Original source · versioned page text
5179Flood Report_REV_3
Callaghan & Toth
4. URBS CATCHMENT FILE – PRE DEVELOPMENT
2 Pearson Rd Cooroy - Existing.cat
Model: Basic
Uses: L U I
Default Parameters: alpha=1.20 m=0.8
13 Subareas of Area:
0.0011 0.0010 0.0036 0.0032 0.0032 0.0026 0.0041
0.0022 0.0041 0.0025 0.0031 0.0016 0.0004
Factor=1.50
Rain # 1 L=0.030 U=0.00
Route L=0.030 U=0.25
Store.
Rain # 2 L=0.015 U=0.00
Get.
Route L=0.030 U=0.25
Store.
Rain # 3 L=0.020 U=0.20 I=0.55
Get.
Route L=0.045 U=0.20
Store.
Rain # 4 L=0.020 U=0.20 I=0.55
Route L=0.056 U=0.20
Get.
Route L=0.036 U=0.50
Store.
Rain # 5 L=0.030 U=0.25 I=0.55
Store.
Rain # 6 L=0.030 U=0.25 I=0.55
Get.
Get.
Print. TMR1
Loss C=0.46
{Throws away everything up to 0.46 m3/s}
Print.TMR2
Route L=0.060 U=0.00
Store.
Factor=1.00
Rain # 7 L=0.051 U=0.00 I=0.20
Add Rain # 8 L=0.027 U=0.00 I=0.00
Get.
Route L=0.093 U=0.00
Store.
Rain # 9 L=0.033 U=0.00 I=0.00
Get.
Route L=0.039 U=0.00
Store.
Rain # 10 L=0.075 U=0.00 I=0.02
Add Rain # 11 L=0.066 U=0.00 I=0.00
Get.
Store.
Rain # 12 L=0.022 U=0.00 I=0.00
Store.
Rain # 13 L=0.018 U=0.00 I=0.00
Get.
Get.
Print. OUT
End of Catchment Definition.
H
2035 2 Pearsons Road – Flood Study – Revision 3 April 2021
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.