Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

5179Flood Report_REV_3

of 27

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

                                                                                      Callaghan & Toth




1.        BYPASS CAPACITY

The bypass facility is a 525 mm pipe along Spotted Gum Court in the adjoining development to the
south.

That bypass pipe was originally intended to have a Q5 capacity.

Callaghan & Toth’s 2018 Council-approved HGL tabulation for the bypass pipe indicates a design flow
rate of 0.434 m3/sec at a HWL of 104.602 (c.f. surface level of 105.359) and a TWL of 102.185.

 Qcap = [ (105.359 – 102.185) / (104.602 – 101.805) ]0.5 x 0.434 = 0.46 m3/sec.




2.        DESIGN RAINFALL INTENSITIES
Based on ARR 1987




                                                                                                F
2035 2 Pearsons Road – Flood Study – Revision 3                                    April 2021
Log in to download the original file

5179Flood Report_REV_3.pdf · 3.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.