Skip to the record
The gold standard in government transparency.

Original source · versioned page text

5179Flood Report_REV_3

of 27

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

ail

Callaghan & Toth

 

1 Pluviographs:

Location. ARR_TEMPORAL_DATA
13 Subareas:

1234567

8 9 10 11 12 13

End of Pluviograph Data.

End of Gauging Station Data.

5. RATIONAL METHOD FLOWS —- POST DEVELOPMENT

ae

 

Catchment Area = 1.80 (Pearsons Rd) + 1.47 (Elm St) = 3.27 Ha
C10 Runoff Coefficients: 0.78 (Pearsons Rd) and 0.79 (Elm St)
Concentration Times:

From Pearsons Rd: 60m sheet flow @ 4% = 13.0 mins
45m driveway @ [email protected] m/sec = 1.5 mins

60m pipe/road @ [email protected] m/sec = 0.4 mins
60 m swale @ 3% = 0.8 mins
Total: 15.7 mins
From Elm St: 8m sheet flow @ 1% = 8.0 mins
60 m swale flow @ 1% = 4.0 mins
80 m pipe/path @ 4% @ 1m/s = 1.3 mins
57 m pipe/road @ [email protected]/s = 0.7 mins
78 m swale/path @ 1m/s = 1.6 mins
60m pipe/road @ [email protected] m/sec = 0.4 mins
60 m swale @ 3% = 0.8 mins

 

2035 2 Pearsons Road — Flood Study — Revision 3 April 2021
Log in to download the original file

5179Flood Report_REV_3.pdf · 3.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.