev 23 4 July 2023 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads -.pdf · 1.3 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.