NOOSA COUNCIL IDAS Development Application Decision Notice                                                   7 of 16


49.    All water meters must be located outside the property boundary and in an easily assessable location to
       facilitate unhindered reading by Council and/or Council’s contracted water meter readers, and not behind
       fences or locked gates. In this regard approval of the water meter configuration and location must be
       obtained from Council’s Water & Sewerage Capital Works Manager prior to lodgement and approval of
       hydraulic drawings.

50.    For Multiple Uses (including Building Format Plans, Group Title Plans, etc) the development shall be
       served by:

       50.1. A single Body Corporate water meter to measure the total water consumption (including fire hose
             reels, but excluding fire hydrants and fire sprinkler systems), and

       50.2. Individual water meters to each tenement capable of being separately rated, and

       50.3. A fire service (fully testable single detector check with metered bypass), where applicable, for flows
             to fire hydrants and fire sprinkler systems (excluding fire hose reels).
Service Easements (Sewer)
51.    Deleted.

52.    No building or other structure shall be constructed or encroach over an easement.
Earthworks
53.    Earthworks required on site shall be carried out in accordance with Section 3.8 of Council’s Engineering
       Design Standards Manual and so as not to cause the additional ponding of water on any adjoining lands
       or the blockage of, or interference with, any natural watercourses.

54.    Earthworks carried out on site should not affect the structural integrity of any of the existing fences and/or
       structures and/or buildings and/or services and/or lands that border the development site. Fences that
       are affected shall be replaced at the cost of the applicant.

55.    The use of vibratory equipment of any kind is not permitted to be used (including vibrating rollers and the
       use of vibrating installation techniques for sheet piling and other construction vibrations caused by
       excavating, earthmoving or demolition machinery or other similar construction techniques) unless
       approved and supervised by a Certified Geotechnical Engineer. Under such circumstances the operator
       of such equipment shall at all times comply with the directions of the Geotechnical engineer.
Site Stability
56.    A Geotechnical Engineer or similar qualified expert shall assess the soil condition on site, determine the
       soil classification, establish whether any measures are required to protect the stability of adjoining
       buildings and/or structures and/or services and/or lands, and make recommendations on the type of
       foundation system(s) best suited for the proposed development. The recommendations of this report shall
       be incorporated into the design and construction of the proposed development.

57.    Should the recommendations of the geotechnical report require any part of the works (including
       excavation, retaining structures, tie backs etc) to be temporarily or permanently constructed within any
       adjoining property a letter of authority from the adjoining property should be obtained.

58.    The excavation of the site and the construction of the proposed works should not have any adverse
       affects on the stability of adjoining buildings and/or structures and/or services and/or lands. In this regard
       a Registered Professional Engineer Queensland should supervise the excavation of the site and the
       construction of the new works to determine whether any additional measures are required to protect the
       stability of adjoining buildings and/or structures and/or services and/or lands.
Construction Issues
59.    A Traffic Management Plan for the each separate demolition and construction phase of the development
       shall be submitted to and approved by Council at least 5 working days prior to the commencement of any
       Demolition or Building works or at least 5 working days prior to the pre-start meeting for Operational
       Works. The Traffic Management Plan shall include but not be limited to:

       59.1. Limiting the routes for the heavy vehicles to the major road network and prohibit the use of the
             local roads as access to the site;

       59.2. Indicate provision for on-site parking for the required workforce;




MSOffice c:\docume~1\shesse\locals~1\temp\bcl technologies\easypdf 5\@bcl@ec1203b7\@[email protected]

Used in these records

About this file

File size
156 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SUPERSEDED Negotiated Decision Notice [As Published].pdf · 156 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.