Original source · versioned page text
5179Flood Report_REV_3
ail Callaghan & Toth 3. RATIONAL METHOD FLOWS — PRE DEVELOPMENT ATCHMENT BDY 50m Catchment Area = 1.80 (Pearsons Rd) + 1.47 (Elm St) = 3.27 Ha C10 Runoff Coefficients: 0.69 (Pearsons Rd) and 0.79 (Elm St) Concentration Times: From Elm St: 8m sheet flow @ 1% = 8.0 mins 60 m swale flow @ 1% = 4.0 mins 80 m pipe/path @ 4% @1m/s_ =1.3 mins 57 m pipe/road @ [email protected]/s = 0.7 mins 175 m swale/gully@ 1m/s = 3.0 mins Total: 17 mins From Pearsons Rd: 190 m sheet flow @6% = 18mins Adopt: 18 mins. Q100 = (0.00278 x 1.20 x 0.69 x 190 x 1.80) + [(0.00278 x 1.20 x 0.79 x 190 x 1.47) — 0.46] = 1.07 m/sec Q20 = (0.00278 x 1.05 x 0.69 x 148 x 1.80) + [(0.00278 x 1.05 x 0.79 x 148 x 1.47) — 0.46] = 0.58 m°/sec Q5 = (0.00278 x 0.95 x 0.69 x 120 x 1.80) + [(0.00278 x 0.95 x 0.79 x 120 x 1.47) — 0.46] = 0.39 m/sec Q1 = 0.00278 x 0.80 x 0.69 x 74 x 1.83 = 0.20 m/sec 2035 2 Pearsons Road — Flood Study — Revision 3 April 2021
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.