Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

5179Flood Report_REV_3

of 27

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

ail

Callaghan & Toth

 

3. RATIONAL METHOD FLOWS — PRE DEVELOPMENT

 

ATCHMENT BDY 50m

 

Catchment Area = 1.80 (Pearsons Rd) + 1.47 (Elm St) = 3.27 Ha
C10 Runoff Coefficients: 0.69 (Pearsons Rd) and 0.79 (Elm St)

Concentration Times:

From Elm St: 8m sheet flow @ 1% = 8.0 mins
60 m swale flow @ 1% = 4.0 mins
80 m pipe/path @ 4% @1m/s_ =1.3 mins
57 m pipe/road @ [email protected]/s = 0.7 mins

175 m swale/gully@ 1m/s = 3.0 mins
Total: 17 mins
From Pearsons Rd: 190 m sheet flow @6% = 18mins

Adopt: 18 mins.

Q100 = (0.00278 x 1.20 x 0.69 x 190 x 1.80) + [(0.00278 x 1.20 x 0.79 x 190 x 1.47) — 0.46] = 1.07
m/sec

Q20 = (0.00278 x 1.05 x 0.69 x 148 x 1.80) + [(0.00278 x 1.05 x 0.79 x 148 x 1.47) — 0.46] = 0.58
m°/sec

Q5 = (0.00278 x 0.95 x 0.69 x 120 x 1.80) + [(0.00278 x 0.95 x 0.79 x 120 x 1.47) — 0.46] = 0.39
m/sec

Q1 = 0.00278 x 0.80 x 0.69 x 74 x 1.83 = 0.20 m/sec

 

2035 2 Pearsons Road — Flood Study — Revision 3 April 2021
Log in to download the original file

5179Flood Report_REV_3.pdf · 3.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.